Draft Nottinghamshire Minerals Local Plan

Question 1: What do you think of the draft vision and strategic objectives?

Representation ID: 32401

Received: 26/09/2018

Respondent: Brett Aggregates Limited

Representation Summary:

It would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand.
Generally BAL agrees that the draft vision is appropriate

Full text:

Brett Aggregates Ltd (BAL) is a wholly owned subsidiary of Robert and Sons Limited (Brett), the aggregates, building materials and civil engineering business, which was established over a century ago. It is the largest independent producer of sand and gravel in the UK. BAL manages all Brett's quarry, marine dredged and recycled aggregates together with coated roadstone operations.
1.2 Following withdrawal of the Submission Draft of the Minerals Local Plan (MLP) in 2017 Nottinghamshire County Council (the County) published an Issues an Options document in respect of a revised MLP together with a Call for Sites. The County is now consulting on a Draft MLP and seeking responses by the 28th September 2018.
1.3 BAL's interest in Nottinghamshire is in respect of aggregate bearing land adjacent to the River Trent at Shelford. This land represents a significant sand and gravel resource, the future development of which will ensure that Nottinghamshire, in particular the south of the County including the City of Nottingham, will be able to meet a steady and adequate supply of aggregates throughout the plan period whilst minimizing the amount of mineral miles travelled on the County's road network by Heavy Goods Vehicles (HGVs) delivering aggregate. It will also provide for the delivery of material using the River Trent and the existing wharf at Colwick to bring aggregate into the established industrial area of the City for use in the production of concrete. This approach accords with National Planning Policy Guidance (NPPF) in respect of providing a steady and adequate supply of mineral and sustainable development objectives.
The comments made in this submission relate only to the questions raised by the County in the Draft MLP document and do not alter BAL's submissions in respect of the withdrawn MLP. The format of this response is to address those questions which relate to BAL's area of interest. As the MLP preparation proceeds and further information becomes available other matters may arise on which BAL may wish to comment.
Question 1. What do you think to the draft vision and strategic objectives set out in the plan?
2.1 Nottinghamshire has a varied population distribution and it would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
2.2 It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand, see later comments.
2.3 Generally BAL agrees that the draft vision is appropriate. In particular the need to ensure that mineral development is concentrated in locations that offer the greatest level of accessibility to major markets and growth areas.
QUESTION 2. What do you think of the draft strategic policy?
3.1 Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.
QUESTION 3. What do you think to the draft strategic policy for minerals provision?
4.1 BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties. This is particularly the case in Nottinghamshire where there is strong demand in the south of the County and where the main sites of the previous MLP are worked out thus limiting the opportunity for extensions to just one small quarry (see below for further justification in respect of this issue).
4.2 BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.
Question 4. What do you think of the draft strategic policy for biodiversity led restoration?
5.1 BAL supports this policy.
Question 5. What do you think of the draft strategic policy for climate change?
6.1 BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.
Question 6. What do you think of the draft strategic policy for sustainable development?
7.1 BAL supports this policy.
Question 7. What do you think of the draft strategic policy for the built, historic and natural environment?
8.1 There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
Question 9. What do you think of the draft strategic policy for Mineral Safeguarding Consultation Areas and associated minerals infrastructure?
9.1 BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.
Question 10. What do you think of the draft policy approach towards aggregate provision?
10.1 We object to the draft approach being taken .National Policy in relation to planning for future aggregate demand is to be found in NPPF. For an MLP to be found sound1 it is necessary for it to be
* Positively prepared
* Justified
* Effective
* Consistent with national policy
10.2 The assessment of need on which the County bases its MLP is an essential component of this process as follows. For the plan to be positively prepared it must look forward on the basis that proposed development as set out in other plans and proposals will come forward and that need must be met through adequate allocation of resources in the MLP. This requirement must also be met for the MLP to be justified and effective.
10.3 The requirement for the MLP to be consistent with national policy in relation to assessing need and in particular the calculation of an adequate landbank requirement for an MLP can be found in the NPPF as follows2
* Preparing an annual Local Aggregates Assessment (LAA) based on a rolling average of 10 years sales data and other relevant local information.
Ensuring that large landbanks bound up in a very few sites do not stifle competition.
10.4 It is clear from the NPPF that the 10 year rolling average should be a starting point and that other local factors should be taken into account. National Planning Practice Guidance gives advice as to what local factors should be taken into account. The guidance is that relevant local information used should be that which seeks to look ahead rather than just relying on past sales. The guidance goes onto advise that such information may include levels of planned construction and house building in the local area but also " throughout the country" 3
10.5 The Planning Officers Society in conjunction with the Mineral Products Association have also produced useful practical guidance in assessing need and in particular what sort of local information should be used in considering the adequacy of the 10 year rolling average. These include4:-
* Geological resources being exhausted
* Trends and forecasts of population change including information in Local Plans on house building.
* Validated data on aggregate use in construction provided by the MPA.
* Planned major infrastructure projects including those within the County and 30 miles beyond as detailed in the National Infrastructure Plan 2016-2020. Also those projects included in Local Economic Partnerships Growth Deals and Strategic Economic Plans together with construction projects identified in District and Unitary Authority's infrastructure Development Plans. Planned highway improvement and maintenance works should also be considered.
* Local Regional and national economic forecasts from various sources.
* Information from the minerals industry on the availability of marine materials.
* Major new sources of recycled or secondary material becoming available.
* New environmental constraints being identified in aggregate producing areas or in proximity to them.
10.6 In looking at the appropriateness of the rolling 10 year average as the basis for calculating future demand it is essential that the veracity of the information is examined forensically. In particular are there any factors which have influenced the data such that it does not truly reflect the production of aggregate in the County to the extent that it cannot be relied upon to predict future need. In terms of the basis of a future MLP will it result in a plan which is not justified or effective in terms of whether the plan is sound.
10.7 Geological resources being exhausted and the issue of Finningly Quarry. Finningley Quarry is situated on the northern border of Nottinghamshire where is abuts Doncaster. It should be noted that the latest Nottinghamshire LAA (Oct 2017) advises that the annual production figures for the County have been affected by production at Finningley moving across the border into some of the years covered by the latest 10 years of production5. If this situation were to continue to operate in the future, that is production moving in and out of the County then its inclusion in the 10 year rolling average would be a sound basis for predicting future need. However, the Notts LAA advises6 that the reserves in both Doncaster and Rotherham (also referred to as South Yorkshire) are extremely limited and future supplies will be coming from Nottinghamshire, in particular the quarry at Sturton le Steeple which has permitted reserves.
10.8 This being the case it is necessary to look at the impact Finningley Quarry moving across the border has had on the last 10 years production in Nottinghamshire. This can be done by looking at the Doncaster and Rotherham LAA. Whilst individual quarry production is confidential the explanation below Table 1 makes it clear that production decreased in 2010 from 0.5MT to 0.16MT probably due to production at Finningley moving across the border into Nottinghamshire. Looking at Table 1 production from 2006 to 2015 was either 0.4/5MT or 0.14/5/6MT which indicates that at the higher levels production at Finningley was in Doncaster and at the lower levels it was in Nottinghamshire. Consequently from Table 1 we can deduce which years there would have been a shortfall in the Finningley contribution to the Nottinghamshire landbank and we can calculate the annual difference this will make by averaging the higher and lower figures and subtracting the lower from the higher. The difference is calculated as 0.3MT (0.45MT less 0.15MT).
10.9 The Nottinghamshire 10 year rolling average for sand and gravel is based on the years 2007 to 2016 whilst the Rotherham and Doncaster LAA is based on 2006 to 2015. However the Notts LAA does advise that in 2016 production in Finningley was across the border in Doncaster. This means it is possible to estimate the amount of the shortfall in the Nottinghamshire 2007 to 2016 production figures attributable to production at Finningley being in Doncaster. The calculation is based on the table below.
10.10 The 10 year rolling average if being used to predict future requirement in Nottinghamshire should now be calculated using 10 years annual production which includes the Finningley missing years as detailed above. That requires an addition 1.5MT to be added to the 17.04MT to give 18.54MT and results in a 10 year average annual sales of 1.85MT compared with the County's calculation of 1.70MT. The contribution of Finningley Quarry to the landbank is clearly a significant local factor which should be taken into account in using the 10 year rolling average as the basis for predicting future need.
10.11 Population Change and house building. The second local factor which needs to be taken into account in reviewing the 10 year rolling average is house building rates in the County and what is now planned. The County's latest LAA (October 2017, December 2016 data) sets out the planned house building rates for the individual planning authorities in the County. It is important to note that these are not maximum rates but are those which have been rigorously tested through the Local Plan processes including Strategic Housing Market Assessments and in some cases full Independent Examination procedures. It is also important to note that the Local Plans on which these house building rates are based were using pre 2014 Office of National Statistic (ONS) data. The 2014 when applied to the districts in Nottinghamshire will invariably lead to an increase in requirement. Consequently the impact of the planned house building rates should be considered as a minimum on which aggregate requirement should be based.
10.12 At Appendix 1 is a Table 2 which shows the house building rates for the local planning authority areas in Nottinghamshire over the 10 year period covering that being used by the County for the 10 year rolling average. The information contained within Table 2 has been taken from the Annual Monitoring Reports and other documents produced by the LPAs. The extracts from these documents can also be found at Appendix 1.
10.13 From Table 2 it can be seen that the average annual house building rate per LPA area over the past 10 years has been 351 units per annum. This figure is directly comparable with the average annual sand and gravel production rates calculated from the past 10 year's production. Table 2 uses the future house building rates deduced by the County in the October 2017 LAA7 to show that the average future rate will be 571 dwellings per annum. This is an increase of 220 dwellings per annum and represents a 63% increase. It is essential that this increase is taken as the minimum as it is based on solid evidence, it is not stated as a maximum so may be exceeded and is likely to be an underestimate based on the 2014 ONS data and the latest government advice that house building must increase. The population of Nottinghamshire including the County is expected to grow from 1.13 million in 2016 to 1.25 million in 2036. This growth will require at least the planned house building detailed on Table 2 which is based on the lower pre ONS 2014 estimates and it should be noted that as house building picks up following the recession the annual average rate per authority has already reached 468 dwellings per annum (2015/6) which is 81% of the planned annual requirement.
10.14 Validated data on aggregate use in construction is provided by the MPA. The October 2017 LAA references the use of aggregates in house building as being 20% of total production. Although it should be noted that at the recent examination into the Oxfordshire MLP 35% was used. It should be noted that house building requires significant support construction such as local roads, schools, village halls etc.
10.15 Planned major infrastructure projects. The October 2017 LAA notes that no further major infrastructure projects have been identified since the production of the previous LAA (January 2017). However, the January 2017 LAA was based on significantly higher rolling 10 year average taking into account partly pre recession construction levels and, therefore, capturing higher level of construction. With the move to the most recent 10 year rolling average this is no longer the case and the LAA needs to recognize that planned infrastructure for the future is significantly higher than accounted for by the 10 year rolling average which now almost solely covering a recession period when infrastructure projects were virtually non-existent. An adjustment to the 10 year average which determines the future landbank needs to be made in order for the MLP to be based on realistic future aggregate need.
10.16 Infrastructure identified in the National Infrastructure Delivery Plan 2016 to 2021 for the Nottinghamshire area is:-
* Midland Main Line. Further electrification to Nottingham.
* East Coast Mainline. Station, signaling and track works to facilitate longer new Super Express Trains.
* HS2.
It should be noted that the time period for this infrastructure plan is just 5 years and represents only 16% of the MLP plan period. Also included in the plan is reference to the Midlands Engine and the proposal for carrying out feasibility studies in respect of upgrades to the M1 and Smart motorway improvements together with improvements to the A46 Newark bypass and its intersection with the A1.
10.17 The Local Enterprise Partnership D2N2 (covering Nottingham and Derby and parts of both counties) has produced a programme which includes a target to create 50,000 jobs and to build 77,000 dwellings. The dwellings are included in Local Plans but D2N2 are intending to ensure that infrastructure delivery does not frustrate the building of the dwellings.
10.18 East Midlands airport which lies alongside the HS2 route is planning to increase from 4.3 to 10 million passengers and 300,000 to 700,000t of freight by 2040. The majority of this development will occur in the MLP plan period. A major freight terminal is also planned for the M1 j23a/24. Whilst this is in Leicestershire it lies within the 30 mile zone beyond the County boundary which the POS/MPA advice considers should be included in any future assessment for aggregate provision within a County.
10.19 Local regional and national economic forecast. The latest MPA forecasts (February 2019) suggest that aggregate demand will have increased by 19% by 2019 compared to 2015. Infrastructure growth is expected to be 56% from 2015 to 2019. In the longer term replenishment rates for sand and gravel show that for every 100 tonnes of material used planning permissions for replacement accounts for only 56 tonnes indicating that in the future shortages of supply will be apparent.
10.20 Availability of marine materials. Nottinghamshire is a landlocked county and some distance from any marine sourced aggregate landing facility. Consequently the material is not used in the County.
10.21 Major new sources of recycled or secondary material. For Nottinghamshire inert waste processing (considered suitable for recycled aggregate production) has now recovered to pre recession rates. However, whilst power station ash is capable of being substituted for primary aggregates the 3 coal fired power stations within the County are all planned to be closed by 2025. It would, therefore, be unwise to rely on any further increase in recycled output and in fact a reduction in availability of this material should be planned.
10.22 New environmental constraints. No new environmental constraints which could restrict aggregate extraction in the County have been identified. Locally the ban on extraction in the Peak District National Park has been accounted for by Derbyshire planning to increase production in the rest of the County by an amount equivalent to that to be lost through lack of production in the National Park.
10.23 It is apparent from the above information that there are a number of factors pointing to the need to modify the rolling 10 year average if a robust prediction of future need is to be made. The evidence is that the figure will need to be increased on the basis that during the MLP period more aggregate will have to be exported to South Yorkshire, a greater number of dwellings will be built, more jobs created and more infrastructure built. Of these elements it has been possible to quantify numerically only the impact of the increase in future exports to South Yorkshire and house building rates. House building is considered to represent the use of only 20 to 35% of the total supply of aggregate. However, house building is a key component in providing dwellings for new employees who will occupy newly constructed factories and commercial premises. House building also drives infrastructure provision including roads, such as those around Newark, schools, hospitals etc. lt is, therefore, proposed that the house building rates of the past 10 years be compared with aggregate use of the same period and then used to predict future aggregate requirement.
10.24 Taking the 1.85MTPA (10 year rolling average modified to take account of the Finningley Quarry production changes within the County) is comparable with an 10 year rolling average house building rate of per local authority (including Nottingham City) of 351 dwellings per annum. The future house building rate is 572 dwellings per annum. This is an increase of 63% and will require a similar increase in aggregate production going forward. This requires that the 10 year rolling average be increased by 63% (1.63 x 1.85) to 3.02MT.
10.25 In order to fully understand why Nottinghamshire has failed to increase its annual production of aggregate to that approaching its pre recession rates it is useful to look at the 10 year production rates for the counties making up the East Midlands AWP area. Table 3 shows figures taken from the LAAs for these counties. The East Midlands in 2016 had reached 70% of its pre recession production rate. Three counties were at around pre recession levels with two counties actually producing more. Lincolnshire is now producing 64 % of its pre recession level but Nottinghamshire is only at 40%. It is clear that lack of production in Nottinghamshire is holding back the East Midlands in reaching pre recession production levels. This assessment supports the need to increase the proposed landbank above that which would result from using the rolling 10 year landbank as the basis for future need prediction and this should be 3.02MTPA to give a required landbank for the plan period ( 2017 to 2036) of 57.38MT.
Question 11. What do you think of the draft site specific sand and gravel allocations?
11.1 The Draft MLP states that the site specific allocations are based on a consideration of five options which were narrowed down to two criteria on which the decision to allocate was based. Firstly, the need to have a geographical spread of sites across the County and secondly to prioritise locations with potential for transporting sand and gravel by river barge. BAL considers that this approach is appropriate.
11.2 The draft MLP is supported by A Draft site selection methodology and assessment document, July 2018, (Draft Site Selection Document)) and Draft Minerals Local Plan Sustainability Appraisal Interim Report, July 2018 (Draft SA). The Draft SA contains a detailed numerically based site assessment methodology and a numerical assessment of all the sites put forward. This is surprising because the draft MLP specifically excludes as one of the five options considered allocating sites based on their particular merits. The SA numerical assessment is then taken forward in the Draft Site Selection Document (Section 6) where the geographical spread of sites is stated as the main basis in determining which sites to allocate although this is not based on an objectively assessed need for each area. The ability of material to be transported by river barge is not given priority in the final site selection process.
11.3 BAL consider that it is necessary to maintain a geographical spread of quarries and permitted reserves across the County for two reasons. Firstly is the cost of transporting bulky materials relative to value that in respect of aggregates is low. This means that an appropriate geographic spread is important to ensure that the economy works effectively and additional costs are not unnecessarily incurred. It is also the case that for this reason proposed aggregate reserves should be matched geographically to where those reserves will be used. Secondly is the issue of environmental impact caused by HGV movements associated with aggregate transport.
11.4 Below Table 5 shows the current distribution of permitted reserves compared with spatial requirement for future house building. This is based on the information contained within the October 2017 LAA in respect of permitted reserves and Table 4 at Appendix 3 of this document.
The current distribution is not sustainable in terms of transportation of aggregate and the consequences for air quality and climate change. If extensions to quarries were to be preferred compared to opening up new sites this unsustainable distribution will continue. This is not in accordance with the NPPF guidance in respect of sustainable development.
11.5 In respect of the geographical distribution of aggregate production in the County Table 6 below shows the comparison between future house building in the three aggregate production areas identified by the County and the proposed geographical spread of aggregate production (permitted and proposed) in the draft MLP. There is a significant discrepancy between the two factors with 16% of the house building taking place in the Newark area whilst 46% of the aggregate reserves are planned to be here. In respect of Idle Valley (north Nottinghamshire) 18% of the house building for the County is planned to be here but 36% of the aggregate reserves are proposed in the draft MLP. Meanwhile in the south of the County where 56% of the house building is planned only 18% of the aggregate reserves are proposed in the MLP.
11.6 Taking into account the information in Table 6 it is surprising that the Shelford site (located in the South) was dismissed as a proposed allocation in the draft MLP solely on the basis that to allocate such a large site (6.5MT) in the south would skew the geographical distribution whilst factually Shelford should be allocated to maintain the correct geographical spread of allocated and permitted reserves in the County.
11.7 Even if the limited landbank proposed by the County is accepted (BAL object to the limited landbank, see above) in order to meet the objective set out under policy MP2 of having a geographical spread and meeting the requirement for the plan to be "justified" more aggregate should be allocated in the south and less in the north. This can be achieved within the limited landbank put forward by deleting Botany Bay and Mill Hill (or alternatively one of the proposed Newark sites) as new allocations and substituting Shelford. This has the added benefit of meeting the second MP2 site selection criteria which is "potential for transporting sand and gravel by river barge" and with which Shelford is the only site complying. Furthermore, the allocation of Shelford would lead to a better commercial balance of supply than is currently, and proposed to be, the case by introducing a new operator into the County. This will ensure that the plan is sound with respect to NPPF para 207 (g).
11.8 The correct geographical distribution of aggregate resources proposed in the draft MLP is important because of the impact of moving mineral within the County and bringing mineral in from surrounding counties if the distribution does not match planned development. The above analysis has used house building as a marker because the level of house building reflects where jobs are to be created and consequently commercial development, local infrastructure and major infrastructure. Much of the infrastructure identified above in relation to the landbank assessment will take place in the south of the County and includes East-Midlands airport expansion, HS2, works to the Nottingham railway line etc. The consequences of not sourcing mineral close to where it is needed are that more miles are travelled by HGVs transporting the mineral. This has a negative impact on air quality and in the long run climate change.
11.9 The air quality and climate consequences have been assessed with respect to HGV movements associated with the proposed Shelford Quarry and those at Newark in the attached (Appendix 4) RPS document. This gives an indication of the problems associated with having a poor geographical distribution of mineral resources in the County.
11.10 In respect of Shelford and the site assessment which has been undertaken BAL have been surprised that a site which was assessed as scoring well under the previous, now withdrawn MLP, has now scored somewhat poorly. Whilst this has not led to officers proposing not to allocate the site which as set out above was solely on the basis of geographical spread of sites the documents underpinning the scoring have been analyzed and series of reports prepared.
Previously the County scored the Shelford site as -6 during the operational phase and 0 in the post operational phase. In the current SA the site is scored -10 in the operational phase and -1 in the post operational phase. Although it should be noted that the summation of the actual SA scores results in a total +2 for the long term.
11.11 BAL has commissioned reports on the various areas of the assessment where it is considered that discrepancies have arisen. It should be noted that since the previous site assessment BAL have undertaken significant work with respect to the site with a view to submitting a planning application. This work was halted when the previous MLP in which Shelford was allocated was withdrawn. However, that work is recent and remains relevant. Some of it has been taken into account in the assessment, in particular that in respect of the historic environment. However, other work, in particular with regard to ecology and hydrology has not been taken into account. Reports in respect of Landscape, hydrology, ecology and transport are attached as appendices.
11.12 The completion of the surveys and other work at Shelford mean that the deliverability of the site can be assured. In the site assessment process the County have determined that Shelford is deliverable. This is an important factor in determining the soundness of the plan.
11.13 Below is a table showing a comparison of the scoring for the Shelford site in the current SA and that as assessed by BAL. Below the table is an explanation in respect of each topic.
Biodiversity. The operational phase score has been downgraded to reflect that the site will be worked wet so there will be no disturbance to the hydrology of the nearby locally designated wildlife sites.
Landscape. This aspect of the assessment has shown the most significant change in scoring for the site changing from -2 to -3 during the operational phase but most surprising changing from -1 to -3 in the long term. The BAL landscape assessment analysis has found that the approach adopted by the County does not allow for an area to be not typical of its character area nor the possibility that positive impacts are possible where a landscape is sensitive to change. In particular the County's landscape analysis fails to understand that the course of the Trent has changed at Shelford, the river now runs through a highly engineered channel and the flood defences along the river have allowed intensive agriculture with large scale arable fields predominating. The mineral extraction provides a significant opportunity to reintroduce the water meadows adjacent to the village and overall a water environment which reflects the historic landscape context. This is a positive aspect of the restoration which is not reflected in the -3 for the long term score.
Flooding. Whilst designing the final restoration scheme for the site initial flood modeling was carried out to see whether flood defences adjacent to the river (these are secondary to those adjacent to Shelford village) could be removed to allow the reconnection of the floodplain. Unfortunately only partial realignment of the flood defence is possible because the flood modeling has shown that under various scenarios the Shelford land and its defences acts to reduce the impact of flooding further downstream. This work has shown that the site can be worked without increasing risk of flooding and in fact during the operational stage there will be an opportunity to improve the defences adjacent to the village. The operational score has been increased to reflect the work carried out and the potential to reduce the risk of flooding during the operations phase.
Climate change. Shelford is the only site where river barging is proposed. This will produce a positive impact from one third of the material being transported in a way that has less impact on climate. The operational score has been amended accordingly.
Efficient use of land. Previously the site assessment viewed larger sites as being more efficient as lots of smaller sites require numerous processing and other plant. This is still the case and the score has been amended accordingly.
Energy efficiency. One third of the material at Shelford will be transported by barge which is a significantly more energy efficient than road transport. The score has been amended accordingly.
Air quality. One third of the material at Shelford will be transported by barge which will result in less pollution than if that volume of material came from a site where only road transport were to be able. The score has been amended accordingly.
Water Quality. It is proposed that there will be no dewatering when the site is worked and there will be no imported material brought into the site consequently the risk to water quality is low and the score has been amended to reflect this.
Human health and quality of life. During the operational phase of the site it will be possible to open up permissive paths and the potential to improve the Shelford village flood defences together with the creation of the water meadows. The operational score has, therefore, been amended.
12 Question 24. What do you think of the draft policy wording for DM3: Agricultural land and soil quality?
12.1 As stated above there is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
13.What do you think of the draft policy wording for DM5: Landscape character?
12.1 BAL objects to the wording of this policy the first part of which would prevent any mineral development coming forward. It need to include the words "....will not cause unacceptable harm to the character...." Rather than " ...........will not adversely impact on the character .........."

