Minerals Local Plan Issues and Options consultation

Search representations

Results for Rushcliffe Borough Council search

New search New search

Comment

Minerals Local Plan Issues and Options consultation

Q1 Do you think any further information should be included in the overview of the area?

Representation ID: 30571

Received: 05/01/2018

Respondent: Rushcliffe Borough Council

Representation Summary:

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Full text:

Dear Sir/Madam

Nottinghamshire Minerals Local Plan Issues and Options

Thank you for consulting Rushcliffe Borough Council on the Minerals Local Plan Issues and Options and supporting Sustainability Appraisal Scoping Report.
Having read the document, please accept the following responses to selected questions which are pertinent to minerals developments in Rushcliffe.

Minerals Local Plan

Q1 Do you think any further information should be included in the overview of the area?

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Q2 Do you agree with the draft vision? Are there other things we should include?

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes. Whilst these are important considerations, the location of minerals development should also consider environmental constraints (including impacts on the natural environment and local communities).
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF (avoid, mitigate and last resort compensate), prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. The fourth paragraph should read:

"All minerals workings will contribute towards a greener Nottinghamshire by ensuring that the County's diverse environmental and historic assets are protected, maintained and enhanced through the sensitive selection of minerals sites, appropriate working, restoration and after use."

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Rushcliffe Borough Council supports the key strategic issues.

Q4 Do you think the average 10 years sales figure is the most suitable methodology for forecasting future aggregate demand in Nottinghamshire? If not please identify any alternatives you feel are realistic and deliverable and the evidence to support this approach.

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Q6 Do you think extensions to existing permitted quarries should be prioritised over new green field quarries?

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County (i.e. Idle Valley, near Newark and near Nottingham) to minimise the distance minerals are transported to markets?

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Q9 Would it be more appropriate to prioritise specific areas above others?

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Q17 Should the plan seek to identify specific site allocations for gypsum provision or should a criteria based policy be developed to ensure an adequate supply of gypsum can be maintained over the plan period?

As permitted reserves exist at East Leake and Balderton (these should be sufficient to 2026 and 2027 respectively) and there is considerable uncertainty regarding future demand beyond this date (due to the closure of coal fired power stations which provide desulphogypsum and unknown future demand for specific grades of gypsum during the plan period), Rushcliffe Borough Council support the use of criteria based policy rather than the identification of specific site allocations.

Q18 are you aware of any issues regarding the provision of gypsum that should be considered as part of the Minerals Local Plan review?

Rushcliffe Borough Council notes that the Issues and Options consultation identifies the closure of coal fired power stations, including the Ratcliffe on Soar Power Station, by 2025 and the

subsequent reduction in supply of desulphogypsum. As recognised, this may have particular implications for the demand for Gypsum resources in Rushcliffe.

Q24 Are you aware of any issues relating to hydrocarbon extraction that should be considered through the Minerals Local Plan review?

Rushcliffe Borough Council supports the inclusion of criteria based policies which protect local communities and the natural environment from unacceptable direct and indirect environmental impacts of hydrocarbon extraction facilities during their construction and operation.

Q25 Do you agree with the proposed development management policy areas? Are there any others that should be covered?

Rushcliffe Borough Council welcomes and supports the development management policies proposed.

Sustainability Appraisal Scoping Report

Having read the SA Scoping Report, Rushcliffe Borough Council supports: the methodology proposed; the main sustainability issues identified; the documents that form the evidence base; and the SA objectives and decision making criteria. We have no detailed comments on the SA at this stage.

We look forward to reviewing the next iteration of the Minerals Local Plan and supporting SA in due course.

This concludes Rushcliffe Borough Council's representation.

If you would like to discuss our comments on the emerging plan, please feel free to contact me. Yours sincerely

John King MRTPI Planning Policy Officer
Rushcliffe Borough Council.

Comment

Minerals Local Plan Issues and Options consultation

Q2 Do you agree with the draft vision? Are there other things we should include?

Representation ID: 30572

Received: 05/01/2018

Respondent: Rushcliffe Borough Council

Representation Summary:

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes.
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF, prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. "

Full text:

Dear Sir/Madam

Nottinghamshire Minerals Local Plan Issues and Options

Thank you for consulting Rushcliffe Borough Council on the Minerals Local Plan Issues and Options and supporting Sustainability Appraisal Scoping Report.
Having read the document, please accept the following responses to selected questions which are pertinent to minerals developments in Rushcliffe.

Minerals Local Plan

Q1 Do you think any further information should be included in the overview of the area?

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Q2 Do you agree with the draft vision? Are there other things we should include?

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes. Whilst these are important considerations, the location of minerals development should also consider environmental constraints (including impacts on the natural environment and local communities).
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF (avoid, mitigate and last resort compensate), prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. The fourth paragraph should read:

"All minerals workings will contribute towards a greener Nottinghamshire by ensuring that the County's diverse environmental and historic assets are protected, maintained and enhanced through the sensitive selection of minerals sites, appropriate working, restoration and after use."

