Minerals Local Plan Issues and Options consultation

Search representations

Results for Burton Joyce Village Society search

New search New search

Comment

Minerals Local Plan Issues and Options consultation

Setting the overall context for the plan

Representation ID: 30311

Received: 11/01/2018

Respondent: Burton Joyce Village Society

Representation Summary:

We especially welcome and endorse the reference on p.3 to the important fact that "potential environmental impacts of extraction can limit where extraction is feasible" and that economic advantages must be measured "against the social and environmental disruption and harm that extraction can cause." We would add that while the economic benefits are necessarily of limited duration, as are some aspects of the damage to local communities, other sorts of damage would be permanent.

Comment

Minerals Local Plan Issues and Options consultation

Q1 Do you think any further information should be included in the overview of the area?

Representation ID: 30312

Received: 11/01/2018

Respondent: Burton Joyce Village Society

Representation Summary:

Might not the question of Biodiversity be enlarged? We note that "as the County is quite poor in biodiversity, sand and gravel reclamation schemes have had a very significant role in redressing the balance." The sentence appears to recognise that no further re-balancing is required. The Trent Valley is a recognised wildlife corridor not only for waterfowl, but other species that would be put at risk by any increase mineral working and or wetland.
Restoration schemes vary greatly. Attenborough and Colwick Park are a public amenity, achieved over time, at public expense. Basic "restoration to wetland" amounts to little more than holes full of water. If areas of wetland were once desirable, that need has already been met adequately.

Comment

Minerals Local Plan Issues and Options consultation

Q2 Do you agree with the draft vision? Are there other things we should include?

Representation ID: 30316

Received: 11/01/2018

Respondent: Burton Joyce Village Society

Representation Summary:

We agree with the draft vision, in particular the second and third points from the NPPF.

The loss of amenity that would result from the destruction of either bank of the Trent would be a catastrophe including: noise and dust pollution, congestion/increased traffic, air pollution. Mineral extraction would increase threat of flooding.

Transport of sand and gravel is an issue because of the low value of the material relative to its weight. Sites located closer to markets and built up areas could cause increased impacts on communities. As a result the Planning process should give those factors due weight.

Comment

Minerals Local Plan Issues and Options consultation

Q3 Are the above strategic issues appropriate? Are there others we should consider?

Representation ID: 30317

Received: 11/01/2018

Respondent: Burton Joyce Village Society

Representation Summary:

The relevant issues for Burton Joyce are paragraphs 3 and 4 concerning impact on communities and restoration of sites. While all the issues are appropriate where extraction is carried out, the only appropriate safeguards for this area would be to prevent extraction altogether.

Comment

Minerals Local Plan Issues and Options consultation

Q4 Do you think the average 10 year sales figure is the most suitable methodology for forecasting future demand in Nottinghamshire? If not please identify any alternatives

Representation ID: 30318

Received: 11/01/2018

Respondent: Burton Joyce Village Society

Representation Summary:

No. Graph shows Recycled and Secondary materials effectively steady, even when demand in primary aggregate fell over 50%. Recycled aggregates could therefore increase in the future.
Recycled material would grow as revived demand would be accompanied by increases in demolition waste.
Potential for growth particularly in Nottingham City and at HS2 Hub at Toton due to new development
A ten-year base for estimates covers of course approximately half the period that this Minerals Plan will cover. Modern architectural practices have reduced demand for primary aggregates. Future Govt regulations may reinforce trend. A Brexit-induced economic downturn may impact future demand.

Comment

Minerals Local Plan Issues and Options consultation

Q5 Do you think the same methodology (most recent average 10 year sales) should be used for each aggregate or is there merit in using different methodologies for different aggregates?

Representation ID: 30319

Received: 11/01/2018

Respondent: Burton Joyce Village Society

Representation Summary:

Different methodologies appear more appropriate. The arguments in answer to Q4 apply almost entirely to gravel, and to a lesser degree to sand, but very much less to other materials.

Comment

Minerals Local Plan Issues and Options consultation

Q6 Do you think extensions to existing permitted quarries should be prioritised over new greenfield quarries

Representation ID: 30320

Received: 11/01/2018

Respondent: Burton Joyce Village Society

Representation Summary:

In most cases yes, but the individual circumstances of each site will vary. The essential question is which choice will create the least risk of environmental destruction, flood risk, transport problems, destruction of natural habitat and damage to people's quiet enjoyment of their own homes. In most cases this is likely to be an extension of an existing site but there will be exceptions.

Comment

Minerals Local Plan Issues and Options consultation

Q7 Should different approaches (new sites/extensions to existing permitted quarries) be adopted for individual mineral types?

Representation ID: 30321

Received: 11/01/2018

Respondent: Burton Joyce Village Society

Representation Summary:

Probably yes, but always subject to the criteria set out in answer to Q6. Attention should be given also to the long-term post-extraction future of sites, which is very different for the different minerals. For example, disused quarries for limestone or building stone may become more useful than previously, and even used for housing. However, gravel and sand extraction, in river valleys, usually destroys good agricultural land, close to inhabited areas, which has important amenity value and/or potential for development; all this is permanently lost if the site becomes a big hole full of water.

Comment

Minerals Local Plan Issues and Options consultation

Q8 How important is it to maintain a geographical spread of sand and gravel quarries across the County to minimise transport distances

Representation ID: 30322

Received: 11/01/2018

Respondent: Burton Joyce Village Society

Representation Summary:

Not important. As stated in the answer to Q2, extraction sites close to built-up areas only have lower costs because the extracting and construction companies do not pay the extra costs imposed on the inhabitants and on public authorities by that extraction. Such costs are automatically greater in a more densely populated area, particularly near the city of Nottingham. For many such sites the imposition of a quarry may effectively destroy a community.

Comment

Minerals Local Plan Issues and Options consultation

Q9 Would it be more appropriate to prioritise specific areas above others?

Representation ID: 30323

Received: 11/01/2018

Respondent: Burton Joyce Village Society

Representation Summary:

Yes. Priority should be given to areas of low population, unencumbered traffic routes and places where the existing land use is of low value.

For instructions on how to use the system and make comments, please see our help guide.