Attachments:

Comment

Draft Nottinghamshire Minerals Local Plan

Question 2: What do you think of the draft strategic policy for sustainable development?

Representation ID: 32402

Received: 26/09/2018

Respondent: Brett Aggregates Limited

Representation Summary:

Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.

Full text:

Brett Aggregates Ltd (BAL) is a wholly owned subsidiary of Robert and Sons Limited (Brett), the aggregates, building materials and civil engineering business, which was established over a century ago. It is the largest independent producer of sand and gravel in the UK. BAL manages all Brett's quarry, marine dredged and recycled aggregates together with coated roadstone operations.
1.2 Following withdrawal of the Submission Draft of the Minerals Local Plan (MLP) in 2017 Nottinghamshire County Council (the County) published an Issues an Options document in respect of a revised MLP together with a Call for Sites. The County is now consulting on a Draft MLP and seeking responses by the 28th September 2018.
1.3 BAL's interest in Nottinghamshire is in respect of aggregate bearing land adjacent to the River Trent at Shelford. This land represents a significant sand and gravel resource, the future development of which will ensure that Nottinghamshire, in particular the south of the County including the City of Nottingham, will be able to meet a steady and adequate supply of aggregates throughout the plan period whilst minimizing the amount of mineral miles travelled on the County's road network by Heavy Goods Vehicles (HGVs) delivering aggregate. It will also provide for the delivery of material using the River Trent and the existing wharf at Colwick to bring aggregate into the established industrial area of the City for use in the production of concrete. This approach accords with National Planning Policy Guidance (NPPF) in respect of providing a steady and adequate supply of mineral and sustainable development objectives.
The comments made in this submission relate only to the questions raised by the County in the Draft MLP document and do not alter BAL's submissions in respect of the withdrawn MLP. The format of this response is to address those questions which relate to BAL's area of interest. As the MLP preparation proceeds and further information becomes available other matters may arise on which BAL may wish to comment.
Question 1. What do you think to the draft vision and strategic objectives set out in the plan?
2.1 Nottinghamshire has a varied population distribution and it would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
2.2 It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand, see later comments.
2.3 Generally BAL agrees that the draft vision is appropriate. In particular the need to ensure that mineral development is concentrated in locations that offer the greatest level of accessibility to major markets and growth areas.
QUESTION 2. What do you think of the draft strategic policy?
3.1 Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.
QUESTION 3. What do you think to the draft strategic policy for minerals provision?
4.1 BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties. This is particularly the case in Nottinghamshire where there is strong demand in the south of the County and where the main sites of the previous MLP are worked out thus limiting the opportunity for extensions to just one small quarry (see below for further justification in respect of this issue).
4.2 BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.
Question 4. What do you think of the draft strategic policy for biodiversity led restoration?
5.1 BAL supports this policy.
Question 5. What do you think of the draft strategic policy for climate change?
6.1 BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.
Question 6. What do you think of the draft strategic policy for sustainable development?
7.1 BAL supports this policy.
Question 7. What do you think of the draft strategic policy for the built, historic and natural environment?
8.1 There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
Question 9. What do you think of the draft strategic policy for Mineral Safeguarding Consultation Areas and associated minerals infrastructure?
9.1 BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.
Question 10. What do you think of the draft policy approach towards aggregate provision?
10.1 We object to the draft approach being taken .National Policy in relation to planning for future aggregate demand is to be found in NPPF. For an MLP to be found sound1 it is necessary for it to be
* Positively prepared
* Justified
* Effective
* Consistent with national policy
10.2 The assessment of need on which the County bases its MLP is an essential component of this process as follows. For the plan to be positively prepared it must look forward on the basis that proposed development as set out in other plans and proposals will come forward and that need must be met through adequate allocation of resources in the MLP. This requirement must also be met for the MLP to be justified and effective.
10.3 The requirement for the MLP to be consistent with national policy in relation to assessing need and in particular the calculation of an adequate landbank requirement for an MLP can be found in the NPPF as follows2
* Preparing an annual Local Aggregates Assessment (LAA) based on a rolling average of 10 years sales data and other relevant local information.
Ensuring that large landbanks bound up in a very few sites do not stifle competition.
10.4 It is clear from the NPPF that the 10 year rolling average should be a starting point and that other local factors should be taken into account. National Planning Practice Guidance gives advice as to what local factors should be taken into account. The guidance is that relevant local information used should be that which seeks to look ahead rather than just relying on past sales. The guidance goes onto advise that such information may include levels of planned construction and house building in the local area but also " throughout the country" 3
10.5 The Planning Officers Society in conjunction with the Mineral Products Association have also produced useful practical guidance in assessing need and in particular what sort of local information should be used in considering the adequacy of the 10 year rolling average. These include4:-
* Geological resources being exhausted
* Trends and forecasts of population change including information in Local Plans on house building.
* Validated data on aggregate use in construction provided by the MPA.
* Planned major infrastructure projects including those within the County and 30 miles beyond as detailed in the National Infrastructure Plan 2016-2020. Also those projects included in Local Economic Partnerships Growth Deals and Strategic Economic Plans together with construction projects identified in District and Unitary Authority's infrastructure Development Plans. Planned highway improvement and maintenance works should also be considered.
* Local Regional and national economic forecasts from various sources.
* Information from the minerals industry on the availability of marine materials.
* Major new sources of recycled or secondary material becoming available.
* New environmental constraints being identified in aggregate producing areas or in proximity to them.
10.6 In looking at the appropriateness of the rolling 10 year average as the basis for calculating future demand it is essential that the veracity of the information is examined forensically. In particular are there any factors which have influenced the data such that it does not truly reflect the production of aggregate in the County to the extent that it cannot be relied upon to predict future need. In terms of the basis of a future MLP will it result in a plan which is not justified or effective in terms of whether the plan is sound.
10.7 Geological resources being exhausted and the issue of Finningly Quarry. Finningley Quarry is situated on the northern border of Nottinghamshire where is abuts Doncaster. It should be noted that the latest Nottinghamshire LAA (Oct 2017) advises that the annual production figures for the County have been affected by production at Finningley moving across the border into some of the years covered by the latest 10 years of production5. If this situation were to continue to operate in the future, that is production moving in and out of the County then its inclusion in the 10 year rolling average would be a sound basis for predicting future need. However, the Notts LAA advises6 that the reserves in both Doncaster and Rotherham (also referred to as South Yorkshire) are extremely limited and future supplies will be coming from Nottinghamshire, in particular the quarry at Sturton le Steeple which has permitted reserves.
10.8 This being the case it is necessary to look at the impact Finningley Quarry moving across the border has had on the last 10 years production in Nottinghamshire. This can be done by looking at the Doncaster and Rotherham LAA. Whilst individual quarry production is confidential the explanation below Table 1 makes it clear that production decreased in 2010 from 0.5MT to 0.16MT probably due to production at Finningley moving across the border into Nottinghamshire. Looking at Table 1 production from 2006 to 2015 was either 0.4/5MT or 0.14/5/6MT which indicates that at the higher levels production at Finningley was in Doncaster and at the lower levels it was in Nottinghamshire. Consequently from Table 1 we can deduce which years there would have been a shortfall in the Finningley contribution to the Nottinghamshire landbank and we can calculate the annual difference this will make by averaging the higher and lower figures and subtracting the lower from the higher. The difference is calculated as 0.3MT (0.45MT less 0.15MT).
10.9 The Nottinghamshire 10 year rolling average for sand and gravel is based on the years 2007 to 2016 whilst the Rotherham and Doncaster LAA is based on 2006 to 2015. However the Notts LAA does advise that in 2016 production in Finningley was across the border in Doncaster. This means it is possible to estimate the amount of the shortfall in the Nottinghamshire 2007 to 2016 production figures attributable to production at Finningley being in Doncaster. The calculation is based on the table below.
10.10 The 10 year rolling average if being used to predict future requirement in Nottinghamshire should now be calculated using 10 years annual production which includes the Finningley missing years as detailed above. That requires an addition 1.5MT to be added to the 17.04MT to give 18.54MT and results in a 10 year average annual sales of 1.85MT compared with the County's calculation of 1.70MT. The contribution of Finningley Quarry to the landbank is clearly a significant local factor which should be taken into account in using the 10 year rolling average as the basis for predicting future need.
10.11 Population Change and house building. The second local factor which needs to be taken into account in reviewing the 10 year rolling average is house building rates in the County and what is now planned. The County's latest LAA (October 2017, December 2016 data) sets out the planned house building rates for the individual planning authorities in the County. It is important to note that these are not maximum rates but are those which have been rigorously tested through the Local Plan processes including Strategic Housing Market Assessments and in some cases full Independent Examination procedures. It is also important to note that the Local Plans on which these house building rates are based were using pre 2014 Office of National Statistic (ONS) data. The 2014 when applied to the districts in Nottinghamshire will invariably lead to an increase in requirement. Consequently the impact of the planned house building rates should be considered as a minimum on which aggregate requirement should be based.
10.12 At Appendix 1 is a Table 2 which shows the house building rates for the local planning authority areas in Nottinghamshire over the 10 year period covering that being used by the County for the 10 year rolling average. The information contained within Table 2 has been taken from the Annual Monitoring Reports and other documents produced by the LPAs. The extracts from these documents can also be found at Appendix 1.
10.13 From Table 2 it can be seen that the average annual house building rate per LPA area over the past 10 years has been 351 units per annum. This figure is directly comparable with the average annual sand and gravel production rates calculated from the past 10 year's production. Table 2 uses the future house building rates deduced by the County in the October 2017 LAA7 to show that the average future rate will be 571 dwellings per annum. This is an increase of 220 dwellings per annum and represents a 63% increase. It is essential that this increase is taken as the minimum as it is based on solid evidence, it is not stated as a maximum so may be exceeded and is likely to be an underestimate based on the 2014 ONS data and the latest government advice that house building must increase. The population of Nottinghamshire including the County is expected to grow from 1.13 million in 2016 to 1.25 million in 2036. This growth will require at least the planned house building detailed on Table 2 which is based on the lower pre ONS 2014 estimates and it should be noted that as house building picks up following the recession the annual average rate per authority has already reached 468 dwellings per annum (2015/6) which is 81% of the planned annual requirement.
10.14 Validated data on aggregate use in construction is provided by the MPA. The October 2017 LAA references the use of aggregates in house building as being 20% of total production. Although it should be noted that at the recent examination into the Oxfordshire MLP 35% was used. It should be noted that house building requires significant support construction such as local roads, schools, village halls etc.
10.15 Planned major infrastructure projects. The October 2017 LAA notes that no further major infrastructure projects have been identified since the production of the previous LAA (January 2017). However, the January 2017 LAA was based on significantly higher rolling 10 year average taking into account partly pre recession construction levels and, therefore, capturing higher level of construction. With the move to the most recent 10 year rolling average this is no longer the case and the LAA needs to recognize that planned infrastructure for the future is significantly higher than accounted for by the 10 year rolling average which now almost solely covering a recession period when infrastructure projects were virtually non-existent. An adjustment to the 10 year average which determines the future landbank needs to be made in order for the MLP to be based on realistic future aggregate need.
10.16 Infrastructure identified in the National Infrastructure Delivery Plan 2016 to 2021 for the Nottinghamshire area is:-
* Midland Main Line. Further electrification to Nottingham.
* East Coast Mainline. Station, signaling and track works to facilitate longer new Super Express Trains.
* HS2.
It should be noted that the time period for this infrastructure plan is just 5 years and represents only 16% of the MLP plan period. Also included in the plan is reference to the Midlands Engine and the proposal for carrying out feasibility studies in respect of upgrades to the M1 and Smart motorway improvements together with improvements to the A46 Newark bypass and its intersection with the A1.
10.17 The Local Enterprise Partnership D2N2 (covering Nottingham and Derby and parts of both counties) has produced a programme which includes a target to create 50,000 jobs and to build 77,000 dwellings. The dwellings are included in Local Plans but D2N2 are intending to ensure that infrastructure delivery does not frustrate the building of the dwellings.
10.18 East Midlands airport which lies alongside the HS2 route is planning to increase from 4.3 to 10 million passengers and 300,000 to 700,000t of freight by 2040. The majority of this development will occur in the MLP plan period. A major freight terminal is also planned for the M1 j23a/24. Whilst this is in Leicestershire it lies within the 30 mile zone beyond the County boundary which the POS/MPA advice considers should be included in any future assessment for aggregate provision within a County.
10.19 Local regional and national economic forecast. The latest MPA forecasts (February 2019) suggest that aggregate demand will have increased by 19% by 2019 compared to 2015. Infrastructure growth is expected to be 56% from 2015 to 2019. In the longer term replenishment rates for sand and gravel show that for every 100 tonnes of material used planning permissions for replacement accounts for only 56 tonnes indicating that in the future shortages of supply will be apparent.
10.20 Availability of marine materials. Nottinghamshire is a landlocked county and some distance from any marine sourced aggregate landing facility. Consequently the material is not used in the County.
10.21 Major new sources of recycled or secondary material. For Nottinghamshire inert waste processing (considered suitable for recycled aggregate production) has now recovered to pre recession rates. However, whilst power station ash is capable of being substituted for primary aggregates the 3 coal fired power stations within the County are all planned to be closed by 2025. It would, therefore, be unwise to rely on any further increase in recycled output and in fact a reduction in availability of this material should be planned.
10.22 New environmental constraints. No new environmental constraints which could restrict aggregate extraction in the County have been identified. Locally the ban on extraction in the Peak District National Park has been accounted for by Derbyshire planning to increase production in the rest of the County by an amount equivalent to that to be lost through lack of production in the National Park.
10.23 It is apparent from the above information that there are a number of factors pointing to the need to modify the rolling 10 year average if a robust prediction of future need is to be made. The evidence is that the figure will need to be increased on the basis that during the MLP period more aggregate will have to be exported to South Yorkshire, a greater number of dwellings will be built, more jobs created and more infrastructure built. Of these elements it has been possible to quantify numerically only the impact of the increase in future exports to South Yorkshire and house building rates. House building is considered to represent the use of only 20 to 35% of the total supply of aggregate. However, house building is a key component in providing dwellings for new employees who will occupy newly constructed factories and commercial premises. House building also drives infrastructure provision including roads, such as those around Newark, schools, hospitals etc. lt is, therefore, proposed that the house building rates of the past 10 years be compared with aggregate use of the same period and then used to predict future aggregate requirement.
10.24 Taking the 1.85MTPA (10 year rolling average modified to take account of the Finningley Quarry production changes within the County) is comparable with an 10 year rolling average house building rate of per local authority (including Nottingham City) of 351 dwellings per annum. The future house building rate is 572 dwellings per annum. This is an increase of 63% and will require a similar increase in aggregate production going forward. This requires that the 10 year rolling average be increased by 63% (1.63 x 1.85) to 3.02MT.
10.25 In order to fully understand why Nottinghamshire has failed to increase its annual production of aggregate to that approaching its pre recession rates it is useful to look at the 10 year production rates for the counties making up the East Midlands AWP area. Table 3 shows figures taken from the LAAs for these counties. The East Midlands in 2016 had reached 70% of its pre recession production rate. Three counties were at around pre recession levels with two counties actually producing more. Lincolnshire is now producing 64 % of its pre recession level but Nottinghamshire is only at 40%. It is clear that lack of production in Nottinghamshire is holding back the East Midlands in reaching pre recession production levels. This assessment supports the need to increase the proposed landbank above that which would result from using the rolling 10 year landbank as the basis for future need prediction and this should be 3.02MTPA to give a required landbank for the plan period ( 2017 to 2036) of 57.38MT.
Question 11. What do you think of the draft site specific sand and gravel allocations?
11.1 The Draft MLP states that the site specific allocations are based on a consideration of five options which were narrowed down to two criteria on which the decision to allocate was based. Firstly, the need to have a geographical spread of sites across the County and secondly to prioritise locations with potential for transporting sand and gravel by river barge. BAL considers that this approach is appropriate.
11.2 The draft MLP is supported by A Draft site selection methodology and assessment document, July 2018, (Draft Site Selection Document)) and Draft Minerals Local Plan Sustainability Appraisal Interim Report, July 2018 (Draft SA). The Draft SA contains a detailed numerically based site assessment methodology and a numerical assessment of all the sites put forward. This is surprising because the draft MLP specifically excludes as one of the five options considered allocating sites based on their particular merits. The SA numerical assessment is then taken forward in the Draft Site Selection Document (Section 6) where the geographical spread of sites is stated as the main basis in determining which sites to allocate although this is not based on an objectively assessed need for each area. The ability of material to be transported by river barge is not given priority in the final site selection process.
11.3 BAL consider that it is necessary to maintain a geographical spread of quarries and permitted reserves across the County for two reasons. Firstly is the cost of transporting bulky materials relative to value that in respect of aggregates is low. This means that an appropriate geographic spread is important to ensure that the economy works effectively and additional costs are not unnecessarily incurred. It is also the case that for this reason proposed aggregate reserves should be matched geographically to where those reserves will be used. Secondly is the issue of environmental impact caused by HGV movements associated with aggregate transport.
11.4 Below Table 5 shows the current distribution of permitted reserves compared with spatial requirement for future house building. This is based on the information contained within the October 2017 LAA in respect of permitted reserves and Table 4 at Appendix 3 of this document.
The current distribution is not sustainable in terms of transportation of aggregate and the consequences for air quality and climate change. If extensions to quarries were to be preferred compared to opening up new sites this unsustainable distribution will continue. This is not in accordance with the NPPF guidance in respect of sustainable development.
11.5 In respect of the geographical distribution of aggregate production in the County Table 6 below shows the comparison between future house building in the three aggregate production areas identified by the County and the proposed geographical spread of aggregate production (permitted and proposed) in the draft MLP. There is a significant discrepancy between the two factors with 16% of the house building taking place in the Newark area whilst 46% of the aggregate reserves are planned to be here. In respect of Idle Valley (north Nottinghamshire) 18% of the house building for the County is planned to be here but 36% of the aggregate reserves are proposed in the draft MLP. Meanwhile in the south of the County where 56% of the house building is planned only 18% of the aggregate reserves are proposed in the MLP.
11.6 Taking into account the information in Table 6 it is surprising that the Shelford site (located in the South) was dismissed as a proposed allocation in the draft MLP solely on the basis that to allocate such a large site (6.5MT) in the south would skew the geographical distribution whilst factually Shelford should be allocated to maintain the correct geographical spread of allocated and permitted reserves in the County.
11.7 Even if the limited landbank proposed by the County is accepted (BAL object to the limited landbank, see above) in order to meet the objective set out under policy MP2 of having a geographical spread and meeting the requirement for the plan to be "justified" more aggregate should be allocated in the south and less in the north. This can be achieved within the limited landbank put forward by deleting Botany Bay and Mill Hill (or alternatively one of the proposed Newark sites) as new allocations and substituting Shelford. This has the added benefit of meeting the second MP2 site selection criteria which is "potential for transporting sand and gravel by river barge" and with which Shelford is the only site complying. Furthermore, the allocation of Shelford would lead to a better commercial balance of supply than is currently, and proposed to be, the case by introducing a new operator into the County. This will ensure that the plan is sound with respect to NPPF para 207 (g).
11.8 The correct geographical distribution of aggregate resources proposed in the draft MLP is important because of the impact of moving mineral within the County and bringing mineral in from surrounding counties if the distribution does not match planned development. The above analysis has used house building as a marker because the level of house building reflects where jobs are to be created and consequently commercial development, local infrastructure and major infrastructure. Much of the infrastructure identified above in relation to the landbank assessment will take place in the south of the County and includes East-Midlands airport expansion, HS2, works to the Nottingham railway line etc. The consequences of not sourcing mineral close to where it is needed are that more miles are travelled by HGVs transporting the mineral. This has a negative impact on air quality and in the long run climate change.
11.9 The air quality and climate consequences have been assessed with respect to HGV movements associated with the proposed Shelford Quarry and those at Newark in the attached (Appendix 4) RPS document. This gives an indication of the problems associated with having a poor geographical distribution of mineral resources in the County.
11.10 In respect of Shelford and the site assessment which has been undertaken BAL have been surprised that a site which was assessed as scoring well under the previous, now withdrawn MLP, has now scored somewhat poorly. Whilst this has not led to officers proposing not to allocate the site which as set out above was solely on the basis of geographical spread of sites the documents underpinning the scoring have been analyzed and series of reports prepared.
Previously the County scored the Shelford site as -6 during the operational phase and 0 in the post operational phase. In the current SA the site is scored -10 in the operational phase and -1 in the post operational phase. Although it should be noted that the summation of the actual SA scores results in a total +2 for the long term.
11.11 BAL has commissioned reports on the various areas of the assessment where it is considered that discrepancies have arisen. It should be noted that since the previous site assessment BAL have undertaken significant work with respect to the site with a view to submitting a planning application. This work was halted when the previous MLP in which Shelford was allocated was withdrawn. However, that work is recent and remains relevant. Some of it has been taken into account in the assessment, in particular that in respect of the historic environment. However, other work, in particular with regard to ecology and hydrology has not been taken into account. Reports in respect of Landscape, hydrology, ecology and transport are attached as appendices.
11.12 The completion of the surveys and other work at Shelford mean that the deliverability of the site can be assured. In the site assessment process the County have determined that Shelford is deliverable. This is an important factor in determining the soundness of the plan.
11.13 Below is a table showing a comparison of the scoring for the Shelford site in the current SA and that as assessed by BAL. Below the table is an explanation in respect of each topic.
Biodiversity. The operational phase score has been downgraded to reflect that the site will be worked wet so there will be no disturbance to the hydrology of the nearby locally designated wildlife sites.
Landscape. This aspect of the assessment has shown the most significant change in scoring for the site changing from -2 to -3 during the operational phase but most surprising changing from -1 to -3 in the long term. The BAL landscape assessment analysis has found that the approach adopted by the County does not allow for an area to be not typical of its character area nor the possibility that positive impacts are possible where a landscape is sensitive to change. In particular the County's landscape analysis fails to understand that the course of the Trent has changed at Shelford, the river now runs through a highly engineered channel and the flood defences along the river have allowed intensive agriculture with large scale arable fields predominating. The mineral extraction provides a significant opportunity to reintroduce the water meadows adjacent to the village and overall a water environment which reflects the historic landscape context. This is a positive aspect of the restoration which is not reflected in the -3 for the long term score.
Flooding. Whilst designing the final restoration scheme for the site initial flood modeling was carried out to see whether flood defences adjacent to the river (these are secondary to those adjacent to Shelford village) could be removed to allow the reconnection of the floodplain. Unfortunately only partial realignment of the flood defence is possible because the flood modeling has shown that under various scenarios the Shelford land and its defences acts to reduce the impact of flooding further downstream. This work has shown that the site can be worked without increasing risk of flooding and in fact during the operational stage there will be an opportunity to improve the defences adjacent to the village. The operational score has been increased to reflect the work carried out and the potential to reduce the risk of flooding during the operations phase.
Climate change. Shelford is the only site where river barging is proposed. This will produce a positive impact from one third of the material being transported in a way that has less impact on climate. The operational score has been amended accordingly.
Efficient use of land. Previously the site assessment viewed larger sites as being more efficient as lots of smaller sites require numerous processing and other plant. This is still the case and the score has been amended accordingly.
Energy efficiency. One third of the material at Shelford will be transported by barge which is a significantly more energy efficient than road transport. The score has been amended accordingly.
Air quality. One third of the material at Shelford will be transported by barge which will result in less pollution than if that volume of material came from a site where only road transport were to be able. The score has been amended accordingly.
Water Quality. It is proposed that there will be no dewatering when the site is worked and there will be no imported material brought into the site consequently the risk to water quality is low and the score has been amended to reflect this.
Human health and quality of life. During the operational phase of the site it will be possible to open up permissive paths and the potential to improve the Shelford village flood defences together with the creation of the water meadows. The operational score has, therefore, been amended.
12 Question 24. What do you think of the draft policy wording for DM3: Agricultural land and soil quality?
12.1 As stated above there is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
13.What do you think of the draft policy wording for DM5: Landscape character?
12.1 BAL objects to the wording of this policy the first part of which would prevent any mineral development coming forward. It need to include the words "....will not cause unacceptable harm to the character...." Rather than " ...........will not adversely impact on the character .........."