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Rushcliffe Borough Council supports the key strategic issues.

Q4 Do you think the average 10 years sales figure is the most suitable methodology for forecasting future aggregate demand in Nottinghamshire? If not please identify any alternatives you feel are realistic and deliverable and the evidence to support this approach.

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Q6 Do you think extensions to existing permitted quarries should be prioritised over new green field quarries?

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County (i.e. Idle Valley, near Newark and near Nottingham) to minimise the distance minerals are transported to markets?

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Q9 Would it be more appropriate to prioritise specific areas above others?

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Q17 Should the plan seek to identify specific site allocations for gypsum provision or should a criteria based policy be developed to ensure an adequate supply of gypsum can be maintained over the plan period?

As permitted reserves exist at East Leake and Balderton (these should be sufficient to 2026 and 2027 respectively) and there is considerable uncertainty regarding future demand beyond this date (due to the closure of coal fired power stations which provide desulphogypsum and unknown future demand for specific grades of gypsum during the plan period), Rushcliffe Borough Council support the use of criteria based policy rather than the identification of specific site allocations.

Q18 are you aware of any issues regarding the provision of gypsum that should be considered as part of the Minerals Local Plan review?

Rushcliffe Borough Council notes that the Issues and Options consultation identifies the closure of coal fired power stations, including the Ratcliffe on Soar Power Station, by 2025 and the

subsequent reduction in supply of desulphogypsum. As recognised, this may have particular implications for the demand for Gypsum resources in Rushcliffe.

Q24 Are you aware of any issues relating to hydrocarbon extraction that should be considered through the Minerals Local Plan review?

Rushcliffe Borough Council supports the inclusion of criteria based policies which protect local communities and the natural environment from unacceptable direct and indirect environmental impacts of hydrocarbon extraction facilities during their construction and operation.

Q25 Do you agree with the proposed development management policy areas? Are there any others that should be covered?

Rushcliffe Borough Council welcomes and supports the development management policies proposed.

Sustainability Appraisal Scoping Report

Having read the SA Scoping Report, Rushcliffe Borough Council supports: the methodology proposed; the main sustainability issues identified; the documents that form the evidence base; and the SA objectives and decision making criteria. We have no detailed comments on the SA at this stage.

We look forward to reviewing the next iteration of the Minerals Local Plan and supporting SA in due course.

This concludes Rushcliffe Borough Council's representation.

If you would like to discuss our comments on the emerging plan, please feel free to contact me. Yours sincerely

John King MRTPI Planning Policy Officer
Rushcliffe Borough Council.

Comment

Minerals Local Plan Issues and Options consultation

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Representation ID: 30573

Received: 05/01/2018

Respondent: Rushcliffe Borough Council

Representation Summary:

Rushcliffe Borough Council supports the key strategic issues.

Full text:

Dear Sir/Madam

Nottinghamshire Minerals Local Plan Issues and Options

Thank you for consulting Rushcliffe Borough Council on the Minerals Local Plan Issues and Options and supporting Sustainability Appraisal Scoping Report.
Having read the document, please accept the following responses to selected questions which are pertinent to minerals developments in Rushcliffe.

Minerals Local Plan

Q1 Do you think any further information should be included in the overview of the area?

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Q2 Do you agree with the draft vision? Are there other things we should include?

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes. Whilst these are important considerations, the location of minerals development should also consider environmental constraints (including impacts on the natural environment and local communities).
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF (avoid, mitigate and last resort compensate), prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. The fourth paragraph should read:

"All minerals workings will contribute towards a greener Nottinghamshire by ensuring that the County's diverse environmental and historic assets are protected, maintained and enhanced through the sensitive selection of minerals sites, appropriate working, restoration and after use."

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Rushcliffe Borough Council supports the key strategic issues.

Q4 Do you think the average 10 years sales figure is the most suitable methodology for forecasting future aggregate demand in Nottinghamshire? If not please identify any alternatives you feel are realistic and deliverable and the evidence to support this approach.

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Q6 Do you think extensions to existing permitted quarries should be prioritised over new green field quarries?

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County (i.e. Idle Valley, near Newark and near Nottingham) to minimise the distance minerals are transported to markets?

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Q9 Would it be more appropriate to prioritise specific areas above others?

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Q17 Should the plan seek to identify specific site allocations for gypsum provision or should a criteria based policy be developed to ensure an adequate supply of gypsum can be maintained over the plan period?

As permitted reserves exist at East Leake and Balderton (these should be sufficient to 2026 and 2027 respectively) and there is considerable uncertainty regarding future demand beyond this date (due to the closure of coal fired power stations which provide desulphogypsum and unknown future demand for specific grades of gypsum during the plan period), Rushcliffe Borough Council support the use of criteria based policy rather than the identification of specific site allocations.

Q18 are you aware of any issues regarding the provision of gypsum that should be considered as part of the Minerals Local Plan review?

