Draft Nottinghamshire Minerals Local Plan
Search representations
Results for Egdon Resources Plc search
New searchComment
Draft Nottinghamshire Minerals Local Plan
Question 5: What do you think of the draft strategic policy for climate change?
Representation ID: 32329
Received: 25/09/2018
Respondent: Egdon Resources Plc
SP4 requires all minerals development to minimise their impact on the causes of climate change for the lifetime of the development.
The wording of the policy is inconsistent with the NPPF which requires plans to take a proactive approach to "mitigating and adapting to climate change" (paragraphs 20 (d) and 149, for example). The requirement for proposals to minimise the impact on climate change throughout the lifetime of the development is unduly onerous and exceeds the guidance in the NPPF and the Climate Change PPG. Instead, the policy should be amended to replace "minimise" with "mitigate and adapt".
Comment
Draft Nottinghamshire Minerals Local Plan
Question 6: What do you think of the draft strategic policy for sustainable transport?
Representation ID: 32330
Received: 25/09/2018
Respondent: Egdon Resources Plc
Policy fails to take account of hydrocarbon extraction and onshore oil. Wellsites are located in rural locations away from the main highway network therefore no alternative to transporting the drilling and other equipment. The first part of the policy should be qualified by including the words "where appropriate". The second part of the policy should be amended to delete "it can be demonstrated that" since hydrocarbon production by its very nature requires road transport which does not need to be demonstrated. The policy also needs to recognise that the source of hydrocarbon production may not be close to a proposed market.
Comment
Draft Nottinghamshire Minerals Local Plan
Question 9: What do you think of the draft strategic policy for minerals safeguarding, consultation areas and associated minerals infrastructure?
Representation ID: 32331
Received: 25/09/2018
Respondent: Egdon Resources Plc
Policy does not cover hydrocarbon development in safeguarding areas. The policy is ambiguous in that it refers to "non-mineral development" in parts 1, 3 and 4 but "development" in part 2. The depth of occurrence and nature of hydrocarbon reserves means that they can be explored and extracted without undue sterilisation of the eight mineral resources referred to at paragraph 3.82 of the draft Plan. Proposals for hydrocarbon development in safeguarding areas and consultation areas should be considered favourably by the MPA. The policy and the supporting text needs to be amended accordingly.
Comment
Draft Nottinghamshire Minerals Local Plan
Question 21: What do you think of the draft policy to meet demand for hydrocarbons over the plan period?
Representation ID: 32332
Received: 25/09/2018
Respondent: Egdon Resources Plc
In general terms, the policy is broadly acceptable. However, there are a number of concerns which require amendment to make the policy sound.
The policy needs to reflect the changes in the NPPF which came into effect on 24 July 2018.
The draft policy could be made sound by deleting references in parts 2 and 3 to "an overall scheme" which currently does not serve any clear purpose.
Comment
Draft Nottinghamshire Minerals Local Plan
Question 24: What do you think of the draft policy wording for DM3: Agricultural land and soil quality
Representation ID: 32333
Received: 25/09/2018
Respondent: Egdon Resources Plc
The policy justification presumes that minerals development often involves the use of large areas of agricultural land. However, hydrocarbon exploration or production wellsites often extend for no more than 1 ha. Accordingly, there should be some recognition in the text that hydrocarbon proposals are unlikely to have an adverse impact on best and most versatile agricultural land by virtue of their size.