Attachments:

Comment

Draft Nottinghamshire Minerals Local Plan

Question 3: What do you think of the draft strategic policy for minerals provision?

Representation ID: 32403

Received: 26/09/2018

Respondent: Brett Aggregates Limited

Representation Summary:

BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties.
BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.

Full text:

Brett Aggregates Ltd (BAL) is a wholly owned subsidiary of Robert and Sons Limited (Brett), the aggregates, building materials and civil engineering business, which was established over a century ago. It is the largest independent producer of sand and gravel in the UK. BAL manages all Brett's quarry, marine dredged and recycled aggregates together with coated roadstone operations.
1.2 Following withdrawal of the Submission Draft of the Minerals Local Plan (MLP) in 2017 Nottinghamshire County Council (the County) published an Issues an Options document in respect of a revised MLP together with a Call for Sites. The County is now consulting on a Draft MLP and seeking responses by the 28th September 2018.
1.3 BAL's interest in Nottinghamshire is in respect of aggregate bearing land adjacent to the River Trent at Shelford. This land represents a significant sand and gravel resource, the future development of which will ensure that Nottinghamshire, in particular the south of the County including the City of Nottingham, will be able to meet a steady and adequate supply of aggregates throughout the plan period whilst minimizing the amount of mineral miles travelled on the County's road network by Heavy Goods Vehicles (HGVs) delivering aggregate. It will also provide for the delivery of material using the River Trent and the existing wharf at Colwick to bring aggregate into the established industrial area of the City for use in the production of concrete. This approach accords with National Planning Policy Guidance (NPPF) in respect of providing a steady and adequate supply of mineral and sustainable development objectives.
The comments made in this submission relate only to the questions raised by the County in the Draft MLP document and do not alter BAL's submissions in respect of the withdrawn MLP. The format of this response is to address those questions which relate to BAL's area of interest. As the MLP preparation proceeds and further information becomes available other matters may arise on which BAL may wish to comment.
Question 1. What do you think to the draft vision and strategic objectives set out in the plan?
2.1 Nottinghamshire has a varied population distribution and it would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
2.2 It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand, see later comments.
2.3 Generally BAL agrees that the draft vision is appropriate. In particular the need to ensure that mineral development is concentrated in locations that offer the greatest level of accessibility to major markets and growth areas.
QUESTION 2. What do you think of the draft strategic policy?
3.1 Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.
QUESTION 3. What do you think to the draft strategic policy for minerals provision?
4.1 BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties. This is particularly the case in Nottinghamshire where there is strong demand in the south of the County and where the main sites of the previous MLP are worked out thus limiting the opportunity for extensions to just one small quarry (see below for further justification in respect of this issue).
4.2 BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.
Question 4. What do you think of the draft strategic policy for biodiversity led restoration?
5.1 BAL supports this policy.
Question 5. What do you think of the draft strategic policy for climate change?
6.1 BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.
Question 6. What do you think of the draft strategic policy for sustainable development?
7.1 BAL supports this policy.
Question 7. What do you think of the draft strategic policy for the built, historic and natural environment?
8.1 There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
Question 9. What do you think of the draft strategic policy for Mineral Safeguarding Consultation Areas and associated minerals infrastructure?
9.1 BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.
Question 10. What do you think of the draft policy approach towards aggregate provision?
10.1 We object to the draft approach being taken .National Policy in relation to planning for future aggregate demand is to be found in NPPF. For an MLP to be found sound1 it is necessary for it to be
* Positively prepared
* Justified
* Effective
* Consistent with national policy
10.2 The assessment of need on which the County bases its MLP is an essential component of this process as follows. For the plan to be positively prepared it must look forward on the basis that proposed development as set out in other plans and proposals will come forward and that need must be met through adequate allocation of resources in the MLP. This requirement must also be met for the MLP to be justified and effective.
10.3 The requirement for the MLP to be consistent with national policy in relation to assessing need and in particular the calculation of an adequate landbank requirement for an MLP can be found in the NPPF as follows2
* Preparing an annual Local Aggregates Assessment (LAA) based on a rolling average of 10 years sales data and other relevant local information.
Ensuring that large landbanks bound up in a very few sites do not stifle competition.
10.4 It is clear from the NPPF that the 10 year rolling average should be a starting point and that other local factors should be taken into account. National Planning Practice Guidance gives advice as to what local factors should be taken into account. The guidance is that relevant local information used should be that which seeks to look ahead rather than just relying on past sales. The guidance goes onto advise that such information may include levels of planned construction and house building in the local area but also " throughout the country" 3
10.5 The Planning Officers Society in conjunction with the Mineral Products Association have also produced useful practical guidance in assessing need and in particular what sort of local information should be used in considering the adequacy of the 10 year rolling average. These include4:-
* Geological resources being exhausted
* Trends and forecasts of population change including information in Local Plans on house building.
* Validated data on aggregate use in construction provided by the MPA.
* Planned major infrastructure projects including those within the County and 30 miles beyond as detailed in the National Infrastructure Plan 2016-2020. Also those projects included in Local Economic Partnerships Growth Deals and Strategic Economic Plans together with construction projects identified in District and Unitary Authority's infrastructure Development Plans. Planned highway improvement and maintenance works should also be considered.
* Local Regional and national economic forecasts from various sources.
* Information from the minerals industry on the availability of marine materials.
* Major new sources of recycled or secondary material becoming available.
* New environmental constraints being identified in aggregate producing areas or in proximity to them.
10.6 In looking at the appropriateness of the rolling 10 year average as the basis for calculating future demand it is essential that the veracity of the information is examined forensically. In particular are there any factors which have influenced the data such that it does not truly reflect the production of aggregate in the County to the extent that it cannot be relied upon to predict future need. In terms of the basis of a future MLP will it result in a plan which is not justified or effective in terms of whether the plan is sound.
10.7 Geological resources being exhausted and the issue of Finningly Quarry. Finningley Quarry is situated on the northern border of Nottinghamshire where is abuts Doncaster. It should be noted that the latest Nottinghamshire LAA (Oct 2017) advises that the annual production figures for the County have been affected by production at Finningley moving across the border into some of the years covered by the latest 10 years of production5. If this situation were to continue to operate in the future, that is production moving in and out of the County then its inclusion in the 10 year rolling average would be a sound basis for predicting future need. However, the Notts LAA advises6 that the reserves in both Doncaster and Rotherham (also referred to as South Yorkshire) are extremely limited and future supplies will be coming from Nottinghamshire, in particular the quarry at Sturton le Steeple which has permitted reserves.
10.8 This being the case it is necessary to look at the impact Finningley Quarry moving across the border has had on the last 10 years production in Nottinghamshire. This can be done by looking at the Doncaster and Rotherham LAA. Whilst individual quarry production is confidential the explanation below Table 1 makes it clear that production decreased in 2010 from 0.5MT to 0.16MT probably due to production at Finningley moving across the border into Nottinghamshire. Looking at Table 1 production from 2006 to 2015 was either 0.4/5MT or 0.14/5/6MT which indicates that at the higher levels production at Finningley was in Doncaster and at the lower levels it was in Nottinghamshire. Consequently from Table 1 we can deduce which years there would have been a shortfall in the Finningley contribution to the Nottinghamshire landbank and we can calculate the annual difference this will make by averaging the higher and lower figures and subtracting the lower from the higher. The difference is calculated as 0.3MT (0.45MT less 0.15MT).
10.9 The Nottinghamshire 10 year rolling average for sand and gravel is based on the years 2007 to 2016 whilst the Rotherham and Doncaster LAA is based on 2006 to 2015. However the Notts LAA does advise that in 2016 production in Finningley was across the border in Doncaster. This means it is possible to estimate the amount of the shortfall in the Nottinghamshire 2007 to 2016 production figures attributable to production at Finningley being in Doncaster. The calculation is based on the table below.
10.10 The 10 year rolling average if being used to predict future requirement in Nottinghamshire should now be calculated using 10 years annual production which includes the Finningley missing years as detailed above. That requires an addition 1.5MT to be added to the 17.04MT to give 18.54MT and results in a 10 year average annual sales of 1.85MT compared with the County's calculation of 1.70MT. The contribution of Finningley Quarry to the landbank is clearly a significant local factor which should be taken into account in using the 10 year rolling average as the basis for predicting future need.
10.11 Population Change and house building. The second local factor which needs to be taken into account in reviewing the 10 year rolling average is house building rates in the County and what is now planned. The County's latest LAA (October 2017, December 2016 data) sets out the planned house building rates for the individual planning authorities in the County. It is important to note that these are not maximum rates but are those which have been rigorously tested through the Local Plan processes including Strategic Housing Market Assessments and in some cases full Independent Examination procedures. It is also important to note that the Local Plans on which these house building rates are based were using pre 2014 Office of National Statistic (ONS) data. The 2014 when applied to the districts in Nottinghamshire will invariably lead to an increase in requirement. Consequently the impact of the planned house building rates should be considered as a minimum on which aggregate requirement should be based.
10.12 At Appendix 1 is a Table 2 which shows the house building rates for the local planning authority areas in Nottinghamshire over the 10 year period covering that being used by the County for the 10 year rolling average. The information contained within Table 2 has been taken from the Annual Monitoring Reports and other documents produced by the LPAs. The extracts from these documents can also be found at Appendix 1.
10.13 From Table 2 it can be seen that the average annual house building rate per LPA area over the past 10 years has been 351 units per annum. This figure is directly comparable with the average annual sand and gravel production rates calculated from the past 10 year's production. Table 2 uses the future house building rates deduced by the County in the October 2017 LAA7 to show that the average future rate will be 571 dwellings per annum. This is an increase of 220 dwellings per annum and represents a 63% increase. It is essential that this increase is taken as the minimum as it is based on solid evidence, it is not stated as a maximum so may be exceeded and is likely to be an underestimate based on the 2014 ONS data and the latest government advice that house building must increase. The population of Nottinghamshire including the County is expected to grow from 1.13 million in 2016 to 1.25 million in 2036. This growth will require at least the planned house building detailed on Table 2 which is based on the lower pre ONS 2014 estimates and it should be noted that as house building picks up following the recession the annual average rate per authority has already reached 468 dwellings per annum (2015/6) which is 81% of the planned annual requirement.
10.14 Validated data on aggregate use in construction is provided by the MPA. The October 2017 LAA references the use of aggregates in house building as being 20% of total production. Although it should be noted that at the recent examination into the Oxfordshire MLP 35% was used. It should be noted that house building requires significant support construction such as local roads, schools, village halls etc.
10.15 Planned major infrastructure projects. The October 2017 LAA notes that no further major infrastructure projects have been identified since the production of the previous LAA (January 2017). However, the January 2017 LAA was based on significantly higher rolling 10 year average taking into account partly pre recession construction levels and, therefore, capturing higher level of construction. With the move to the most recent 10 year rolling average this is no longer the case and the LAA needs to recognize that planned infrastructure for the future is significantly higher than accounted for by the 10 year rolling average which now almost solely covering a recession period when infrastructure projects were virtually non-existent. An adjustment to the 10 year average which determines the future landbank needs to be made in order for the MLP to be based on realistic future aggregate need.
10.16 Infrastructure identified in the National Infrastructure Delivery Plan 2016 to 2021 for the Nottinghamshire area is:-
* Midland Main Line. Further electrification to Nottingham.
* East Coast Mainline. Station, signaling and track works to facilitate longer new Super Express Trains.
* HS2.
It should be noted that the time period for this infrastructure plan is just 5 years and represents only 16% of the MLP plan period. Also included in the plan is reference to the Midlands Engine and the proposal for carrying out feasibility studies in respect of upgrades to the M1 and Smart motorway improvements together with improvements to the A46 Newark bypass and its intersection with the A1.
10.17 The Local Enterprise Partnership D2N2 (covering Nottingham and Derby and parts of both counties) has produced a programme which includes a target to create 50,000 jobs and to build 77,000 dwellings. The dwellings are included in Local Plans but D2N2 are intending to ensure that infrastructure delivery does not frustrate the building of the dwellings.
10.18 East Midlands airport which lies alongside the HS2 route is planning to increase from 4.3 to 10 million passengers and 300,000 to 700,000t of freight by 2040. The majority of this development will occur in the MLP plan period. A major freight terminal is also planned for the M1 j23a/24. Whilst this is in Leicestershire it lies within the 30 mile zone beyond the County boundary which the POS/MPA advice considers should be included in any future assessment for aggregate provision within a County.