Rushcliffe Borough Council notes that the Issues and Options consultation identifies the closure of coal fired power stations, including the Ratcliffe on Soar Power Station, by 2025 and the

subsequent reduction in supply of desulphogypsum. As recognised, this may have particular implications for the demand for Gypsum resources in Rushcliffe.

Q24 Are you aware of any issues relating to hydrocarbon extraction that should be considered through the Minerals Local Plan review?

Rushcliffe Borough Council supports the inclusion of criteria based policies which protect local communities and the natural environment from unacceptable direct and indirect environmental impacts of hydrocarbon extraction facilities during their construction and operation.

Q25 Do you agree with the proposed development management policy areas? Are there any others that should be covered?

Rushcliffe Borough Council welcomes and supports the development management policies proposed.

Sustainability Appraisal Scoping Report

Having read the SA Scoping Report, Rushcliffe Borough Council supports: the methodology proposed; the main sustainability issues identified; the documents that form the evidence base; and the SA objectives and decision making criteria. We have no detailed comments on the SA at this stage.

We look forward to reviewing the next iteration of the Minerals Local Plan and supporting SA in due course.

This concludes Rushcliffe Borough Council's representation.

If you would like to discuss our comments on the emerging plan, please feel free to contact me. Yours sincerely

John King MRTPI Planning Policy Officer
Rushcliffe Borough Council.

Comment

Minerals Local Plan Issues and Options consultation

Q4 Do you think the average 10 year sales figure is the most suitable methodology for forecasting future demand in Nottinghamshire? If not please identify any alternatives

Representation ID: 30574

Received: 05/01/2018

Respondent: Rushcliffe Borough Council

Representation Summary:

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Full text:

Dear Sir/Madam

Nottinghamshire Minerals Local Plan Issues and Options

Thank you for consulting Rushcliffe Borough Council on the Minerals Local Plan Issues and Options and supporting Sustainability Appraisal Scoping Report.
Having read the document, please accept the following responses to selected questions which are pertinent to minerals developments in Rushcliffe.

Minerals Local Plan

Q1 Do you think any further information should be included in the overview of the area?

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Q2 Do you agree with the draft vision? Are there other things we should include?

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes. Whilst these are important considerations, the location of minerals development should also consider environmental constraints (including impacts on the natural environment and local communities).
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF (avoid, mitigate and last resort compensate), prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. The fourth paragraph should read:

"All minerals workings will contribute towards a greener Nottinghamshire by ensuring that the County's diverse environmental and historic assets are protected, maintained and enhanced through the sensitive selection of minerals sites, appropriate working, restoration and after use."

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Rushcliffe Borough Council supports the key strategic issues.

Q4 Do you think the average 10 years sales figure is the most suitable methodology for forecasting future aggregate demand in Nottinghamshire? If not please identify any alternatives you feel are realistic and deliverable and the evidence to support this approach.

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Q6 Do you think extensions to existing permitted quarries should be prioritised over new green field quarries?

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County (i.e. Idle Valley, near Newark and near Nottingham) to minimise the distance minerals are transported to markets?

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Q9 Would it be more appropriate to prioritise specific areas above others?

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Q17 Should the plan seek to identify specific site allocations for gypsum provision or should a criteria based policy be developed to ensure an adequate supply of gypsum can be maintained over the plan period?

As permitted reserves exist at East Leake and Balderton (these should be sufficient to 2026 and 2027 respectively) and there is considerable uncertainty regarding future demand beyond this date (due to the closure of coal fired power stations which provide desulphogypsum and unknown future demand for specific grades of gypsum during the plan period), Rushcliffe Borough Council support the use of criteria based policy rather than the identification of specific site allocations.

Q18 are you aware of any issues regarding the provision of gypsum that should be considered as part of the Minerals Local Plan review?

Rushcliffe Borough Council notes that the Issues and Options consultation identifies the closure of coal fired power stations, including the Ratcliffe on Soar Power Station, by 2025 and the

subsequent reduction in supply of desulphogypsum. As recognised, this may have particular implications for the demand for Gypsum resources in Rushcliffe.

Q24 Are you aware of any issues relating to hydrocarbon extraction that should be considered through the Minerals Local Plan review?

Rushcliffe Borough Council supports the inclusion of criteria based policies which protect local communities and the natural environment from unacceptable direct and indirect environmental impacts of hydrocarbon extraction facilities during their construction and operation.

Q25 Do you agree with the proposed development management policy areas? Are there any others that should be covered?

Rushcliffe Borough Council welcomes and supports the development management policies proposed.

Sustainability Appraisal Scoping Report

Having read the SA Scoping Report, Rushcliffe Borough Council supports: the methodology proposed; the main sustainability issues identified; the documents that form the evidence base; and the SA objectives and decision making criteria. We have no detailed comments on the SA at this stage.

We look forward to reviewing the next iteration of the Minerals Local Plan and supporting SA in due course.

This concludes Rushcliffe Borough Council's representation.

