Object
Nottinghamshire Minerals Local Plan Publication Version
Representation ID: 232
Received: 11/10/2019
Respondent: Brett Aggregates Limited
Legally compliant? No
Sound? No
Duty to co-operate? No
Representation Summary:
In respect of Policy MP2 additional sites will need to be allocated. As currently the policy only provides for an additional 11.8MT to be added to the current landbank when the actual shortfall is 60.82MT. This means that additionally a further 49.02MT of reserves are needed to make the plan sound. BAL propose that the It should be noted that the existing reserves identified in Policy MP2 add up to a higher figure (23.31MT) than that used in the following justifying paragraphs site at Shelford which is capable of delivering a total of 6.5MT should be allocated.
Full text:
See attachments