10.19 Local regional and national economic forecast. The latest MPA forecasts (February 2019) suggest that aggregate demand will have increased by 19% by 2019 compared to 2015. Infrastructure growth is expected to be 56% from 2015 to 2019. In the longer term replenishment rates for sand and gravel show that for every 100 tonnes of material used planning permissions for replacement accounts for only 56 tonnes indicating that in the future shortages of supply will be apparent.
10.20 Availability of marine materials. Nottinghamshire is a landlocked county and some distance from any marine sourced aggregate landing facility. Consequently the material is not used in the County.
10.21 Major new sources of recycled or secondary material. For Nottinghamshire inert waste processing (considered suitable for recycled aggregate production) has now recovered to pre recession rates. However, whilst power station ash is capable of being substituted for primary aggregates the 3 coal fired power stations within the County are all planned to be closed by 2025. It would, therefore, be unwise to rely on any further increase in recycled output and in fact a reduction in availability of this material should be planned.
10.22 New environmental constraints. No new environmental constraints which could restrict aggregate extraction in the County have been identified. Locally the ban on extraction in the Peak District National Park has been accounted for by Derbyshire planning to increase production in the rest of the County by an amount equivalent to that to be lost through lack of production in the National Park.
10.23 It is apparent from the above information that there are a number of factors pointing to the need to modify the rolling 10 year average if a robust prediction of future need is to be made. The evidence is that the figure will need to be increased on the basis that during the MLP period more aggregate will have to be exported to South Yorkshire, a greater number of dwellings will be built, more jobs created and more infrastructure built. Of these elements it has been possible to quantify numerically only the impact of the increase in future exports to South Yorkshire and house building rates. House building is considered to represent the use of only 20 to 35% of the total supply of aggregate. However, house building is a key component in providing dwellings for new employees who will occupy newly constructed factories and commercial premises. House building also drives infrastructure provision including roads, such as those around Newark, schools, hospitals etc. lt is, therefore, proposed that the house building rates of the past 10 years be compared with aggregate use of the same period and then used to predict future aggregate requirement.
10.24 Taking the 1.85MTPA (10 year rolling average modified to take account of the Finningley Quarry production changes within the County) is comparable with an 10 year rolling average house building rate of per local authority (including Nottingham City) of 351 dwellings per annum. The future house building rate is 572 dwellings per annum. This is an increase of 63% and will require a similar increase in aggregate production going forward. This requires that the 10 year rolling average be increased by 63% (1.63 x 1.85) to 3.02MT.
10.25 In order to fully understand why Nottinghamshire has failed to increase its annual production of aggregate to that approaching its pre recession rates it is useful to look at the 10 year production rates for the counties making up the East Midlands AWP area. Table 3 shows figures taken from the LAAs for these counties. The East Midlands in 2016 had reached 70% of its pre recession production rate. Three counties were at around pre recession levels with two counties actually producing more. Lincolnshire is now producing 64 % of its pre recession level but Nottinghamshire is only at 40%. It is clear that lack of production in Nottinghamshire is holding back the East Midlands in reaching pre recession production levels. This assessment supports the need to increase the proposed landbank above that which would result from using the rolling 10 year landbank as the basis for future need prediction and this should be 3.02MTPA to give a required landbank for the plan period ( 2017 to 2036) of 57.38MT.
Question 11. What do you think of the draft site specific sand and gravel allocations?
11.1 The Draft MLP states that the site specific allocations are based on a consideration of five options which were narrowed down to two criteria on which the decision to allocate was based. Firstly, the need to have a geographical spread of sites across the County and secondly to prioritise locations with potential for transporting sand and gravel by river barge. BAL considers that this approach is appropriate.
11.2 The draft MLP is supported by A Draft site selection methodology and assessment document, July 2018, (Draft Site Selection Document)) and Draft Minerals Local Plan Sustainability Appraisal Interim Report, July 2018 (Draft SA). The Draft SA contains a detailed numerically based site assessment methodology and a numerical assessment of all the sites put forward. This is surprising because the draft MLP specifically excludes as one of the five options considered allocating sites based on their particular merits. The SA numerical assessment is then taken forward in the Draft Site Selection Document (Section 6) where the geographical spread of sites is stated as the main basis in determining which sites to allocate although this is not based on an objectively assessed need for each area. The ability of material to be transported by river barge is not given priority in the final site selection process.
11.3 BAL consider that it is necessary to maintain a geographical spread of quarries and permitted reserves across the County for two reasons. Firstly is the cost of transporting bulky materials relative to value that in respect of aggregates is low. This means that an appropriate geographic spread is important to ensure that the economy works effectively and additional costs are not unnecessarily incurred. It is also the case that for this reason proposed aggregate reserves should be matched geographically to where those reserves will be used. Secondly is the issue of environmental impact caused by HGV movements associated with aggregate transport.
11.4 Below Table 5 shows the current distribution of permitted reserves compared with spatial requirement for future house building. This is based on the information contained within the October 2017 LAA in respect of permitted reserves and Table 4 at Appendix 3 of this document.
The current distribution is not sustainable in terms of transportation of aggregate and the consequences for air quality and climate change. If extensions to quarries were to be preferred compared to opening up new sites this unsustainable distribution will continue. This is not in accordance with the NPPF guidance in respect of sustainable development.
11.5 In respect of the geographical distribution of aggregate production in the County Table 6 below shows the comparison between future house building in the three aggregate production areas identified by the County and the proposed geographical spread of aggregate production (permitted and proposed) in the draft MLP. There is a significant discrepancy between the two factors with 16% of the house building taking place in the Newark area whilst 46% of the aggregate reserves are planned to be here. In respect of Idle Valley (north Nottinghamshire) 18% of the house building for the County is planned to be here but 36% of the aggregate reserves are proposed in the draft MLP. Meanwhile in the south of the County where 56% of the house building is planned only 18% of the aggregate reserves are proposed in the MLP.
11.6 Taking into account the information in Table 6 it is surprising that the Shelford site (located in the South) was dismissed as a proposed allocation in the draft MLP solely on the basis that to allocate such a large site (6.5MT) in the south would skew the geographical distribution whilst factually Shelford should be allocated to maintain the correct geographical spread of allocated and permitted reserves in the County.
11.7 Even if the limited landbank proposed by the County is accepted (BAL object to the limited landbank, see above) in order to meet the objective set out under policy MP2 of having a geographical spread and meeting the requirement for the plan to be "justified" more aggregate should be allocated in the south and less in the north. This can be achieved within the limited landbank put forward by deleting Botany Bay and Mill Hill (or alternatively one of the proposed Newark sites) as new allocations and substituting Shelford. This has the added benefit of meeting the second MP2 site selection criteria which is "potential for transporting sand and gravel by river barge" and with which Shelford is the only site complying. Furthermore, the allocation of Shelford would lead to a better commercial balance of supply than is currently, and proposed to be, the case by introducing a new operator into the County. This will ensure that the plan is sound with respect to NPPF para 207 (g).
11.8 The correct geographical distribution of aggregate resources proposed in the draft MLP is important because of the impact of moving mineral within the County and bringing mineral in from surrounding counties if the distribution does not match planned development. The above analysis has used house building as a marker because the level of house building reflects where jobs are to be created and consequently commercial development, local infrastructure and major infrastructure. Much of the infrastructure identified above in relation to the landbank assessment will take place in the south of the County and includes East-Midlands airport expansion, HS2, works to the Nottingham railway line etc. The consequences of not sourcing mineral close to where it is needed are that more miles are travelled by HGVs transporting the mineral. This has a negative impact on air quality and in the long run climate change.
11.9 The air quality and climate consequences have been assessed with respect to HGV movements associated with the proposed Shelford Quarry and those at Newark in the attached (Appendix 4) RPS document. This gives an indication of the problems associated with having a poor geographical distribution of mineral resources in the County.
11.10 In respect of Shelford and the site assessment which has been undertaken BAL have been surprised that a site which was assessed as scoring well under the previous, now withdrawn MLP, has now scored somewhat poorly. Whilst this has not led to officers proposing not to allocate the site which as set out above was solely on the basis of geographical spread of sites the documents underpinning the scoring have been analyzed and series of reports prepared.
Previously the County scored the Shelford site as -6 during the operational phase and 0 in the post operational phase. In the current SA the site is scored -10 in the operational phase and -1 in the post operational phase. Although it should be noted that the summation of the actual SA scores results in a total +2 for the long term.
11.11 BAL has commissioned reports on the various areas of the assessment where it is considered that discrepancies have arisen. It should be noted that since the previous site assessment BAL have undertaken significant work with respect to the site with a view to submitting a planning application. This work was halted when the previous MLP in which Shelford was allocated was withdrawn. However, that work is recent and remains relevant. Some of it has been taken into account in the assessment, in particular that in respect of the historic environment. However, other work, in particular with regard to ecology and hydrology has not been taken into account. Reports in respect of Landscape, hydrology, ecology and transport are attached as appendices.
11.12 The completion of the surveys and other work at Shelford mean that the deliverability of the site can be assured. In the site assessment process the County have determined that Shelford is deliverable. This is an important factor in determining the soundness of the plan.
11.13 Below is a table showing a comparison of the scoring for the Shelford site in the current SA and that as assessed by BAL. Below the table is an explanation in respect of each topic.
Biodiversity. The operational phase score has been downgraded to reflect that the site will be worked wet so there will be no disturbance to the hydrology of the nearby locally designated wildlife sites.
Landscape. This aspect of the assessment has shown the most significant change in scoring for the site changing from -2 to -3 during the operational phase but most surprising changing from -1 to -3 in the long term. The BAL landscape assessment analysis has found that the approach adopted by the County does not allow for an area to be not typical of its character area nor the possibility that positive impacts are possible where a landscape is sensitive to change. In particular the County's landscape analysis fails to understand that the course of the Trent has changed at Shelford, the river now runs through a highly engineered channel and the flood defences along the river have allowed intensive agriculture with large scale arable fields predominating. The mineral extraction provides a significant opportunity to reintroduce the water meadows adjacent to the village and overall a water environment which reflects the historic landscape context. This is a positive aspect of the restoration which is not reflected in the -3 for the long term score.
Flooding. Whilst designing the final restoration scheme for the site initial flood modeling was carried out to see whether flood defences adjacent to the river (these are secondary to those adjacent to Shelford village) could be removed to allow the reconnection of the floodplain. Unfortunately only partial realignment of the flood defence is possible because the flood modeling has shown that under various scenarios the Shelford land and its defences acts to reduce the impact of flooding further downstream. This work has shown that the site can be worked without increasing risk of flooding and in fact during the operational stage there will be an opportunity to improve the defences adjacent to the village. The operational score has been increased to reflect the work carried out and the potential to reduce the risk of flooding during the operations phase.
Climate change. Shelford is the only site where river barging is proposed. This will produce a positive impact from one third of the material being transported in a way that has less impact on climate. The operational score has been amended accordingly.
Efficient use of land. Previously the site assessment viewed larger sites as being more efficient as lots of smaller sites require numerous processing and other plant. This is still the case and the score has been amended accordingly.
Energy efficiency. One third of the material at Shelford will be transported by barge which is a significantly more energy efficient than road transport. The score has been amended accordingly.
Air quality. One third of the material at Shelford will be transported by barge which will result in less pollution than if that volume of material came from a site where only road transport were to be able. The score has been amended accordingly.
Water Quality. It is proposed that there will be no dewatering when the site is worked and there will be no imported material brought into the site consequently the risk to water quality is low and the score has been amended to reflect this.
Human health and quality of life. During the operational phase of the site it will be possible to open up permissive paths and the potential to improve the Shelford village flood defences together with the creation of the water meadows. The operational score has, therefore, been amended.
12 Question 24. What do you think of the draft policy wording for DM3: Agricultural land and soil quality?
12.1 As stated above there is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
13.What do you think of the draft policy wording for DM5: Landscape character?
12.1 BAL objects to the wording of this policy the first part of which would prevent any mineral development coming forward. It need to include the words "....will not cause unacceptable harm to the character...." Rather than " ...........will not adversely impact on the character .........."

Attachments:

Comment

Draft Nottinghamshire Minerals Local Plan

Question 4: What do you think of the draft strategic policy for biodiversity led restoration?

Representation ID: 32404

Received: 26/09/2018

Respondent: Brett Aggregates Limited

Representation Summary:

BAL supports this policy.

Full text:

Brett Aggregates Ltd (BAL) is a wholly owned subsidiary of Robert and Sons Limited (Brett), the aggregates, building materials and civil engineering business, which was established over a century ago. It is the largest independent producer of sand and gravel in the UK. BAL manages all Brett's quarry, marine dredged and recycled aggregates together with coated roadstone operations.
1.2 Following withdrawal of the Submission Draft of the Minerals Local Plan (MLP) in 2017 Nottinghamshire County Council (the County) published an Issues an Options document in respect of a revised MLP together with a Call for Sites. The County is now consulting on a Draft MLP and seeking responses by the 28th September 2018.
1.3 BAL's interest in Nottinghamshire is in respect of aggregate bearing land adjacent to the River Trent at Shelford. This land represents a significant sand and gravel resource, the future development of which will ensure that Nottinghamshire, in particular the south of the County including the City of Nottingham, will be able to meet a steady and adequate supply of aggregates throughout the plan period whilst minimizing the amount of mineral miles travelled on the County's road network by Heavy Goods Vehicles (HGVs) delivering aggregate. It will also provide for the delivery of material using the River Trent and the existing wharf at Colwick to bring aggregate into the established industrial area of the City for use in the production of concrete. This approach accords with National Planning Policy Guidance (NPPF) in respect of providing a steady and adequate supply of mineral and sustainable development objectives.
The comments made in this submission relate only to the questions raised by the County in the Draft MLP document and do not alter BAL's submissions in respect of the withdrawn MLP. The format of this response is to address those questions which relate to BAL's area of interest. As the MLP preparation proceeds and further information becomes available other matters may arise on which BAL may wish to comment.
Question 1. What do you think to the draft vision and strategic objectives set out in the plan?
2.1 Nottinghamshire has a varied population distribution and it would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
2.2 It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand, see later comments.
2.3 Generally BAL agrees that the draft vision is appropriate. In particular the need to ensure that mineral development is concentrated in locations that offer the greatest level of accessibility to major markets and growth areas.
QUESTION 2. What do you think of the draft strategic policy?
3.1 Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.
QUESTION 3. What do you think to the draft strategic policy for minerals provision?
4.1 BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties. This is particularly the case in Nottinghamshire where there is strong demand in the south of the County and where the main sites of the previous MLP are worked out thus limiting the opportunity for extensions to just one small quarry (see below for further justification in respect of this issue).
4.2 BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.
Question 4. What do you think of the draft strategic policy for biodiversity led restoration?
5.1 BAL supports this policy.
Question 5. What do you think of the draft strategic policy for climate change?
6.1 BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.
Question 6. What do you think of the draft strategic policy for sustainable development?
7.1 BAL supports this policy.
Question 7. What do you think of the draft strategic policy for the built, historic and natural environment?
8.1 There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
Question 9. What do you think of the draft strategic policy for Mineral Safeguarding Consultation Areas and associated minerals infrastructure?
9.1 BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.
Question 10. What do you think of the draft policy approach towards aggregate provision?
10.1 We object to the draft approach being taken .National Policy in relation to planning for future aggregate demand is to be found in NPPF. For an MLP to be found sound1 it is necessary for it to be
* Positively prepared
* Justified
* Effective
* Consistent with national policy
10.2 The assessment of need on which the County bases its MLP is an essential component of this process as follows. For the plan to be positively prepared it must look forward on the basis that proposed development as set out in other plans and proposals will come forward and that need must be met through adequate allocation of resources in the MLP. This requirement must also be met for the MLP to be justified and effective.
10.3 The requirement for the MLP to be consistent with national policy in relation to assessing need and in particular the calculation of an adequate landbank requirement for an MLP can be found in the NPPF as follows2
* Preparing an annual Local Aggregates Assessment (LAA) based on a rolling average of 10 years sales data and other relevant local information.
Ensuring that large landbanks bound up in a very few sites do not stifle competition.
10.4 It is clear from the NPPF that the 10 year rolling average should be a starting point and that other local factors should be taken into account. National Planning Practice Guidance gives advice as to what local factors should be taken into account. The guidance is that relevant local information used should be that which seeks to look ahead rather than just relying on past sales. The guidance goes onto advise that such information may include levels of planned construction and house building in the local area but also " throughout the country" 3
10.5 The Planning Officers Society in conjunction with the Mineral Products Association have also produced useful practical guidance in assessing need and in particular what sort of local information should be used in considering the adequacy of the 10 year rolling average. These include4:-
* Geological resources being exhausted
* Trends and forecasts of population change including information in Local Plans on house building.
* Validated data on aggregate use in construction provided by the MPA.
* Planned major infrastructure projects including those within the County and 30 miles beyond as detailed in the National Infrastructure Plan 2016-2020. Also those projects included in Local Economic Partnerships Growth Deals and Strategic Economic Plans together with construction projects identified in District and Unitary Authority's infrastructure Development Plans. Planned highway improvement and maintenance works should also be considered.
* Local Regional and national economic forecasts from various sources.
* Information from the minerals industry on the availability of marine materials.
* Major new sources of recycled or secondary material becoming available.
* New environmental constraints being identified in aggregate producing areas or in proximity to them.
10.6 In looking at the appropriateness of the rolling 10 year average as the basis for calculating future demand it is essential that the veracity of the information is examined forensically. In particular are there any factors which have influenced the data such that it does not truly reflect the production of aggregate in the County to the extent that it cannot be relied upon to predict future need. In terms of the basis of a future MLP will it result in a plan which is not justified or effective in terms of whether the plan is sound.
10.7 Geological resources being exhausted and the issue of Finningly Quarry. Finningley Quarry is situated on the northern border of Nottinghamshire where is abuts Doncaster. It should be noted that the latest Nottinghamshire LAA (Oct 2017) advises that the annual production figures for the County have been affected by production at Finningley moving across the border into some of the years covered by the latest 10 years of production5. If this situation were to continue to operate in the future, that is production moving in and out of the County then its inclusion in the 10 year rolling average would be a sound basis for predicting future need. However, the Notts LAA advises6 that the reserves in both Doncaster and Rotherham (also referred to as South Yorkshire) are extremely limited and future supplies will be coming from Nottinghamshire, in particular the quarry at Sturton le Steeple which has permitted reserves.
10.8 This being the case it is necessary to look at the impact Finningley Quarry moving across the border has had on the last 10 years production in Nottinghamshire. This can be done by looking at the Doncaster and Rotherham LAA. Whilst individual quarry production is confidential the explanation below Table 1 makes it clear that production decreased in 2010 from 0.5MT to 0.16MT probably due to production at Finningley moving across the border into Nottinghamshire. Looking at Table 1 production from 2006 to 2015 was either 0.4/5MT or 0.14/5/6MT which indicates that at the higher levels production at Finningley was in Doncaster and at the lower levels it was in Nottinghamshire. Consequently from Table 1 we can deduce which years there would have been a shortfall in the Finningley contribution to the Nottinghamshire landbank and we can calculate the annual difference this will make by averaging the higher and lower figures and subtracting the lower from the higher. The difference is calculated as 0.3MT (0.45MT less 0.15MT).
10.9 The Nottinghamshire 10 year rolling average for sand and gravel is based on the years 2007 to 2016 whilst the Rotherham and Doncaster LAA is based on 2006 to 2015. However the Notts LAA does advise that in 2016 production in Finningley was across the border in Doncaster. This means it is possible to estimate the amount of the shortfall in the Nottinghamshire 2007 to 2016 production figures attributable to production at Finningley being in Doncaster. The calculation is based on the table below.
10.10 The 10 year rolling average if being used to predict future requirement in Nottinghamshire should now be calculated using 10 years annual production which includes the Finningley missing years as detailed above. That requires an addition 1.5MT to be added to the 17.04MT to give 18.54MT and results in a 10 year average annual sales of 1.85MT compared with the County's calculation of 1.70MT. The contribution of Finningley Quarry to the landbank is clearly a significant local factor which should be taken into account in using the 10 year rolling average as the basis for predicting future need.
10.11 Population Change and house building. The second local factor which needs to be taken into account in reviewing the 10 year rolling average is house building rates in the County and what is now planned. The County's latest LAA (October 2017, December 2016 data) sets out the planned house building rates for the individual planning authorities in the County. It is important to note that these are not maximum rates but are those which have been rigorously tested through the Local Plan processes including Strategic Housing Market Assessments and in some cases full Independent Examination procedures. It is also important to note that the Local Plans on which these house building rates are based were using pre 2014 Office of National Statistic (ONS) data. The 2014 when applied to the districts in Nottinghamshire will invariably lead to an increase in requirement. Consequently the impact of the planned house building rates should be considered as a minimum on which aggregate requirement should be based.
10.12 At Appendix 1 is a Table 2 which shows the house building rates for the local planning authority areas in Nottinghamshire over the 10 year period covering that being used by the County for the 10 year rolling average. The information contained within Table 2 has been taken from the Annual Monitoring Reports and other documents produced by the LPAs. The extracts from these documents can also be found at Appendix 1.
10.13 From Table 2 it can be seen that the average annual house building rate per LPA area over the past 10 years has been 351 units per annum. This figure is directly comparable with the average annual sand and gravel production rates calculated from the past 10 year's production. Table 2 uses the future house building rates deduced by the County in the October 2017 LAA7 to show that the average future rate will be 571 dwellings per annum. This is an increase of 220 dwellings per annum and represents a 63% increase. It is essential that this increase is taken as the minimum as it is based on solid evidence, it is not stated as a maximum so may be exceeded and is likely to be an underestimate based on the 2014 ONS data and the latest government advice that house building must increase. The population of Nottinghamshire including the County is expected to grow from 1.13 million in 2016 to 1.25 million in 2036. This growth will require at least the planned house building detailed on Table 2 which is based on the lower pre ONS 2014 estimates and it should be noted that as house building picks up following the recession the annual average rate per authority has already reached 468 dwellings per annum (2015/6) which is 81% of the planned annual requirement.
10.14 Validated data on aggregate use in construction is provided by the MPA. The October 2017 LAA references the use of aggregates in house building as being 20% of total production. Although it should be noted that at the recent examination into the Oxfordshire MLP 35% was used. It should be noted that house building requires significant support construction such as local roads, schools, village halls etc.
10.15 Planned major infrastructure projects. The October 2017 LAA notes that no further major infrastructure projects have been identified since the production of the previous LAA (January 2017). However, the January 2017 LAA was based on significantly higher rolling 10 year average taking into account partly pre recession construction levels and, therefore, capturing higher level of construction. With the move to the most recent 10 year rolling average this is no longer the case and the LAA needs to recognize that planned infrastructure for the future is significantly higher than accounted for by the 10 year rolling average which now almost solely covering a recession period when infrastructure projects were virtually non-existent. An adjustment to the 10 year average which determines the future landbank needs to be made in order for the MLP to be based on realistic future aggregate need.
10.16 Infrastructure identified in the National Infrastructure Delivery Plan 2016 to 2021 for the Nottinghamshire area is:-
* Midland Main Line. Further electrification to Nottingham.
* East Coast Mainline. Station, signaling and track works to facilitate longer new Super Express Trains.
* HS2.
It should be noted that the time period for this infrastructure plan is just 5 years and represents only 16% of the MLP plan period. Also included in the plan is reference to the Midlands Engine and the proposal for carrying out feasibility studies in respect of upgrades to the M1 and Smart motorway improvements together with improvements to the A46 Newark bypass and its intersection with the A1.
10.17 The Local Enterprise Partnership D2N2 (covering Nottingham and Derby and parts of both counties) has produced a programme which includes a target to create 50,000 jobs and to build 77,000 dwellings. The dwellings are included in Local Plans but D2N2 are intending to ensure that infrastructure delivery does not frustrate the building of the dwellings.
10.18 East Midlands airport which lies alongside the HS2 route is planning to increase from 4.3 to 10 million passengers and 300,000 to 700,000t of freight by 2040. The majority of this development will occur in the MLP plan period. A major freight terminal is also planned for the M1 j23a/24. Whilst this is in Leicestershire it lies within the 30 mile zone beyond the County boundary which the POS/MPA advice considers should be included in any future assessment for aggregate provision within a County.
10.19 Local regional and national economic forecast. The latest MPA forecasts (February 2019) suggest that aggregate demand will have increased by 19% by 2019 compared to 2015. Infrastructure growth is expected to be 56% from 2015 to 2019. In the longer term replenishment rates for sand and gravel show that for every 100 tonnes of material used planning permissions for replacement accounts for only 56 tonnes indicating that in the future shortages of supply will be apparent.
10.20 Availability of marine materials. Nottinghamshire is a landlocked county and some distance from any marine sourced aggregate landing facility. Consequently the material is not used in the County.
10.21 Major new sources of recycled or secondary material. For Nottinghamshire inert waste processing (considered suitable for recycled aggregate production) has now recovered to pre recession rates. However, whilst power station ash is capable of being substituted for primary aggregates the 3 coal fired power stations within the County are all planned to be closed by 2025. It would, therefore, be unwise to rely on any further increase in recycled output and in fact a reduction in availability of this material should be planned.
10.22 New environmental constraints. No new environmental constraints which could restrict aggregate extraction in the County have been identified. Locally the ban on extraction in the Peak District National Park has been accounted for by Derbyshire planning to increase production in the rest of the County by an amount equivalent to that to be lost through lack of production in the National Park.
10.23 It is apparent from the above information that there are a number of factors pointing to the need to modify the rolling 10 year average if a robust prediction of future need is to be made. The evidence is that the figure will need to be increased on the basis that during the MLP period more aggregate will have to be exported to South Yorkshire, a greater number of dwellings will be built, more jobs created and more infrastructure built. Of these elements it has been possible to quantify numerically only the impact of the increase in future exports to South Yorkshire and house building rates. House building is considered to represent the use of only 20 to 35% of the total supply of aggregate. However, house building is a key component in providing dwellings for new employees who will occupy newly constructed factories and commercial premises. House building also drives infrastructure provision including roads, such as those around Newark, schools, hospitals etc. lt is, therefore, proposed that the house building rates of the past 10 years be compared with aggregate use of the same period and then used to predict future aggregate requirement.
10.24 Taking the 1.85MTPA (10 year rolling average modified to take account of the Finningley Quarry production changes within the County) is comparable with an 10 year rolling average house building rate of per local authority (including Nottingham City) of 351 dwellings per annum. The future house building rate is 572 dwellings per annum. This is an increase of 63% and will require a similar increase in aggregate production going forward. This requires that the 10 year rolling average be increased by 63% (1.63 x 1.85) to 3.02MT.
10.25 In order to fully understand why Nottinghamshire has failed to increase its annual production of aggregate to that approaching its pre recession rates it is useful to look at the 10 year production rates for the counties making up the East Midlands AWP area. Table 3 shows figures taken from the LAAs for these counties. The East Midlands in 2016 had reached 70% of its pre recession production rate. Three counties were at around pre recession levels with two counties actually producing more. Lincolnshire is now producing 64 % of its pre recession level but Nottinghamshire is only at 40%. It is clear that lack of production in Nottinghamshire is holding back the East Midlands in reaching pre recession production levels. This assessment supports the need to increase the proposed landbank above that which would result from using the rolling 10 year landbank as the basis for future need prediction and this should be 3.02MTPA to give a required landbank for the plan period ( 2017 to 2036) of 57.38MT.
Question 11. What do you think of the draft site specific sand and gravel allocations?
11.1 The Draft MLP states that the site specific allocations are based on a consideration of five options which were narrowed down to two criteria on which the decision to allocate was based. Firstly, the need to have a geographical spread of sites across the County and secondly to prioritise locations with potential for transporting sand and gravel by river barge. BAL considers that this approach is appropriate.
11.2 The draft MLP is supported by A Draft site selection methodology and assessment document, July 2018, (Draft Site Selection Document)) and Draft Minerals Local Plan Sustainability Appraisal Interim Report, July 2018 (Draft SA). The Draft SA contains a detailed numerically based site assessment methodology and a numerical assessment of all the sites put forward. This is surprising because the draft MLP specifically excludes as one of the five options considered allocating sites based on their particular merits. The SA numerical assessment is then taken forward in the Draft Site Selection Document (Section 6) where the geographical spread of sites is stated as the main basis in determining which sites to allocate although this is not based on an objectively assessed need for each area. The ability of material to be transported by river barge is not given priority in the final site selection process.
11.3 BAL consider that it is necessary to maintain a geographical spread of quarries and permitted reserves across the County for two reasons. Firstly is the cost of transporting bulky materials relative to value that in respect of aggregates is low. This means that an appropriate geographic spread is important to ensure that the economy works effectively and additional costs are not unnecessarily incurred. It is also the case that for this reason proposed aggregate reserves should be matched geographically to where those reserves will be used. Secondly is the issue of environmental impact caused by HGV movements associated with aggregate transport.
11.4 Below Table 5 shows the current distribution of permitted reserves compared with spatial requirement for future house building. This is based on the information contained within the October 2017 LAA in respect of permitted reserves and Table 4 at Appendix 3 of this document.
The current distribution is not sustainable in terms of transportation of aggregate and the consequences for air quality and climate change. If extensions to quarries were to be preferred compared to opening up new sites this unsustainable distribution will continue. This is not in accordance with the NPPF guidance in respect of sustainable development.
11.5 In respect of the geographical distribution of aggregate production in the County Table 6 below shows the comparison between future house building in the three aggregate production areas identified by the County and the proposed geographical spread of aggregate production (permitted and proposed) in the draft MLP. There is a significant discrepancy between the two factors with 16% of the house building taking place in the Newark area whilst 46% of the aggregate reserves are planned to be here. In respect of Idle Valley (north Nottinghamshire) 18% of the house building for the County is planned to be here but 36% of the aggregate reserves are proposed in the draft MLP. Meanwhile in the south of the County where 56% of the house building is planned only 18% of the aggregate reserves are proposed in the MLP.
11.6 Taking into account the information in Table 6 it is surprising that the Shelford site (located in the South) was dismissed as a proposed allocation in the draft MLP solely on the basis that to allocate such a large site (6.5MT) in the south would skew the geographical distribution whilst factually Shelford should be allocated to maintain the correct geographical spread of allocated and permitted reserves in the County.
11.7 Even if the limited landbank proposed by the County is accepted (BAL object to the limited landbank, see above) in order to meet the objective set out under policy MP2 of having a geographical spread and meeting the requirement for the plan to be "justified" more aggregate should be allocated in the south and less in the north. This can be achieved within the limited landbank put forward by deleting Botany Bay and Mill Hill (or alternatively one of the proposed Newark sites) as new allocations and substituting Shelford. This has the added benefit of meeting the second MP2 site selection criteria which is "potential for transporting sand and gravel by river barge" and with which Shelford is the only site complying. Furthermore, the allocation of Shelford would lead to a better commercial balance of supply than is currently, and proposed to be, the case by introducing a new operator into the County. This will ensure that the plan is sound with respect to NPPF para 207 (g).
11.8 The correct geographical distribution of aggregate resources proposed in the draft MLP is important because of the impact of moving mineral within the County and bringing mineral in from surrounding counties if the distribution does not match planned development. The above analysis has used house building as a marker because the level of house building reflects where jobs are to be created and consequently commercial development, local infrastructure and major infrastructure. Much of the infrastructure identified above in relation to the landbank assessment will take place in the south of the County and includes East-Midlands airport expansion, HS2, works to the Nottingham railway line etc. The consequences of not sourcing mineral close to where it is needed are that more miles are travelled by HGVs transporting the mineral. This has a negative impact on air quality and in the long run climate change.
11.9 The air quality and climate consequences have been assessed with respect to HGV movements associated with the proposed Shelford Quarry and those at Newark in the attached (Appendix 4) RPS document. This gives an indication of the problems associated with having a poor geographical distribution of mineral resources in the County.
11.10 In respect of Shelford and the site assessment which has been undertaken BAL have been surprised that a site which was assessed as scoring well under the previous, now withdrawn MLP, has now scored somewhat poorly. Whilst this has not led to officers proposing not to allocate the site which as set out above was solely on the basis of geographical spread of sites the documents underpinning the scoring have been analyzed and series of reports prepared.
Previously the County scored the Shelford site as -6 during the operational phase and 0 in the post operational phase. In the current SA the site is scored -10 in the operational phase and -1 in the post operational phase. Although it should be noted that the summation of the actual SA scores results in a total +2 for the long term.
11.11 BAL has commissioned reports on the various areas of the assessment where it is considered that discrepancies have arisen. It should be noted that since the previous site assessment BAL have undertaken significant work with respect to the site with a view to submitting a planning application. This work was halted when the previous MLP in which Shelford was allocated was withdrawn. However, that work is recent and remains relevant. Some of it has been taken into account in the assessment, in particular that in respect of the historic environment. However, other work, in particular with regard to ecology and hydrology has not been taken into account. Reports in respect of Landscape, hydrology, ecology and transport are attached as appendices.
11.12 The completion of the surveys and other work at Shelford mean that the deliverability of the site can be assured. In the site assessment process the County have determined that Shelford is deliverable. This is an important factor in determining the soundness of the plan.
11.13 Below is a table showing a comparison of the scoring for the Shelford site in the current SA and that as assessed by BAL. Below the table is an explanation in respect of each topic.
Biodiversity. The operational phase score has been downgraded to reflect that the site will be worked wet so there will be no disturbance to the hydrology of the nearby locally designated wildlife sites.
Landscape. This aspect of the assessment has shown the most significant change in scoring for the site changing from -2 to -3 during the operational phase but most surprising changing from -1 to -3 in the long term. The BAL landscape assessment analysis has found that the approach adopted by the County does not allow for an area to be not typical of its character area nor the possibility that positive impacts are possible where a landscape is sensitive to change. In particular the County's landscape analysis fails to understand that the course of the Trent has changed at Shelford, the river now runs through a highly engineered channel and the flood defences along the river have allowed intensive agriculture with large scale arable fields predominating. The mineral extraction provides a significant opportunity to reintroduce the water meadows adjacent to the village and overall a water environment which reflects the historic landscape context. This is a positive aspect of the restoration which is not reflected in the -3 for the long term score.
Flooding. Whilst designing the final restoration scheme for the site initial flood modeling was carried out to see whether flood defences adjacent to the river (these are secondary to those adjacent to Shelford village) could be removed to allow the reconnection of the floodplain. Unfortunately only partial realignment of the flood defence is possible because the flood modeling has shown that under various scenarios the Shelford land and its defences acts to reduce the impact of flooding further downstream. This work has shown that the site can be worked without increasing risk of flooding and in fact during the operational stage there will be an opportunity to improve the defences adjacent to the village. The operational score has been increased to reflect the work carried out and the potential to reduce the risk of flooding during the operations phase.
Climate change. Shelford is the only site where river barging is proposed. This will produce a positive impact from one third of the material being transported in a way that has less impact on climate. The operational score has been amended accordingly.
Efficient use of land. Previously the site assessment viewed larger sites as being more efficient as lots of smaller sites require numerous processing and other plant. This is still the case and the score has been amended accordingly.
Energy efficiency. One third of the material at Shelford will be transported by barge which is a significantly more energy efficient than road transport. The score has been amended accordingly.
Air quality. One third of the material at Shelford will be transported by barge which will result in less pollution than if that volume of material came from a site where only road transport were to be able. The score has been amended accordingly.
Water Quality. It is proposed that there will be no dewatering when the site is worked and there will be no imported material brought into the site consequently the risk to water quality is low and the score has been amended to reflect this.
Human health and quality of life. During the operational phase of the site it will be possible to open up permissive paths and the potential to improve the Shelford village flood defences together with the creation of the water meadows. The operational score has, therefore, been amended.
12 Question 24. What do you think of the draft policy wording for DM3: Agricultural land and soil quality?
12.1 As stated above there is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
13.What do you think of the draft policy wording for DM5: Landscape character?
12.1 BAL objects to the wording of this policy the first part of which would prevent any mineral development coming forward. It need to include the words "....will not cause unacceptable harm to the character...." Rather than " ...........will not adversely impact on the character .........."

Attachments:

Comment

Draft Nottinghamshire Minerals Local Plan

Question 5: What do you think of the draft strategic policy for climate change?

Representation ID: 32405

Received: 26/09/2018

Respondent: Brett Aggregates Limited

Representation Summary:

BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.