If you would like to discuss our comments on the emerging plan, please feel free to contact me. Yours sincerely

John King MRTPI Planning Policy Officer
Rushcliffe Borough Council.

Comment

Minerals Local Plan Issues and Options consultation

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

Representation ID: 30575

Received: 05/01/2018

Respondent: Rushcliffe Borough Council

Representation Summary:

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Full text:

Dear Sir/Madam

Nottinghamshire Minerals Local Plan Issues and Options

Thank you for consulting Rushcliffe Borough Council on the Minerals Local Plan Issues and Options and supporting Sustainability Appraisal Scoping Report.
Having read the document, please accept the following responses to selected questions which are pertinent to minerals developments in Rushcliffe.

Minerals Local Plan

Q1 Do you think any further information should be included in the overview of the area?

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Q2 Do you agree with the draft vision? Are there other things we should include?

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes. Whilst these are important considerations, the location of minerals development should also consider environmental constraints (including impacts on the natural environment and local communities).
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF (avoid, mitigate and last resort compensate), prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. The fourth paragraph should read:

"All minerals workings will contribute towards a greener Nottinghamshire by ensuring that the County's diverse environmental and historic assets are protected, maintained and enhanced through the sensitive selection of minerals sites, appropriate working, restoration and after use."

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Rushcliffe Borough Council supports the key strategic issues.

Q4 Do you think the average 10 years sales figure is the most suitable methodology for forecasting future aggregate demand in Nottinghamshire? If not please identify any alternatives you feel are realistic and deliverable and the evidence to support this approach.

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Q6 Do you think extensions to existing permitted quarries should be prioritised over new green field quarries?

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County (i.e. Idle Valley, near Newark and near Nottingham) to minimise the distance minerals are transported to markets?

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Q9 Would it be more appropriate to prioritise specific areas above others?

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Q17 Should the plan seek to identify specific site allocations for gypsum provision or should a criteria based policy be developed to ensure an adequate supply of gypsum can be maintained over the plan period?

As permitted reserves exist at East Leake and Balderton (these should be sufficient to 2026 and 2027 respectively) and there is considerable uncertainty regarding future demand beyond this date (due to the closure of coal fired power stations which provide desulphogypsum and unknown future demand for specific grades of gypsum during the plan period), Rushcliffe Borough Council support the use of criteria based policy rather than the identification of specific site allocations.

Q18 are you aware of any issues regarding the provision of gypsum that should be considered as part of the Minerals Local Plan review?

Rushcliffe Borough Council notes that the Issues and Options consultation identifies the closure of coal fired power stations, including the Ratcliffe on Soar Power Station, by 2025 and the

subsequent reduction in supply of desulphogypsum. As recognised, this may have particular implications for the demand for Gypsum resources in Rushcliffe.

Q24 Are you aware of any issues relating to hydrocarbon extraction that should be considered through the Minerals Local Plan review?

Rushcliffe Borough Council supports the inclusion of criteria based policies which protect local communities and the natural environment from unacceptable direct and indirect environmental impacts of hydrocarbon extraction facilities during their construction and operation.

Q25 Do you agree with the proposed development management policy areas? Are there any others that should be covered?

Rushcliffe Borough Council welcomes and supports the development management policies proposed.

Sustainability Appraisal Scoping Report

Having read the SA Scoping Report, Rushcliffe Borough Council supports: the methodology proposed; the main sustainability issues identified; the documents that form the evidence base; and the SA objectives and decision making criteria. We have no detailed comments on the SA at this stage.

We look forward to reviewing the next iteration of the Minerals Local Plan and supporting SA in due course.

This concludes Rushcliffe Borough Council's representation.

If you would like to discuss our comments on the emerging plan, please feel free to contact me. Yours sincerely

John King MRTPI Planning Policy Officer
Rushcliffe Borough Council.

Comment

Minerals Local Plan Issues and Options consultation

Q6 Do you think extensions to existing permitted quarries should be prioritised over new greenfield quarries

Representation ID: 30576

Received: 05/01/2018

Respondent: Rushcliffe Borough Council

Representation Summary:

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Full text:

Dear Sir/Madam

Nottinghamshire Minerals Local Plan Issues and Options

Thank you for consulting Rushcliffe Borough Council on the Minerals Local Plan Issues and Options and supporting Sustainability Appraisal Scoping Report.
Having read the document, please accept the following responses to selected questions which are pertinent to minerals developments in Rushcliffe.

Minerals Local Plan

Q1 Do you think any further information should be included in the overview of the area?

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Q2 Do you agree with the draft vision? Are there other things we should include?

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes. Whilst these are important considerations, the location of minerals development should also consider environmental constraints (including impacts on the natural environment and local communities).
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF (avoid, mitigate and last resort compensate), prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. The fourth paragraph should read:

"All minerals workings will contribute towards a greener Nottinghamshire by ensuring that the County's diverse environmental and historic assets are protected, maintained and enhanced through the sensitive selection of minerals sites, appropriate working, restoration and after use."

