SP7 - Green Belt
Support
Pre- Submission Draft Waste Local Plan
Representation ID: 920
Received: 08/10/2023
Respondent: Susan Edwards
I fully support this objective but the granting of planning permission for the EMERGE incinerator at Ratcliffe on Soar does not follow these guidelines. What are the very special circumstances that led to this facility, that is due to process 525,000tpa of waste, being granted planning permission in the green belt? As the local waste plan has estimated only 180,494tpa deficiency in capacity in 2038 how can a 525,000tpa facility be justified especially as a further 340,000tpa of EfW capacity is already planned elsewhere in Nottinghamshire?
I fully support this objective but the granting of planning permission for the EMERGE incinerator at Ratcliffe on Soar does not follow these guidelines. What are the very special circumstances that led to this facility, that is due to process 525,000tpa of waste, being granted planning permission in the green belt? As the local waste plan has estimated only 180,494tpa deficiency in capacity in 2038 how can a 525,000tpa facility be justified especially as a further 340,000tpa of EfW capacity is already planned elsewhere in Nottinghamshire?
Support
Pre- Submission Draft Waste Local Plan
Representation ID: 958
Received: 09/10/2023
Respondent: Gedling Borough Council
Policy SP7 reflects National Planning Policy and is supported.
Policy SP7 reflects National Planning Policy and is supported.