Full text:

Brett Aggregates Ltd (BAL) is a wholly owned subsidiary of Robert and Sons Limited (Brett), the aggregates, building materials and civil engineering business, which was established over a century ago. It is the largest independent producer of sand and gravel in the UK. BAL manages all Brett's quarry, marine dredged and recycled aggregates together with coated roadstone operations.
1.2 Following withdrawal of the Submission Draft of the Minerals Local Plan (MLP) in 2017 Nottinghamshire County Council (the County) published an Issues an Options document in respect of a revised MLP together with a Call for Sites. The County is now consulting on a Draft MLP and seeking responses by the 28th September 2018.
1.3 BAL's interest in Nottinghamshire is in respect of aggregate bearing land adjacent to the River Trent at Shelford. This land represents a significant sand and gravel resource, the future development of which will ensure that Nottinghamshire, in particular the south of the County including the City of Nottingham, will be able to meet a steady and adequate supply of aggregates throughout the plan period whilst minimizing the amount of mineral miles travelled on the County's road network by Heavy Goods Vehicles (HGVs) delivering aggregate. It will also provide for the delivery of material using the River Trent and the existing wharf at Colwick to bring aggregate into the established industrial area of the City for use in the production of concrete. This approach accords with National Planning Policy Guidance (NPPF) in respect of providing a steady and adequate supply of mineral and sustainable development objectives.
The comments made in this submission relate only to the questions raised by the County in the Draft MLP document and do not alter BAL's submissions in respect of the withdrawn MLP. The format of this response is to address those questions which relate to BAL's area of interest. As the MLP preparation proceeds and further information becomes available other matters may arise on which BAL may wish to comment.
Question 1. What do you think to the draft vision and strategic objectives set out in the plan?
2.1 Nottinghamshire has a varied population distribution and it would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
2.2 It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand, see later comments.
2.3 Generally BAL agrees that the draft vision is appropriate. In particular the need to ensure that mineral development is concentrated in locations that offer the greatest level of accessibility to major markets and growth areas.
QUESTION 2. What do you think of the draft strategic policy?
3.1 Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.
QUESTION 3. What do you think to the draft strategic policy for minerals provision?
4.1 BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties. This is particularly the case in Nottinghamshire where there is strong demand in the south of the County and where the main sites of the previous MLP are worked out thus limiting the opportunity for extensions to just one small quarry (see below for further justification in respect of this issue).
4.2 BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.
Question 4. What do you think of the draft strategic policy for biodiversity led restoration?
5.1 BAL supports this policy.
Question 5. What do you think of the draft strategic policy for climate change?
6.1 BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.
Question 6. What do you think of the draft strategic policy for sustainable development?
7.1 BAL supports this policy.
Question 7. What do you think of the draft strategic policy for the built, historic and natural environment?
8.1 There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
Question 9. What do you think of the draft strategic policy for Mineral Safeguarding Consultation Areas and associated minerals infrastructure?
9.1 BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.
Question 10. What do you think of the draft policy approach towards aggregate provision?
10.1 We object to the draft approach being taken .National Policy in relation to planning for future aggregate demand is to be found in NPPF. For an MLP to be found sound1 it is necessary for it to be
* Positively prepared
* Justified
* Effective
* Consistent with national policy
10.2 The assessment of need on which the County bases its MLP is an essential component of this process as follows. For the plan to be positively prepared it must look forward on the basis that proposed development as set out in other plans and proposals will come forward and that need must be met through adequate allocation of resources in the MLP. This requirement must also be met for the MLP to be justified and effective.
10.3 The requirement for the MLP to be consistent with national policy in relation to assessing need and in particular the calculation of an adequate landbank requirement for an MLP can be found in the NPPF as follows2
* Preparing an annual Local Aggregates Assessment (LAA) based on a rolling average of 10 years sales data and other relevant local information.
Ensuring that large landbanks bound up in a very few sites do not stifle competition.
10.4 It is clear from the NPPF that the 10 year rolling average should be a starting point and that other local factors should be taken into account. National Planning Practice Guidance gives advice as to what local factors should be taken into account. The guidance is that relevant local information used should be that which seeks to look ahead rather than just relying on past sales. The guidance goes onto advise that such information may include levels of planned construction and house building in the local area but also " throughout the country" 3
10.5 The Planning Officers Society in conjunction with the Mineral Products Association have also produced useful practical guidance in assessing need and in particular what sort of local information should be used in considering the adequacy of the 10 year rolling average. These include4:-
* Geological resources being exhausted
* Trends and forecasts of population change including information in Local Plans on house building.
* Validated data on aggregate use in construction provided by the MPA.
* Planned major infrastructure projects including those within the County and 30 miles beyond as detailed in the National Infrastructure Plan 2016-2020. Also those projects included in Local Economic Partnerships Growth Deals and Strategic Economic Plans together with construction projects identified in District and Unitary Authority's infrastructure Development Plans. Planned highway improvement and maintenance works should also be considered.
* Local Regional and national economic forecasts from various sources.
* Information from the minerals industry on the availability of marine materials.
* Major new sources of recycled or secondary material becoming available.
* New environmental constraints being identified in aggregate producing areas or in proximity to them.
10.6 In looking at the appropriateness of the rolling 10 year average as the basis for calculating future demand it is essential that the veracity of the information is examined forensically. In particular are there any factors which have influenced the data such that it does not truly reflect the production of aggregate in the County to the extent that it cannot be relied upon to predict future need. In terms of the basis of a future MLP will it result in a plan which is not justified or effective in terms of whether the plan is sound.
10.7 Geological resources being exhausted and the issue of Finningly Quarry. Finningley Quarry is situated on the northern border of Nottinghamshire where is abuts Doncaster. It should be noted that the latest Nottinghamshire LAA (Oct 2017) advises that the annual production figures for the County have been affected by production at Finningley moving across the border into some of the years covered by the latest 10 years of production5. If this situation were to continue to operate in the future, that is production moving in and out of the County then its inclusion in the 10 year rolling average would be a sound basis for predicting future need. However, the Notts LAA advises6 that the reserves in both Doncaster and Rotherham (also referred to as South Yorkshire) are extremely limited and future supplies will be coming from Nottinghamshire, in particular the quarry at Sturton le Steeple which has permitted reserves.
10.8 This being the case it is necessary to look at the impact Finningley Quarry moving across the border has had on the last 10 years production in Nottinghamshire. This can be done by looking at the Doncaster and Rotherham LAA. Whilst individual quarry production is confidential the explanation below Table 1 makes it clear that production decreased in 2010 from 0.5MT to 0.16MT probably due to production at Finningley moving across the border into Nottinghamshire. Looking at Table 1 production from 2006 to 2015 was either 0.4/5MT or 0.14/5/6MT which indicates that at the higher levels production at Finningley was in Doncaster and at the lower levels it was in Nottinghamshire. Consequently from Table 1 we can deduce which years there would have been a shortfall in the Finningley contribution to the Nottinghamshire landbank and we can calculate the annual difference this will make by averaging the higher and lower figures and subtracting the lower from the higher. The difference is calculated as 0.3MT (0.45MT less 0.15MT).
10.9 The Nottinghamshire 10 year rolling average for sand and gravel is based on the years 2007 to 2016 whilst the Rotherham and Doncaster LAA is based on 2006 to 2015. However the Notts LAA does advise that in 2016 production in Finningley was across the border in Doncaster. This means it is possible to estimate the amount of the shortfall in the Nottinghamshire 2007 to 2016 production figures attributable to production at Finningley being in Doncaster. The calculation is based on the table below.
10.10 The 10 year rolling average if being used to predict future requirement in Nottinghamshire should now be calculated using 10 years annual production which includes the Finningley missing years as detailed above. That requires an addition 1.5MT to be added to the 17.04MT to give 18.54MT and results in a 10 year average annual sales of 1.85MT compared with the County's calculation of 1.70MT. The contribution of Finningley Quarry to the landbank is clearly a significant local factor which should be taken into account in using the 10 year rolling average as the basis for predicting future need.
10.11 Population Change and house building. The second local factor which needs to be taken into account in reviewing the 10 year rolling average is house building rates in the County and what is now planned. The County's latest LAA (October 2017, December 2016 data) sets out the planned house building rates for the individual planning authorities in the County. It is important to note that these are not maximum rates but are those which have been rigorously tested through the Local Plan processes including Strategic Housing Market Assessments and in some cases full Independent Examination procedures. It is also important to note that the Local Plans on which these house building rates are based were using pre 2014 Office of National Statistic (ONS) data. The 2014 when applied to the districts in Nottinghamshire will invariably lead to an increase in requirement. Consequently the impact of the planned house building rates should be considered as a minimum on which aggregate requirement should be based.
10.12 At Appendix 1 is a Table 2 which shows the house building rates for the local planning authority areas in Nottinghamshire over the 10 year period covering that being used by the County for the 10 year rolling average. The information contained within Table 2 has been taken from the Annual Monitoring Reports and other documents produced by the LPAs. The extracts from these documents can also be found at Appendix 1.
10.13 From Table 2 it can be seen that the average annual house building rate per LPA area over the past 10 years has been 351 units per annum. This figure is directly comparable with the average annual sand and gravel production rates calculated from the past 10 year's production. Table 2 uses the future house building rates deduced by the County in the October 2017 LAA7 to show that the average future rate will be 571 dwellings per annum. This is an increase of 220 dwellings per annum and represents a 63% increase. It is essential that this increase is taken as the minimum as it is based on solid evidence, it is not stated as a maximum so may be exceeded and is likely to be an underestimate based on the 2014 ONS data and the latest government advice that house building must increase. The population of Nottinghamshire including the County is expected to grow from 1.13 million in 2016 to 1.25 million in 2036. This growth will require at least the planned house building detailed on Table 2 which is based on the lower pre ONS 2014 estimates and it should be noted that as house building picks up following the recession the annual average rate per authority has already reached 468 dwellings per annum (2015/6) which is 81% of the planned annual requirement.
10.14 Validated data on aggregate use in construction is provided by the MPA. The October 2017 LAA references the use of aggregates in house building as being 20% of total production. Although it should be noted that at the recent examination into the Oxfordshire MLP 35% was used. It should be noted that house building requires significant support construction such as local roads, schools, village halls etc.
10.15 Planned major infrastructure projects. The October 2017 LAA notes that no further major infrastructure projects have been identified since the production of the previous LAA (January 2017). However, the January 2017 LAA was based on significantly higher rolling 10 year average taking into account partly pre recession construction levels and, therefore, capturing higher level of construction. With the move to the most recent 10 year rolling average this is no longer the case and the LAA needs to recognize that planned infrastructure for the future is significantly higher than accounted for by the 10 year rolling average which now almost solely covering a recession period when infrastructure projects were virtually non-existent. An adjustment to the 10 year average which determines the future landbank needs to be made in order for the MLP to be based on realistic future aggregate need.
10.16 Infrastructure identified in the National Infrastructure Delivery Plan 2016 to 2021 for the Nottinghamshire area is:-
* Midland Main Line. Further electrification to Nottingham.
* East Coast Mainline. Station, signaling and track works to facilitate longer new Super Express Trains.
* HS2.
It should be noted that the time period for this infrastructure plan is just 5 years and represents only 16% of the MLP plan period. Also included in the plan is reference to the Midlands Engine and the proposal for carrying out feasibility studies in respect of upgrades to the M1 and Smart motorway improvements together with improvements to the A46 Newark bypass and its intersection with the A1.
10.17 The Local Enterprise Partnership D2N2 (covering Nottingham and Derby and parts of both counties) has produced a programme which includes a target to create 50,000 jobs and to build 77,000 dwellings. The dwellings are included in Local Plans but D2N2 are intending to ensure that infrastructure delivery does not frustrate the building of the dwellings.
10.18 East Midlands airport which lies alongside the HS2 route is planning to increase from 4.3 to 10 million passengers and 300,000 to 700,000t of freight by 2040. The majority of this development will occur in the MLP plan period. A major freight terminal is also planned for the M1 j23a/24. Whilst this is in Leicestershire it lies within the 30 mile zone beyond the County boundary which the POS/MPA advice considers should be included in any future assessment for aggregate provision within a County.
10.19 Local regional and national economic forecast. The latest MPA forecasts (February 2019) suggest that aggregate demand will have increased by 19% by 2019 compared to 2015. Infrastructure growth is expected to be 56% from 2015 to 2019. In the longer term replenishment rates for sand and gravel show that for every 100 tonnes of material used planning permissions for replacement accounts for only 56 tonnes indicating that in the future shortages of supply will be apparent.
10.20 Availability of marine materials. Nottinghamshire is a landlocked county and some distance from any marine sourced aggregate landing facility. Consequently the material is not used in the County.
10.21 Major new sources of recycled or secondary material. For Nottinghamshire inert waste processing (considered suitable for recycled aggregate production) has now recovered to pre recession rates. However, whilst power station ash is capable of being substituted for primary aggregates the 3 coal fired power stations within the County are all planned to be closed by 2025. It would, therefore, be unwise to rely on any further increase in recycled output and in fact a reduction in availability of this material should be planned.
10.22 New environmental constraints. No new environmental constraints which could restrict aggregate extraction in the County have been identified. Locally the ban on extraction in the Peak District National Park has been accounted for by Derbyshire planning to increase production in the rest of the County by an amount equivalent to that to be lost through lack of production in the National Park.
10.23 It is apparent from the above information that there are a number of factors pointing to the need to modify the rolling 10 year average if a robust prediction of future need is to be made. The evidence is that the figure will need to be increased on the basis that during the MLP period more aggregate will have to be exported to South Yorkshire, a greater number of dwellings will be built, more jobs created and more infrastructure built. Of these elements it has been possible to quantify numerically only the impact of the increase in future exports to South Yorkshire and house building rates. House building is considered to represent the use of only 20 to 35% of the total supply of aggregate. However, house building is a key component in providing dwellings for new employees who will occupy newly constructed factories and commercial premises. House building also drives infrastructure provision including roads, such as those around Newark, schools, hospitals etc. lt is, therefore, proposed that the house building rates of the past 10 years be compared with aggregate use of the same period and then used to predict future aggregate requirement.
10.24 Taking the 1.85MTPA (10 year rolling average modified to take account of the Finningley Quarry production changes within the County) is comparable with an 10 year rolling average house building rate of per local authority (including Nottingham City) of 351 dwellings per annum. The future house building rate is 572 dwellings per annum. This is an increase of 63% and will require a similar increase in aggregate production going forward. This requires that the 10 year rolling average be increased by 63% (1.63 x 1.85) to 3.02MT.
10.25 In order to fully understand why Nottinghamshire has failed to increase its annual production of aggregate to that approaching its pre recession rates it is useful to look at the 10 year production rates for the counties making up the East Midlands AWP area. Table 3 shows figures taken from the LAAs for these counties. The East Midlands in 2016 had reached 70% of its pre recession production rate. Three counties were at around pre recession levels with two counties actually producing more. Lincolnshire is now producing 64 % of its pre recession level but Nottinghamshire is only at 40%. It is clear that lack of production in Nottinghamshire is holding back the East Midlands in reaching pre recession production levels. This assessment supports the need to increase the proposed landbank above that which would result from using the rolling 10 year landbank as the basis for future need prediction and this should be 3.02MTPA to give a required landbank for the plan period ( 2017 to 2036) of 57.38MT.
Question 11. What do you think of the draft site specific sand and gravel allocations?
11.1 The Draft MLP states that the site specific allocations are based on a consideration of five options which were narrowed down to two criteria on which the decision to allocate was based. Firstly, the need to have a geographical spread of sites across the County and secondly to prioritise locations with potential for transporting sand and gravel by river barge. BAL considers that this approach is appropriate.
11.2 The draft MLP is supported by A Draft site selection methodology and assessment document, July 2018, (Draft Site Selection Document)) and Draft Minerals Local Plan Sustainability Appraisal Interim Report, July 2018 (Draft SA). The Draft SA contains a detailed numerically based site assessment methodology and a numerical assessment of all the sites put forward. This is surprising because the draft MLP specifically excludes as one of the five options considered allocating sites based on their particular merits. The SA numerical assessment is then taken forward in the Draft Site Selection Document (Section 6) where the geographical spread of sites is stated as the main basis in determining which sites to allocate although this is not based on an objectively assessed need for each area. The ability of material to be transported by river barge is not given priority in the final site selection process.
11.3 BAL consider that it is necessary to maintain a geographical spread of quarries and permitted reserves across the County for two reasons. Firstly is the cost of transporting bulky materials relative to value that in respect of aggregates is low. This means that an appropriate geographic spread is important to ensure that the economy works effectively and additional costs are not unnecessarily incurred. It is also the case that for this reason proposed aggregate reserves should be matched geographically to where those reserves will be used. Secondly is the issue of environmental impact caused by HGV movements associated with aggregate transport.
11.4 Below Table 5 shows the current distribution of permitted reserves compared with spatial requirement for future house building. This is based on the information contained within the October 2017 LAA in respect of permitted reserves and Table 4 at Appendix 3 of this document.
The current distribution is not sustainable in terms of transportation of aggregate and the consequences for air quality and climate change. If extensions to quarries were to be preferred compared to opening up new sites this unsustainable distribution will continue. This is not in accordance with the NPPF guidance in respect of sustainable development.
11.5 In respect of the geographical distribution of aggregate production in the County Table 6 below shows the comparison between future house building in the three aggregate production areas identified by the County and the proposed geographical spread of aggregate production (permitted and proposed) in the draft MLP. There is a significant discrepancy between the two factors with 16% of the house building taking place in the Newark area whilst 46% of the aggregate reserves are planned to be here. In respect of Idle Valley (north Nottinghamshire) 18% of the house building for the County is planned to be here but 36% of the aggregate reserves are proposed in the draft MLP. Meanwhile in the south of the County where 56% of the house building is planned only 18% of the aggregate reserves are proposed in the MLP.
11.6 Taking into account the information in Table 6 it is surprising that the Shelford site (located in the South) was dismissed as a proposed allocation in the draft MLP solely on the basis that to allocate such a large site (6.5MT) in the south would skew the geographical distribution whilst factually Shelford should be allocated to maintain the correct geographical spread of allocated and permitted reserves in the County.
11.7 Even if the limited landbank proposed by the County is accepted (BAL object to the limited landbank, see above) in order to meet the objective set out under policy MP2 of having a geographical spread and meeting the requirement for the plan to be "justified" more aggregate should be allocated in the south and less in the north. This can be achieved within the limited landbank put forward by deleting Botany Bay and Mill Hill (or alternatively one of the proposed Newark sites) as new allocations and substituting Shelford. This has the added benefit of meeting the second MP2 site selection criteria which is "potential for transporting sand and gravel by river barge" and with which Shelford is the only site complying. Furthermore, the allocation of Shelford would lead to a better commercial balance of supply than is currently, and proposed to be, the case by introducing a new operator into the County. This will ensure that the plan is sound with respect to NPPF para 207 (g).
11.8 The correct geographical distribution of aggregate resources proposed in the draft MLP is important because of the impact of moving mineral within the County and bringing mineral in from surrounding counties if the distribution does not match planned development. The above analysis has used house building as a marker because the level of house building reflects where jobs are to be created and consequently commercial development, local infrastructure and major infrastructure. Much of the infrastructure identified above in relation to the landbank assessment will take place in the south of the County and includes East-Midlands airport expansion, HS2, works to the Nottingham railway line etc. The consequences of not sourcing mineral close to where it is needed are that more miles are travelled by HGVs transporting the mineral. This has a negative impact on air quality and in the long run climate change.
11.9 The air quality and climate consequences have been assessed with respect to HGV movements associated with the proposed Shelford Quarry and those at Newark in the attached (Appendix 4) RPS document. This gives an indication of the problems associated with having a poor geographical distribution of mineral resources in the County.
11.10 In respect of Shelford and the site assessment which has been undertaken BAL have been surprised that a site which was assessed as scoring well under the previous, now withdrawn MLP, has now scored somewhat poorly. Whilst this has not led to officers proposing not to allocate the site which as set out above was solely on the basis of geographical spread of sites the documents underpinning the scoring have been analyzed and series of reports prepared.
Previously the County scored the Shelford site as -6 during the operational phase and 0 in the post operational phase. In the current SA the site is scored -10 in the operational phase and -1 in the post operational phase. Although it should be noted that the summation of the actual SA scores results in a total +2 for the long term.
11.11 BAL has commissioned reports on the various areas of the assessment where it is considered that discrepancies have arisen. It should be noted that since the previous site assessment BAL have undertaken significant work with respect to the site with a view to submitting a planning application. This work was halted when the previous MLP in which Shelford was allocated was withdrawn. However, that work is recent and remains relevant. Some of it has been taken into account in the assessment, in particular that in respect of the historic environment. However, other work, in particular with regard to ecology and hydrology has not been taken into account. Reports in respect of Landscape, hydrology, ecology and transport are attached as appendices.
11.12 The completion of the surveys and other work at Shelford mean that the deliverability of the site can be assured. In the site assessment process the County have determined that Shelford is deliverable. This is an important factor in determining the soundness of the plan.
11.13 Below is a table showing a comparison of the scoring for the Shelford site in the current SA and that as assessed by BAL. Below the table is an explanation in respect of each topic.
Biodiversity. The operational phase score has been downgraded to reflect that the site will be worked wet so there will be no disturbance to the hydrology of the nearby locally designated wildlife sites.
Landscape. This aspect of the assessment has shown the most significant change in scoring for the site changing from -2 to -3 during the operational phase but most surprising changing from -1 to -3 in the long term. The BAL landscape assessment analysis has found that the approach adopted by the County does not allow for an area to be not typical of its character area nor the possibility that positive impacts are possible where a landscape is sensitive to change. In particular the County's landscape analysis fails to understand that the course of the Trent has changed at Shelford, the river now runs through a highly engineered channel and the flood defences along the river have allowed intensive agriculture with large scale arable fields predominating. The mineral extraction provides a significant opportunity to reintroduce the water meadows adjacent to the village and overall a water environment which reflects the historic landscape context. This is a positive aspect of the restoration which is not reflected in the -3 for the long term score.
Flooding. Whilst designing the final restoration scheme for the site initial flood modeling was carried out to see whether flood defences adjacent to the river (these are secondary to those adjacent to Shelford village) could be removed to allow the reconnection of the floodplain. Unfortunately only partial realignment of the flood defence is possible because the flood modeling has shown that under various scenarios the Shelford land and its defences acts to reduce the impact of flooding further downstream. This work has shown that the site can be worked without increasing risk of flooding and in fact during the operational stage there will be an opportunity to improve the defences adjacent to the village. The operational score has been increased to reflect the work carried out and the potential to reduce the risk of flooding during the operations phase.
Climate change. Shelford is the only site where river barging is proposed. This will produce a positive impact from one third of the material being transported in a way that has less impact on climate. The operational score has been amended accordingly.
Efficient use of land. Previously the site assessment viewed larger sites as being more efficient as lots of smaller sites require numerous processing and other plant. This is still the case and the score has been amended accordingly.
Energy efficiency. One third of the material at Shelford will be transported by barge which is a significantly more energy efficient than road transport. The score has been amended accordingly.
Air quality. One third of the material at Shelford will be transported by barge which will result in less pollution than if that volume of material came from a site where only road transport were to be able. The score has been amended accordingly.
Water Quality. It is proposed that there will be no dewatering when the site is worked and there will be no imported material brought into the site consequently the risk to water quality is low and the score has been amended to reflect this.
Human health and quality of life. During the operational phase of the site it will be possible to open up permissive paths and the potential to improve the Shelford village flood defences together with the creation of the water meadows. The operational score has, therefore, been amended.
12 Question 24. What do you think of the draft policy wording for DM3: Agricultural land and soil quality?
12.1 As stated above there is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
13.What do you think of the draft policy wording for DM5: Landscape character?
12.1 BAL objects to the wording of this policy the first part of which would prevent any mineral development coming forward. It need to include the words "....will not cause unacceptable harm to the character...." Rather than " ...........will not adversely impact on the character .........."