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Rushcliffe Borough Council supports the key strategic issues.

Q4 Do you think the average 10 years sales figure is the most suitable methodology for forecasting future aggregate demand in Nottinghamshire? If not please identify any alternatives you feel are realistic and deliverable and the evidence to support this approach.

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Q6 Do you think extensions to existing permitted quarries should be prioritised over new green field quarries?

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County (i.e. Idle Valley, near Newark and near Nottingham) to minimise the distance minerals are transported to markets?

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Q9 Would it be more appropriate to prioritise specific areas above others?

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Q17 Should the plan seek to identify specific site allocations for gypsum provision or should a criteria based policy be developed to ensure an adequate supply of gypsum can be maintained over the plan period?

As permitted reserves exist at East Leake and Balderton (these should be sufficient to 2026 and 2027 respectively) and there is considerable uncertainty regarding future demand beyond this date (due to the closure of coal fired power stations which provide desulphogypsum and unknown future demand for specific grades of gypsum during the plan period), Rushcliffe Borough Council support the use of criteria based policy rather than the identification of specific site allocations.

Q18 are you aware of any issues regarding the provision of gypsum that should be considered as part of the Minerals Local Plan review?

Rushcliffe Borough Council notes that the Issues and Options consultation identifies the closure of coal fired power stations, including the Ratcliffe on Soar Power Station, by 2025 and the

subsequent reduction in supply of desulphogypsum. As recognised, this may have particular implications for the demand for Gypsum resources in Rushcliffe.

Q24 Are you aware of any issues relating to hydrocarbon extraction that should be considered through the Minerals Local Plan review?

Rushcliffe Borough Council supports the inclusion of criteria based policies which protect local communities and the natural environment from unacceptable direct and indirect environmental impacts of hydrocarbon extraction facilities during their construction and operation.

Q25 Do you agree with the proposed development management policy areas? Are there any others that should be covered?

Rushcliffe Borough Council welcomes and supports the development management policies proposed.

Sustainability Appraisal Scoping Report

Having read the SA Scoping Report, Rushcliffe Borough Council supports: the methodology proposed; the main sustainability issues identified; the documents that form the evidence base; and the SA objectives and decision making criteria. We have no detailed comments on the SA at this stage.

We look forward to reviewing the next iteration of the Minerals Local Plan and supporting SA in due course.

This concludes Rushcliffe Borough Council's representation.

If you would like to discuss our comments on the emerging plan, please feel free to contact me. Yours sincerely

John King MRTPI Planning Policy Officer
Rushcliffe Borough Council.

Comment

Minerals Local Plan Issues and Options consultation

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Representation ID: 30577

Received: 05/01/2018

Respondent: Rushcliffe Borough Council

Representation Summary:

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Full text:

Dear Sir/Madam

Nottinghamshire Minerals Local Plan Issues and Options

Thank you for consulting Rushcliffe Borough Council on the Minerals Local Plan Issues and Options and supporting Sustainability Appraisal Scoping Report.
Having read the document, please accept the following responses to selected questions which are pertinent to minerals developments in Rushcliffe.

Minerals Local Plan

Q1 Do you think any further information should be included in the overview of the area?

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Q2 Do you agree with the draft vision? Are there other things we should include?

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes. Whilst these are important considerations, the location of minerals development should also consider environmental constraints (including impacts on the natural environment and local communities).
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF (avoid, mitigate and last resort compensate), prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. The fourth paragraph should read:

"All minerals workings will contribute towards a greener Nottinghamshire by ensuring that the County's diverse environmental and historic assets are protected, maintained and enhanced through the sensitive selection of minerals sites, appropriate working, restoration and after use."

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Rushcliffe Borough Council supports the key strategic issues.

Q4 Do you think the average 10 years sales figure is the most suitable methodology for forecasting future aggregate demand in Nottinghamshire? If not please identify any alternatives you feel are realistic and deliverable and the evidence to support this approach.

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Q6 Do you think extensions to existing permitted quarries should be prioritised over new green field quarries?

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County (i.e. Idle Valley, near Newark and near Nottingham) to minimise the distance minerals are transported to markets?

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Q9 Would it be more appropriate to prioritise specific areas above others?

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Q17 Should the plan seek to identify specific site allocations for gypsum provision or should a criteria based policy be developed to ensure an adequate supply of gypsum can be maintained over the plan period?

As permitted reserves exist at East Leake and Balderton (these should be sufficient to 2026 and 2027 respectively) and there is considerable uncertainty regarding future demand beyond this date (due to the closure of coal fired power stations which provide desulphogypsum and unknown future demand for specific grades of gypsum during the plan period), Rushcliffe Borough Council support the use of criteria based policy rather than the identification of specific site allocations.

Q18 are you aware of any issues regarding the provision of gypsum that should be considered as part of the Minerals Local Plan review?

Rushcliffe Borough Council notes that the Issues and Options consultation identifies the closure of coal fired power stations, including the Ratcliffe on Soar Power Station, by 2025 and the

subsequent reduction in supply of desulphogypsum. As recognised, this may have particular implications for the demand for Gypsum resources in Rushcliffe.

Q24 Are you aware of any issues relating to hydrocarbon extraction that should be considered through the Minerals Local Plan review?

Rushcliffe Borough Council supports the inclusion of criteria based policies which protect local communities and the natural environment from unacceptable direct and indirect environmental impacts of hydrocarbon extraction facilities during their construction and operation.

Q25 Do you agree with the proposed development management policy areas? Are there any others that should be covered?

Rushcliffe Borough Council welcomes and supports the development management policies proposed.

Sustainability Appraisal Scoping Report

Having read the SA Scoping Report, Rushcliffe Borough Council supports: the methodology proposed; the main sustainability issues identified; the documents that form the evidence base; and the SA objectives and decision making criteria. We have no detailed comments on the SA at this stage.

We look forward to reviewing the next iteration of the Minerals Local Plan and supporting SA in due course.

This concludes Rushcliffe Borough Council's representation.

If you would like to discuss our comments on the emerging plan, please feel free to contact me. Yours sincerely

John King MRTPI Planning Policy Officer
Rushcliffe Borough Council.

Comment

Minerals Local Plan Issues and Options consultation

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County to minimise transport distances

Representation ID: 30578

Received: 05/01/2018

Respondent: Rushcliffe Borough Council

Representation Summary:

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Full text:

Dear Sir/Madam

Nottinghamshire Minerals Local Plan Issues and Options

Thank you for consulting Rushcliffe Borough Council on the Minerals Local Plan Issues and Options and supporting Sustainability Appraisal Scoping Report.
Having read the document, please accept the following responses to selected questions which are pertinent to minerals developments in Rushcliffe.

Minerals Local Plan

Q1 Do you think any further information should be included in the overview of the area?

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Q2 Do you agree with the draft vision? Are there other things we should include?

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes. Whilst these are important considerations, the location of minerals development should also consider environmental constraints (including impacts on the natural environment and local communities).
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF (avoid, mitigate and last resort compensate), prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. The fourth paragraph should read:

"All minerals workings will contribute towards a greener Nottinghamshire by ensuring that the County's diverse environmental and historic assets are protected, maintained and enhanced through the sensitive selection of minerals sites, appropriate working, restoration and after use."

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Rushcliffe Borough Council supports the key strategic issues.

Q4 Do you think the average 10 years sales figure is the most suitable methodology for forecasting future aggregate demand in Nottinghamshire? If not please identify any alternatives you feel are realistic and deliverable and the evidence to support this approach.

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Q6 Do you think extensions to existing permitted quarries should be prioritised over new green field quarries?

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County (i.e. Idle Valley, near Newark and near Nottingham) to minimise the distance minerals are transported to markets?

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Q9 Would it be more appropriate to prioritise specific areas above others?

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Q17 Should the plan seek to identify specific site allocations for gypsum provision or should a criteria based policy be developed to ensure an adequate supply of gypsum can be maintained over the plan period?

As permitted reserves exist at East Leake and Balderton (these should be sufficient to 2026 and 2027 respectively) and there is considerable uncertainty regarding future demand beyond this date (due to the closure of coal fired power stations which provide desulphogypsum and unknown future demand for specific grades of gypsum during the plan period), Rushcliffe Borough Council support the use of criteria based policy rather than the identification of specific site allocations.

Q18 are you aware of any issues regarding the provision of gypsum that should be considered as part of the Minerals Local Plan review?

Rushcliffe Borough Council notes that the Issues and Options consultation identifies the closure of coal fired power stations, including the Ratcliffe on Soar Power Station, by 2025 and the

subsequent reduction in supply of desulphogypsum. As recognised, this may have particular implications for the demand for Gypsum resources in Rushcliffe.

Q24 Are you aware of any issues relating to hydrocarbon extraction that should be considered through the Minerals Local Plan review?

Rushcliffe Borough Council supports the inclusion of criteria based policies which protect local communities and the natural environment from unacceptable direct and indirect environmental impacts of hydrocarbon extraction facilities during their construction and operation.

Q25 Do you agree with the proposed development management policy areas? Are there any others that should be covered?

Rushcliffe Borough Council welcomes and supports the development management policies proposed.

Sustainability Appraisal Scoping Report

Having read the SA Scoping Report, Rushcliffe Borough Council supports: the methodology proposed; the main sustainability issues identified; the documents that form the evidence base; and the SA objectives and decision making criteria. We have no detailed comments on the SA at this stage.

We look forward to reviewing the next iteration of the Minerals Local Plan and supporting SA in due course.

This concludes Rushcliffe Borough Council's representation.

If you would like to discuss our comments on the emerging plan, please feel free to contact me. Yours sincerely

John King MRTPI Planning Policy Officer
Rushcliffe Borough Council.