Attachments:

Comment

Draft Nottinghamshire Minerals Local Plan

Question 6: What do you think of the draft strategic policy for sustainable transport?

Representation ID: 32406

Received: 26/09/2018

Respondent: Brett Aggregates Limited

Representation Summary:

BAL supports this policy.

Full text:

Brett Aggregates Ltd (BAL) is a wholly owned subsidiary of Robert and Sons Limited (Brett), the aggregates, building materials and civil engineering business, which was established over a century ago. It is the largest independent producer of sand and gravel in the UK. BAL manages all Brett's quarry, marine dredged and recycled aggregates together with coated roadstone operations.
1.2 Following withdrawal of the Submission Draft of the Minerals Local Plan (MLP) in 2017 Nottinghamshire County Council (the County) published an Issues an Options document in respect of a revised MLP together with a Call for Sites. The County is now consulting on a Draft MLP and seeking responses by the 28th September 2018.
1.3 BAL's interest in Nottinghamshire is in respect of aggregate bearing land adjacent to the River Trent at Shelford. This land represents a significant sand and gravel resource, the future development of which will ensure that Nottinghamshire, in particular the south of the County including the City of Nottingham, will be able to meet a steady and adequate supply of aggregates throughout the plan period whilst minimizing the amount of mineral miles travelled on the County's road network by Heavy Goods Vehicles (HGVs) delivering aggregate. It will also provide for the delivery of material using the River Trent and the existing wharf at Colwick to bring aggregate into the established industrial area of the City for use in the production of concrete. This approach accords with National Planning Policy Guidance (NPPF) in respect of providing a steady and adequate supply of mineral and sustainable development objectives.
The comments made in this submission relate only to the questions raised by the County in the Draft MLP document and do not alter BAL's submissions in respect of the withdrawn MLP. The format of this response is to address those questions which relate to BAL's area of interest. As the MLP preparation proceeds and further information becomes available other matters may arise on which BAL may wish to comment.
Question 1. What do you think to the draft vision and strategic objectives set out in the plan?
2.1 Nottinghamshire has a varied population distribution and it would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
2.2 It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand, see later comments.
2.3 Generally BAL agrees that the draft vision is appropriate. In particular the need to ensure that mineral development is concentrated in locations that offer the greatest level of accessibility to major markets and growth areas.
QUESTION 2. What do you think of the draft strategic policy?
3.1 Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.
QUESTION 3. What do you think to the draft strategic policy for minerals provision?
4.1 BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties. This is particularly the case in Nottinghamshire where there is strong demand in the south of the County and where the main sites of the previous MLP are worked out thus limiting the opportunity for extensions to just one small quarry (see below for further justification in respect of this issue).
4.2 BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.
Question 4. What do you think of the draft strategic policy for biodiversity led restoration?
5.1 BAL supports this policy.
Question 5. What do you think of the draft strategic policy for climate change?
6.1 BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.
Question 6. What do you think of the draft strategic policy for sustainable development?
7.1 BAL supports this policy.
Question 7. What do you think of the draft strategic policy for the built, historic and natural environment?
8.1 There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
Question 9. What do you think of the draft strategic policy for Mineral Safeguarding Consultation Areas and associated minerals infrastructure?
9.1 BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.
Question 10. What do you think of the draft policy approach towards aggregate provision?
10.1 We object to the draft approach being taken .National Policy in relation to planning for future aggregate demand is to be found in NPPF. For an MLP to be found sound1 it is necessary for it to be
* Positively prepared
* Justified
* Effective
* Consistent with national policy
10.2 The assessment of need on which the County bases its MLP is an essential component of this process as follows. For the plan to be positively prepared it must look forward on the basis that proposed development as set out in other plans and proposals will come forward and that need must be met through adequate allocation of resources in the MLP. This requirement must also be met for the MLP to be justified and effective.
10.3 The requirement for the MLP to be consistent with national policy in relation to assessing need and in particular the calculation of an adequate landbank requirement for an MLP can be found in the NPPF as follows2
* Preparing an annual Local Aggregates Assessment (LAA) based on a rolling average of 10 years sales data and other relevant local information.
Ensuring that large landbanks bound up in a very few sites do not stifle competition.
10.4 It is clear from the NPPF that the 10 year rolling average should be a starting point and that other local factors should be taken into account. National Planning Practice Guidance gives advice as to what local factors should be taken into account. The guidance is that relevant local information used should be that which seeks to look ahead rather than just relying on past sales. The guidance goes onto advise that such information may include levels of planned construction and house building in the local area but also " throughout the country" 3
10.5 The Planning Officers Society in conjunction with the Mineral Products Association have also produced useful practical guidance in assessing need and in particular what sort of local information should be used in considering the adequacy of the 10 year rolling average. These include4:-
* Geological resources being exhausted
* Trends and forecasts of population change including information in Local Plans on house building.
* Validated data on aggregate use in construction provided by the MPA.
* Planned major infrastructure projects including those within the County and 30 miles beyond as detailed in the National Infrastructure Plan 2016-2020. Also those projects included in Local Economic Partnerships Growth Deals and Strategic Economic Plans together with construction projects identified in District and Unitary Authority's infrastructure Development Plans. Planned highway improvement and maintenance works should also be considered.
* Local Regional and national economic forecasts from various sources.
* Information from the minerals industry on the availability of marine materials.
* Major new sources of recycled or secondary material becoming available.
* New environmental constraints being identified in aggregate producing areas or in proximity to them.
10.6 In looking at the appropriateness of the rolling 10 year average as the basis for calculating future demand it is essential that the veracity of the information is examined forensically. In particular are there any factors which have influenced the data such that it does not truly reflect the production of aggregate in the County to the extent that it cannot be relied upon to predict future need. In terms of the basis of a future MLP will it result in a plan which is not justified or effective in terms of whether the plan is sound.
10.7 Geological resources being exhausted and the issue of Finningly Quarry. Finningley Quarry is situated on the northern border of Nottinghamshire where is abuts Doncaster. It should be noted that the latest Nottinghamshire LAA (Oct 2017) advises that the annual production figures for the County have been affected by production at Finningley moving across the border into some of the years covered by the latest 10 years of production5. If this situation were to continue to operate in the future, that is production moving in and out of the County then its inclusion in the 10 year rolling average would be a sound basis for predicting future need. However, the Notts LAA advises6 that the reserves in both Doncaster and Rotherham (also referred to as South Yorkshire) are extremely limited and future supplies will be coming from Nottinghamshire, in particular the quarry at Sturton le Steeple which has permitted reserves.
10.8 This being the case it is necessary to look at the impact Finningley Quarry moving across the border has had on the last 10 years production in Nottinghamshire. This can be done by looking at the Doncaster and Rotherham LAA. Whilst individual quarry production is confidential the explanation below Table 1 makes it clear that production decreased in 2010 from 0.5MT to 0.16MT probably due to production at Finningley moving across the border into Nottinghamshire. Looking at Table 1 production from 2006 to 2015 was either 0.4/5MT or 0.14/5/6MT which indicates that at the higher levels production at Finningley was in Doncaster and at the lower levels it was in Nottinghamshire. Consequently from Table 1 we can deduce which years there would have been a shortfall in the Finningley contribution to the Nottinghamshire landbank and we can calculate the annual difference this will make by averaging the higher and lower figures and subtracting the lower from the higher. The difference is calculated as 0.3MT (0.45MT less 0.15MT).
10.9 The Nottinghamshire 10 year rolling average for sand and gravel is based on the years 2007 to 2016 whilst the Rotherham and Doncaster LAA is based on 2006 to 2015. However the Notts LAA does advise that in 2016 production in Finningley was across the border in Doncaster. This means it is possible to estimate the amount of the shortfall in the Nottinghamshire 2007 to 2016 production figures attributable to production at Finningley being in Doncaster. The calculation is based on the table below.
10.10 The 10 year rolling average if being used to predict future requirement in Nottinghamshire should now be calculated using 10 years annual production which includes the Finningley missing years as detailed above. That requires an addition 1.5MT to be added to the 17.04MT to give 18.54MT and results in a 10 year average annual sales of 1.85MT compared with the County's calculation of 1.70MT. The contribution of Finningley Quarry to the landbank is clearly a significant local factor which should be taken into account in using the 10 year rolling average as the basis for predicting future need.
10.11 Population Change and house building. The second local factor which needs to be taken into account in reviewing the 10 year rolling average is house building rates in the County and what is now planned. The County's latest LAA (October 2017, December 2016 data) sets out the planned house building rates for the individual planning authorities in the County. It is important to note that these are not maximum rates but are those which have been rigorously tested through the Local Plan processes including Strategic Housing Market Assessments and in some cases full Independent Examination procedures. It is also important to note that the Local Plans on which these house building rates are based were using pre 2014 Office of National Statistic (ONS) data. The 2014 when applied to the districts in Nottinghamshire will invariably lead to an increase in requirement. Consequently the impact of the planned house building rates should be considered as a minimum on which aggregate requirement should be based.
10.12 At Appendix 1 is a Table 2 which shows the house building rates for the local planning authority areas in Nottinghamshire over the 10 year period covering that being used by the County for the 10 year rolling average. The information contained within Table 2 has been taken from the Annual Monitoring Reports and other documents produced by the LPAs. The extracts from these documents can also be found at Appendix 1.
10.13 From Table 2 it can be seen that the average annual house building rate per LPA area over the past 10 years has been 351 units per annum. This figure is directly comparable with the average annual sand and gravel production rates calculated from the past 10 year's production. Table 2 uses the future house building rates deduced by the County in the October 2017 LAA7 to show that the average future rate will be 571 dwellings per annum. This is an increase of 220 dwellings per annum and represents a 63% increase. It is essential that this increase is taken as the minimum as it is based on solid evidence, it is not stated as a maximum so may be exceeded and is likely to be an underestimate based on the 2014 ONS data and the latest government advice that house building must increase. The population of Nottinghamshire including the County is expected to grow from 1.13 million in 2016 to 1.25 million in 2036. This growth will require at least the planned house building detailed on Table 2 which is based on the lower pre ONS 2014 estimates and it should be noted that as house building picks up following the recession the annual average rate per authority has already reached 468 dwellings per annum (2015/6) which is 81% of the planned annual requirement.
10.14 Validated data on aggregate use in construction is provided by the MPA. The October 2017 LAA references the use of aggregates in house building as being 20% of total production. Although it should be noted that at the recent examination into the Oxfordshire MLP 35% was used. It should be noted that house building requires significant support construction such as local roads, schools, village halls etc.
10.15 Planned major infrastructure projects. The October 2017 LAA notes that no further major infrastructure projects have been identified since the production of the previous LAA (January 2017). However, the January 2017 LAA was based on significantly higher rolling 10 year average taking into account partly pre recession construction levels and, therefore, capturing higher level of construction. With the move to the most recent 10 year rolling average this is no longer the case and the LAA needs to recognize that planned infrastructure for the future is significantly higher than accounted for by the 10 year rolling average which now almost solely covering a recession period when infrastructure projects were virtually non-existent. An adjustment to the 10 year average which determines the future landbank needs to be made in order for the MLP to be based on realistic future aggregate need.
10.16 Infrastructure identified in the National Infrastructure Delivery Plan 2016 to 2021 for the Nottinghamshire area is:-
* Midland Main Line. Further electrification to Nottingham.
* East Coast Mainline. Station, signaling and track works to facilitate longer new Super Express Trains.
* HS2.
It should be noted that the time period for this infrastructure plan is just 5 years and represents only 16% of the MLP plan period. Also included in the plan is reference to the Midlands Engine and the proposal for carrying out feasibility studies in respect of upgrades to the M1 and Smart motorway improvements together with improvements to the A46 Newark bypass and its intersection with the A1.
10.17 The Local Enterprise Partnership D2N2 (covering Nottingham and Derby and parts of both counties) has produced a programme which includes a target to create 50,000 jobs and to build 77,000 dwellings. The dwellings are included in Local Plans but D2N2 are intending to ensure that infrastructure delivery does not frustrate the building of the dwellings.
10.18 East Midlands airport which lies alongside the HS2 route is planning to increase from 4.3 to 10 million passengers and 300,000 to 700,000t of freight by 2040. The majority of this development will occur in the MLP plan period. A major freight terminal is also planned for the M1 j23a/24. Whilst this is in Leicestershire it lies within the 30 mile zone beyond the County boundary which the POS/MPA advice considers should be included in any future assessment for aggregate provision within a County.
10.19 Local regional and national economic forecast. The latest MPA forecasts (February 2019) suggest that aggregate demand will have increased by 19% by 2019 compared to 2015. Infrastructure growth is expected to be 56% from 2015 to 2019. In the longer term replenishment rates for sand and gravel show that for every 100 tonnes of material used planning permissions for replacement accounts for only 56 tonnes indicating that in the future shortages of supply will be apparent.
10.20 Availability of marine materials. Nottinghamshire is a landlocked county and some distance from any marine sourced aggregate landing facility. Consequently the material is not used in the County.
10.21 Major new sources of recycled or secondary material. For Nottinghamshire inert waste processing (considered suitable for recycled aggregate production) has now recovered to pre recession rates. However, whilst power station ash is capable of being substituted for primary aggregates the 3 coal fired power stations within the County are all planned to be closed by 2025. It would, therefore, be unwise to rely on any further increase in recycled output and in fact a reduction in availability of this material should be planned.
10.22 New environmental constraints. No new environmental constraints which could restrict aggregate extraction in the County have been identified. Locally the ban on extraction in the Peak District National Park has been accounted for by Derbyshire planning to increase production in the rest of the County by an amount equivalent to that to be lost through lack of production in the National Park.
10.23 It is apparent from the above information that there are a number of factors pointing to the need to modify the rolling 10 year average if a robust prediction of future need is to be made. The evidence is that the figure will need to be increased on the basis that during the MLP period more aggregate will have to be exported to South Yorkshire, a greater number of dwellings will be built, more jobs created and more infrastructure built. Of these elements it has been possible to quantify numerically only the impact of the increase in future exports to South Yorkshire and house building rates. House building is considered to represent the use of only 20 to 35% of the total supply of aggregate. However, house building is a key component in providing dwellings for new employees who will occupy newly constructed factories and commercial premises. House building also drives infrastructure provision including roads, such as those around Newark, schools, hospitals etc. lt is, therefore, proposed that the house building rates of the past 10 years be compared with aggregate use of the same period and then used to predict future aggregate requirement.
10.24 Taking the 1.85MTPA (10 year rolling average modified to take account of the Finningley Quarry production changes within the County) is comparable with an 10 year rolling average house building rate of per local authority (including Nottingham City) of 351 dwellings per annum. The future house building rate is 572 dwellings per annum. This is an increase of 63% and will require a similar increase in aggregate production going forward. This requires that the 10 year rolling average be increased by 63% (1.63 x 1.85) to 3.02MT.
10.25 In order to fully understand why Nottinghamshire has failed to increase its annual production of aggregate to that approaching its pre recession rates it is useful to look at the 10 year production rates for the counties making up the East Midlands AWP area. Table 3 shows figures taken from the LAAs for these counties. The East Midlands in 2016 had reached 70% of its pre recession production rate. Three counties were at around pre recession levels with two counties actually producing more. Lincolnshire is now producing 64 % of its pre recession level but Nottinghamshire is only at 40%. It is clear that lack of production in Nottinghamshire is holding back the East Midlands in reaching pre recession production levels. This assessment supports the need to increase the proposed landbank above that which would result from using the rolling 10 year landbank as the basis for future need prediction and this should be 3.02MTPA to give a required landbank for the plan period ( 2017 to 2036) of 57.38MT.
Question 11. What do you think of the draft site specific sand and gravel allocations?
11.1 The Draft MLP states that the site specific allocations are based on a consideration of five options which were narrowed down to two criteria on which the decision to allocate was based. Firstly, the need to have a geographical spread of sites across the County and secondly to prioritise locations with potential for transporting sand and gravel by river barge. BAL considers that this approach is appropriate.
11.2 The draft MLP is supported by A Draft site selection methodology and assessment document, July 2018, (Draft Site Selection Document)) and Draft Minerals Local Plan Sustainability Appraisal Interim Report, July 2018 (Draft SA). The Draft SA contains a detailed numerically based site assessment methodology and a numerical assessment of all the sites put forward. This is surprising because the draft MLP specifically excludes as one of the five options considered allocating sites based on their particular merits. The SA numerical assessment is then taken forward in the Draft Site Selection Document (Section 6) where the geographical spread of sites is stated as the main basis in determining which sites to allocate although this is not based on an objectively assessed need for each area. The ability of material to be transported by river barge is not given priority in the final site selection process.
11.3 BAL consider that it is necessary to maintain a geographical spread of quarries and permitted reserves across the County for two reasons. Firstly is the cost of transporting bulky materials relative to value that in respect of aggregates is low. This means that an appropriate geographic spread is important to ensure that the economy works effectively and additional costs are not unnecessarily incurred. It is also the case that for this reason proposed aggregate reserves should be matched geographically to where those reserves will be used. Secondly is the issue of environmental impact caused by HGV movements associated with aggregate transport.
11.4 Below Table 5 shows the current distribution of permitted reserves compared with spatial requirement for future house building. This is based on the information contained within the October 2017 LAA in respect of permitted reserves and Table 4 at Appendix 3 of this document.
The current distribution is not sustainable in terms of transportation of aggregate and the consequences for air quality and climate change. If extensions to quarries were to be preferred compared to opening up new sites this unsustainable distribution will continue. This is not in accordance with the NPPF guidance in respect of sustainable development.
11.5 In respect of the geographical distribution of aggregate production in the County Table 6 below shows the comparison between future house building in the three aggregate production areas identified by the County and the proposed geographical spread of aggregate production (permitted and proposed) in the draft MLP. There is a significant discrepancy between the two factors with 16% of the house building taking place in the Newark area whilst 46% of the aggregate reserves are planned to be here. In respect of Idle Valley (north Nottinghamshire) 18% of the house building for the County is planned to be here but 36% of the aggregate reserves are proposed in the draft MLP. Meanwhile in the south of the County where 56% of the house building is planned only 18% of the aggregate reserves are proposed in the MLP.
11.6 Taking into account the information in Table 6 it is surprising that the Shelford site (located in the South) was dismissed as a proposed allocation in the draft MLP solely on the basis that to allocate such a large site (6.5MT) in the south would skew the geographical distribution whilst factually Shelford should be allocated to maintain the correct geographical spread of allocated and permitted reserves in the County.
11.7 Even if the limited landbank proposed by the County is accepted (BAL object to the limited landbank, see above) in order to meet the objective set out under policy MP2 of having a geographical spread and meeting the requirement for the plan to be "justified" more aggregate should be allocated in the south and less in the north. This can be achieved within the limited landbank put forward by deleting Botany Bay and Mill Hill (or alternatively one of the proposed Newark sites) as new allocations and substituting Shelford. This has the added benefit of meeting the second MP2 site selection criteria which is "potential for transporting sand and gravel by river barge" and with which Shelford is the only site complying. Furthermore, the allocation of Shelford would lead to a better commercial balance of supply than is currently, and proposed to be, the case by introducing a new operator into the County. This will ensure that the plan is sound with respect to NPPF para 207 (g).
11.8 The correct geographical distribution of aggregate resources proposed in the draft MLP is important because of the impact of moving mineral within the County and bringing mineral in from surrounding counties if the distribution does not match planned development. The above analysis has used house building as a marker because the level of house building reflects where jobs are to be created and consequently commercial development, local infrastructure and major infrastructure. Much of the infrastructure identified above in relation to the landbank assessment will take place in the south of the County and includes East-Midlands airport expansion, HS2, works to the Nottingham railway line etc. The consequences of not sourcing mineral close to where it is needed are that more miles are travelled by HGVs transporting the mineral. This has a negative impact on air quality and in the long run climate change.
11.9 The air quality and climate consequences have been assessed with respect to HGV movements associated with the proposed Shelford Quarry and those at Newark in the attached (Appendix 4) RPS document. This gives an indication of the problems associated with having a poor geographical distribution of mineral resources in the County.
11.10 In respect of Shelford and the site assessment which has been undertaken BAL have been surprised that a site which was assessed as scoring well under the previous, now withdrawn MLP, has now scored somewhat poorly. Whilst this has not led to officers proposing not to allocate the site which as set out above was solely on the basis of geographical spread of sites the documents underpinning the scoring have been analyzed and series of reports prepared.
Previously the County scored the Shelford site as -6 during the operational phase and 0 in the post operational phase. In the current SA the site is scored -10 in the operational phase and -1 in the post operational phase. Although it should be noted that the summation of the actual SA scores results in a total +2 for the long term.
11.11 BAL has commissioned reports on the various areas of the assessment where it is considered that discrepancies have arisen. It should be noted that since the previous site assessment BAL have undertaken significant work with respect to the site with a view to submitting a planning application. This work was halted when the previous MLP in which Shelford was allocated was withdrawn. However, that work is recent and remains relevant. Some of it has been taken into account in the assessment, in particular that in respect of the historic environment. However, other work, in particular with regard to ecology and hydrology has not been taken into account. Reports in respect of Landscape, hydrology, ecology and transport are attached as appendices.
11.12 The completion of the surveys and other work at Shelford mean that the deliverability of the site can be assured. In the site assessment process the County have determined that Shelford is deliverable. This is an important factor in determining the soundness of the plan.
11.13 Below is a table showing a comparison of the scoring for the Shelford site in the current SA and that as assessed by BAL. Below the table is an explanation in respect of each topic.
Biodiversity. The operational phase score has been downgraded to reflect that the site will be worked wet so there will be no disturbance to the hydrology of the nearby locally designated wildlife sites.
Landscape. This aspect of the assessment has shown the most significant change in scoring for the site changing from -2 to -3 during the operational phase but most surprising changing from -1 to -3 in the long term. The BAL landscape assessment analysis has found that the approach adopted by the County does not allow for an area to be not typical of its character area nor the possibility that positive impacts are possible where a landscape is sensitive to change. In particular the County's landscape analysis fails to understand that the course of the Trent has changed at Shelford, the river now runs through a highly engineered channel and the flood defences along the river have allowed intensive agriculture with large scale arable fields predominating. The mineral extraction provides a significant opportunity to reintroduce the water meadows adjacent to the village and overall a water environment which reflects the historic landscape context. This is a positive aspect of the restoration which is not reflected in the -3 for the long term score.
Flooding. Whilst designing the final restoration scheme for the site initial flood modeling was carried out to see whether flood defences adjacent to the river (these are secondary to those adjacent to Shelford village) could be removed to allow the reconnection of the floodplain. Unfortunately only partial realignment of the flood defence is possible because the flood modeling has shown that under various scenarios the Shelford land and its defences acts to reduce the impact of flooding further downstream. This work has shown that the site can be worked without increasing risk of flooding and in fact during the operational stage there will be an opportunity to improve the defences adjacent to the village. The operational score has been increased to reflect the work carried out and the potential to reduce the risk of flooding during the operations phase.
Climate change. Shelford is the only site where river barging is proposed. This will produce a positive impact from one third of the material being transported in a way that has less impact on climate. The operational score has been amended accordingly.
Efficient use of land. Previously the site assessment viewed larger sites as being more efficient as lots of smaller sites require numerous processing and other plant. This is still the case and the score has been amended accordingly.
Energy efficiency. One third of the material at Shelford will be transported by barge which is a significantly more energy efficient than road transport. The score has been amended accordingly.
Air quality. One third of the material at Shelford will be transported by barge which will result in less pollution than if that volume of material came from a site where only road transport were to be able. The score has been amended accordingly.
Water Quality. It is proposed that there will be no dewatering when the site is worked and there will be no imported material brought into the site consequently the risk to water quality is low and the score has been amended to reflect this.
Human health and quality of life. During the operational phase of the site it will be possible to open up permissive paths and the potential to improve the Shelford village flood defences together with the creation of the water meadows. The operational score has, therefore, been amended.
12 Question 24. What do you think of the draft policy wording for DM3: Agricultural land and soil quality?
12.1 As stated above there is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
13.What do you think of the draft policy wording for DM5: Landscape character?
12.1 BAL objects to the wording of this policy the first part of which would prevent any mineral development coming forward. It need to include the words "....will not cause unacceptable harm to the character...." Rather than " ...........will not adversely impact on the character .........."