Comment

Minerals Local Plan Issues and Options consultation

Q9 Would it be more appropriate to prioritise specific areas above others?

Representation ID: 30579

Received: 05/01/2018

Respondent: Rushcliffe Borough Council

Representation Summary:

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Full text:

Dear Sir/Madam

Nottinghamshire Minerals Local Plan Issues and Options

Thank you for consulting Rushcliffe Borough Council on the Minerals Local Plan Issues and Options and supporting Sustainability Appraisal Scoping Report.
Having read the document, please accept the following responses to selected questions which are pertinent to minerals developments in Rushcliffe.

Minerals Local Plan

Q1 Do you think any further information should be included in the overview of the area?

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Q2 Do you agree with the draft vision? Are there other things we should include?

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes. Whilst these are important considerations, the location of minerals development should also consider environmental constraints (including impacts on the natural environment and local communities).
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF (avoid, mitigate and last resort compensate), prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. The fourth paragraph should read:

"All minerals workings will contribute towards a greener Nottinghamshire by ensuring that the County's diverse environmental and historic assets are protected, maintained and enhanced through the sensitive selection of minerals sites, appropriate working, restoration and after use."

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Rushcliffe Borough Council supports the key strategic issues.

Q4 Do you think the average 10 years sales figure is the most suitable methodology for forecasting future aggregate demand in Nottinghamshire? If not please identify any alternatives you feel are realistic and deliverable and the evidence to support this approach.

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Q6 Do you think extensions to existing permitted quarries should be prioritised over new green field quarries?

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County (i.e. Idle Valley, near Newark and near Nottingham) to minimise the distance minerals are transported to markets?

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Q9 Would it be more appropriate to prioritise specific areas above others?

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Q17 Should the plan seek to identify specific site allocations for gypsum provision or should a criteria based policy be developed to ensure an adequate supply of gypsum can be maintained over the plan period?

As permitted reserves exist at East Leake and Balderton (these should be sufficient to 2026 and 2027 respectively) and there is considerable uncertainty regarding future demand beyond this date (due to the closure of coal fired power stations which provide desulphogypsum and unknown future demand for specific grades of gypsum during the plan period), Rushcliffe Borough Council support the use of criteria based policy rather than the identification of specific site allocations.

Q18 are you aware of any issues regarding the provision of gypsum that should be considered as part of the Minerals Local Plan review?

Rushcliffe Borough Council notes that the Issues and Options consultation identifies the closure of coal fired power stations, including the Ratcliffe on Soar Power Station, by 2025 and the

subsequent reduction in supply of desulphogypsum. As recognised, this may have particular implications for the demand for Gypsum resources in Rushcliffe.

Q24 Are you aware of any issues relating to hydrocarbon extraction that should be considered through the Minerals Local Plan review?

Rushcliffe Borough Council supports the inclusion of criteria based policies which protect local communities and the natural environment from unacceptable direct and indirect environmental impacts of hydrocarbon extraction facilities during their construction and operation.

Q25 Do you agree with the proposed development management policy areas? Are there any others that should be covered?

Rushcliffe Borough Council welcomes and supports the development management policies proposed.

Sustainability Appraisal Scoping Report

Having read the SA Scoping Report, Rushcliffe Borough Council supports: the methodology proposed; the main sustainability issues identified; the documents that form the evidence base; and the SA objectives and decision making criteria. We have no detailed comments on the SA at this stage.

We look forward to reviewing the next iteration of the Minerals Local Plan and supporting SA in due course.

This concludes Rushcliffe Borough Council's representation.

If you would like to discuss our comments on the emerging plan, please feel free to contact me. Yours sincerely

John King MRTPI Planning Policy Officer
Rushcliffe Borough Council.

Comment

Minerals Local Plan Issues and Options consultation

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Representation ID: 30580

Received: 05/01/2018

Respondent: Rushcliffe Borough Council

Representation Summary:

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Full text:

Dear Sir/Madam

Nottinghamshire Minerals Local Plan Issues and Options

Thank you for consulting Rushcliffe Borough Council on the Minerals Local Plan Issues and Options and supporting Sustainability Appraisal Scoping Report.
Having read the document, please accept the following responses to selected questions which are pertinent to minerals developments in Rushcliffe.

Minerals Local Plan

Q1 Do you think any further information should be included in the overview of the area?

Rushcliffe Borough Council considers the information within the overview sufficient as an introduction to the minerals local plan. Whilst not critical, Plan 1 (Spatial portrait of Nottinghamshire) should accurately identify the inner Green Belt around the edge of the main urban area within Rushcliffe. The removal of Green Belt land to accommodate the strategic urban extensions on land south of Clifton, at Edwalton and east of Gamston are not shown.

Q2 Do you agree with the draft vision? Are there other things we should include?

Rushcliffe Borough Council broadly supports the overarching vision.

However the vision should not prioritise proximity to major markets, growth areas and sustainable transport nodes. Whilst these are important considerations, the location of minerals development should also consider environmental constraints (including impacts on the natural environment and local communities).
Consequently the second paragraph should read:

"Within geological and wider environmental constraints, minerals development will be concentrated in locations that offer..."

Furthermore, in accordance with the mitigation hierarchy as set out in paragraph 118 of the NPPF (avoid, mitigate and last resort compensate), prioritise sites with less harmful impacts and avoids adverse impacts on the environment rather than mitigation or compensations measures such as appropriate working, restoration and after-use. The fourth paragraph should read:

"All minerals workings will contribute towards a greener Nottinghamshire by ensuring that the County's diverse environmental and historic assets are protected, maintained and enhanced through the sensitive selection of minerals sites, appropriate working, restoration and after use."

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Rushcliffe Borough Council supports the key strategic issues.

Q4 Do you think the average 10 years sales figure is the most suitable methodology for forecasting future aggregate demand in Nottinghamshire? If not please identify any alternatives you feel are realistic and deliverable and the evidence to support this approach.

Rushcliffe Borough Council supports the use of the average 10 years sales figures as the basis for forecasting future aggregate demand in Nottinghamshire. This methodology is required by paragraph 145. However, other local information may be used to support this forecasting.

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

The same methodology should be used for each aggregate, however as stated above local factors may have implications for different aggregates.

Q6 Do you think extensions to existing permitted quarries should be prioritised over new green field quarries?

Subject to any environmental constraints, Rushcliffe Borough Council support the prioritisation of extensions to existing permitted quarries rather than new green field quarries, as the infrastructure for extraction, processing and transportation is in place.

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Yes, depending on remaining reserves, feasibility of extraction, impacts on the environment and human health which may constrain extensions to existing permitted quarries.

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County (i.e. Idle Valley, near Newark and near Nottingham) to minimise the distance minerals are transported to markets?

Rushcliffe Borough Council considers the geographical spread of sand and gravel quarries across the County is important. As this will meet demand both within and outside the County, including Greater Nottingham, South Yorkshire and elsewhere in the East Midlands.

Q9 Would it be more appropriate to prioritise specific areas above others?

It would be appropriate to prioritise specific areas, depending on the socio-economic and environmental benefits these areas provide relative to each other. Whilst the proximity to markets is an important factor, it should not be the overriding consideration. Impacts on local populations and the natural environment must be equally weighted and assessed through the Sustainability Appraisal.

Q10 Is it economical to transport mineral by river barge and if so should proposed quarries with the potential for moving sand and gravel by river barge be prioritised over other proposals?

Whilst Rushcliffe Borough Council has no position regarding the economics of transporting minerals by river barge, doing so clearly brings environmental benefits and reduces adverse impacts on the highway network and amenity of local residents.

If the potential for moving sand and gravel by river barge is identified as a positive factor when identifying quarries in the minerals plan, the ability to transport the mineral in this manner must be realised. Criteria based policies that support allocations and ensure they deliver sustainable development should therefore require this transportation method.

Q17 Should the plan seek to identify specific site allocations for gypsum provision or should a criteria based policy be developed to ensure an adequate supply of gypsum can be maintained over the plan period?

As permitted reserves exist at East Leake and Balderton (these should be sufficient to 2026 and 2027 respectively) and there is considerable uncertainty regarding future demand beyond this date (due to the closure of coal fired power stations which provide desulphogypsum and unknown future demand for specific grades of gypsum during the plan period), Rushcliffe Borough Council support the use of criteria based policy rather than the identification of specific site allocations.

Q18 are you aware of any issues regarding the provision of gypsum that should be considered as part of the Minerals Local Plan review?

Rushcliffe Borough Council notes that the Issues and Options consultation identifies the closure of coal fired power stations, including the Ratcliffe on Soar Power Station, by 2025 and the

subsequent reduction in supply of desulphogypsum. As recognised, this may have particular implications for the demand for Gypsum resources in Rushcliffe.

Q24 Are you aware of any issues relating to hydrocarbon extraction that should be considered through the Minerals Local Plan review?

Rushcliffe Borough Council supports the inclusion of criteria based policies which protect local communities and the natural environment from unacceptable direct and indirect environmental impacts of hydrocarbon extraction facilities during their construction and operation.

Q25 Do you agree with the proposed development management policy areas? Are there any others that should be covered?

Rushcliffe Borough Council welcomes and supports the development management policies proposed.

Sustainability Appraisal Scoping Report

Having read the SA Scoping Report, Rushcliffe Borough Council supports: the methodology proposed; the main sustainability issues identified; the documents that form the evidence base; and the SA objectives and decision making criteria. We have no detailed comments on the SA at this stage.

We look forward to reviewing the next iteration of the Minerals Local Plan and supporting SA in due course.

This concludes Rushcliffe Borough Council's representation.

If you would like to discuss our comments on the emerging plan, please feel free to contact me. Yours sincerely

John King MRTPI Planning Policy Officer
Rushcliffe Borough Council.

For instructions on how to use the system and make comments, please see our help guide.