Attachments:

Comment

Draft Nottinghamshire Minerals Local Plan

Question 7: What do you think of the draft strategic policy for the built, historic and natural environment?

Representation ID: 32407

Received: 26/09/2018

Respondent: Brett Aggregates Limited

Representation Summary:

There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.

Full text:

Brett Aggregates Ltd (BAL) is a wholly owned subsidiary of Robert and Sons Limited (Brett), the aggregates, building materials and civil engineering business, which was established over a century ago. It is the largest independent producer of sand and gravel in the UK. BAL manages all Brett's quarry, marine dredged and recycled aggregates together with coated roadstone operations.
1.2 Following withdrawal of the Submission Draft of the Minerals Local Plan (MLP) in 2017 Nottinghamshire County Council (the County) published an Issues an Options document in respect of a revised MLP together with a Call for Sites. The County is now consulting on a Draft MLP and seeking responses by the 28th September 2018.
1.3 BAL's interest in Nottinghamshire is in respect of aggregate bearing land adjacent to the River Trent at Shelford. This land represents a significant sand and gravel resource, the future development of which will ensure that Nottinghamshire, in particular the south of the County including the City of Nottingham, will be able to meet a steady and adequate supply of aggregates throughout the plan period whilst minimizing the amount of mineral miles travelled on the County's road network by Heavy Goods Vehicles (HGVs) delivering aggregate. It will also provide for the delivery of material using the River Trent and the existing wharf at Colwick to bring aggregate into the established industrial area of the City for use in the production of concrete. This approach accords with National Planning Policy Guidance (NPPF) in respect of providing a steady and adequate supply of mineral and sustainable development objectives.
The comments made in this submission relate only to the questions raised by the County in the Draft MLP document and do not alter BAL's submissions in respect of the withdrawn MLP. The format of this response is to address those questions which relate to BAL's area of interest. As the MLP preparation proceeds and further information becomes available other matters may arise on which BAL may wish to comment.
Question 1. What do you think to the draft vision and strategic objectives set out in the plan?
2.1 Nottinghamshire has a varied population distribution and it would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
2.2 It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand, see later comments.
2.3 Generally BAL agrees that the draft vision is appropriate. In particular the need to ensure that mineral development is concentrated in locations that offer the greatest level of accessibility to major markets and growth areas.
QUESTION 2. What do you think of the draft strategic policy?
3.1 Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.
QUESTION 3. What do you think to the draft strategic policy for minerals provision?
4.1 BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties. This is particularly the case in Nottinghamshire where there is strong demand in the south of the County and where the main sites of the previous MLP are worked out thus limiting the opportunity for extensions to just one small quarry (see below for further justification in respect of this issue).
4.2 BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.
Question 4. What do you think of the draft strategic policy for biodiversity led restoration?
5.1 BAL supports this policy.
Question 5. What do you think of the draft strategic policy for climate change?
6.1 BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.
Question 6. What do you think of the draft strategic policy for sustainable development?
7.1 BAL supports this policy.
Question 7. What do you think of the draft strategic policy for the built, historic and natural environment?
8.1 There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
Question 9. What do you think of the draft strategic policy for Mineral Safeguarding Consultation Areas and associated minerals infrastructure?
9.1 BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.
Question 10. What do you think of the draft policy approach towards aggregate provision?
10.1 We object to the draft approach being taken .National Policy in relation to planning for future aggregate demand is to be found in NPPF. For an MLP to be found sound1 it is necessary for it to be
* Positively prepared
* Justified
* Effective
* Consistent with national policy
10.2 The assessment of need on which the County bases its MLP is an essential component of this process as follows. For the plan to be positively prepared it must look forward on the basis that proposed development as set out in other plans and proposals will come forward and that need must be met through adequate allocation of resources in the MLP. This requirement must also be met for the MLP to be justified and effective.
10.3 The requirement for the MLP to be consistent with national policy in relation to assessing need and in particular the calculation of an adequate landbank requirement for an MLP can be found in the NPPF as follows2
* Preparing an annual Local Aggregates Assessment (LAA) based on a rolling average of 10 years sales data and other relevant local information.
Ensuring that large landbanks bound up in a very few sites do not stifle competition.
10.4 It is clear from the NPPF that the 10 year rolling average should be a starting point and that other local factors should be taken into account. National Planning Practice Guidance gives advice as to what local factors should be taken into account. The guidance is that relevant local information used should be that which seeks to look ahead rather than just relying on past sales. The guidance goes onto advise that such information may include levels of planned construction and house building in the local area but also " throughout the country" 3
10.5 The Planning Officers Society in conjunction with the Mineral Products Association have also produced useful practical guidance in assessing need and in particular what sort of local information should be used in considering the adequacy of the 10 year rolling average. These include4:-
* Geological resources being exhausted
* Trends and forecasts of population change including information in Local Plans on house building.
* Validated data on aggregate use in construction provided by the MPA.
* Planned major infrastructure projects including those within the County and 30 miles beyond as detailed in the National Infrastructure Plan 2016-2020. Also those projects included in Local Economic Partnerships Growth Deals and Strategic Economic Plans together with construction projects identified in District and Unitary Authority's infrastructure Development Plans. Planned highway improvement and maintenance works should also be considered.
* Local Regional and national economic forecasts from various sources.
* Information from the minerals industry on the availability of marine materials.
* Major new sources of recycled or secondary material becoming available.
* New environmental constraints being identified in aggregate producing areas or in proximity to them.
10.6 In looking at the appropriateness of the rolling 10 year average as the basis for calculating future demand it is essential that the veracity of the information is examined forensically. In particular are there any factors which have influenced the data such that it does not truly reflect the production of aggregate in the County to the extent that it cannot be relied upon to predict future need. In terms of the basis of a future MLP will it result in a plan which is not justified or effective in terms of whether the plan is sound.
10.7 Geological resources being exhausted and the issue of Finningly Quarry. Finningley Quarry is situated on the northern border of Nottinghamshire where is abuts Doncaster. It should be noted that the latest Nottinghamshire LAA (Oct 2017) advises that the annual production figures for the County have been affected by production at Finningley moving across the border into some of the years covered by the latest 10 years of production5. If this situation were to continue to operate in the future, that is production moving in and out of the County then its inclusion in the 10 year rolling average would be a sound basis for predicting future need. However, the Notts LAA advises6 that the reserves in both Doncaster and Rotherham (also referred to as South Yorkshire) are extremely limited and future supplies will be coming from Nottinghamshire, in particular the quarry at Sturton le Steeple which has permitted reserves.
10.8 This being the case it is necessary to look at the impact Finningley Quarry moving across the border has had on the last 10 years production in Nottinghamshire. This can be done by looking at the Doncaster and Rotherham LAA. Whilst individual quarry production is confidential the explanation below Table 1 makes it clear that production decreased in 2010 from 0.5MT to 0.16MT probably due to production at Finningley moving across the border into Nottinghamshire. Looking at Table 1 production from 2006 to 2015 was either 0.4/5MT or 0.14/5/6MT which indicates that at the higher levels production at Finningley was in Doncaster and at the lower levels it was in Nottinghamshire. Consequently from Table 1 we can deduce which years there would have been a shortfall in the Finningley contribution to the Nottinghamshire landbank and we can calculate the annual difference this will make by averaging the higher and lower figures and subtracting the lower from the higher. The difference is calculated as 0.3MT (0.45MT less 0.15MT).
10.9 The Nottinghamshire 10 year rolling average for sand and gravel is based on the years 2007 to 2016 whilst the Rotherham and Doncaster LAA is based on 2006 to 2015. However the Notts LAA does advise that in 2016 production in Finningley was across the border in Doncaster. This means it is possible to estimate the amount of the shortfall in the Nottinghamshire 2007 to 2016 production figures attributable to production at Finningley being in Doncaster. The calculation is based on the table below.
10.10 The 10 year rolling average if being used to predict future requirement in Nottinghamshire should now be calculated using 10 years annual production which includes the Finningley missing years as detailed above. That requires an addition 1.5MT to be added to the 17.04MT to give 18.54MT and results in a 10 year average annual sales of 1.85MT compared with the County's calculation of 1.70MT. The contribution of Finningley Quarry to the landbank is clearly a significant local factor which should be taken into account in using the 10 year rolling average as the basis for predicting future need.
10.11 Population Change and house building. The second local factor which needs to be taken into account in reviewing the 10 year rolling average is house building rates in the County and what is now planned. The County's latest LAA (October 2017, December 2016 data) sets out the planned house building rates for the individual planning authorities in the County. It is important to note that these are not maximum rates but are those which have been rigorously tested through the Local Plan processes including Strategic Housing Market Assessments and in some cases full Independent Examination procedures. It is also important to note that the Local Plans on which these house building rates are based were using pre 2014 Office of National Statistic (ONS) data. The 2014 when applied to the districts in Nottinghamshire will invariably lead to an increase in requirement. Consequently the impact of the planned house building rates should be considered as a minimum on which aggregate requirement should be based.
10.12 At Appendix 1 is a Table 2 which shows the house building rates for the local planning authority areas in Nottinghamshire over the 10 year period covering that being used by the County for the 10 year rolling average. The information contained within Table 2 has been taken from the Annual Monitoring Reports and other documents produced by the LPAs. The extracts from these documents can also be found at Appendix 1.
10.13 From Table 2 it can be seen that the average annual house building rate per LPA area over the past 10 years has been 351 units per annum. This figure is directly comparable with the average annual sand and gravel production rates calculated from the past 10 year's production. Table 2 uses the future house building rates deduced by the County in the October 2017 LAA7 to show that the average future rate will be 571 dwellings per annum. This is an increase of 220 dwellings per annum and represents a 63% increase. It is essential that this increase is taken as the minimum as it is based on solid evidence, it is not stated as a maximum so may be exceeded and is likely to be an underestimate based on the 2014 ONS data and the latest government advice that house building must increase. The population of Nottinghamshire including the County is expected to grow from 1.13 million in 2016 to 1.25 million in 2036. This growth will require at least the planned house building detailed on Table 2 which is based on the lower pre ONS 2014 estimates and it should be noted that as house building picks up following the recession the annual average rate per authority has already reached 468 dwellings per annum (2015/6) which is 81% of the planned annual requirement.
10.14 Validated data on aggregate use in construction is provided by the MPA. The October 2017 LAA references the use of aggregates in house building as being 20% of total production. Although it should be noted that at the recent examination into the Oxfordshire MLP 35% was used. It should be noted that house building requires significant support construction such as local roads, schools, village halls etc.
10.15 Planned major infrastructure projects. The October 2017 LAA notes that no further major infrastructure projects have been identified since the production of the previous LAA (January 2017). However, the January 2017 LAA was based on significantly higher rolling 10 year average taking into account partly pre recession construction levels and, therefore, capturing higher level of construction. With the move to the most recent 10 year rolling average this is no longer the case and the LAA needs to recognize that planned infrastructure for the future is significantly higher than accounted for by the 10 year rolling average which now almost solely covering a recession period when infrastructure projects were virtually non-existent. An adjustment to the 10 year average which determines the future landbank needs to be made in order for the MLP to be based on realistic future aggregate need.
10.16 Infrastructure identified in the National Infrastructure Delivery Plan 2016 to 2021 for the Nottinghamshire area is:-
* Midland Main Line. Further electrification to Nottingham.
* East Coast Mainline. Station, signaling and track works to facilitate longer new Super Express Trains.
* HS2.
It should be noted that the time period for this infrastructure plan is just 5 years and represents only 16% of the MLP plan period. Also included in the plan is reference to the Midlands Engine and the proposal for carrying out feasibility studies in respect of upgrades to the M1 and Smart motorway improvements together with improvements to the A46 Newark bypass and its intersection with the A1.
10.17 The Local Enterprise Partnership D2N2 (covering Nottingham and Derby and parts of both counties) has produced a programme which includes a target to create 50,000 jobs and to build 77,000 dwellings. The dwellings are included in Local Plans but D2N2 are intending to ensure that infrastructure delivery does not frustrate the building of the dwellings.
10.18 East Midlands airport which lies alongside the HS2 route is planning to increase from 4.3 to 10 million passengers and 300,000 to 700,000t of freight by 2040. The majority of this development will occur in the MLP plan period. A major freight terminal is also planned for the M1 j23a/24. Whilst this is in Leicestershire it lies within the 30 mile zone beyond the County boundary which the POS/MPA advice considers should be included in any future assessment for aggregate provision within a County.
10.19 Local regional and national economic forecast. The latest MPA forecasts (February 2019) suggest that aggregate demand will have increased by 19% by 2019 compared to 2015. Infrastructure growth is expected to be 56% from 2015 to 2019. In the longer term replenishment rates for sand and gravel show that for every 100 tonnes of material used planning permissions for replacement accounts for only 56 tonnes indicating that in the future shortages of supply will be apparent.
10.20 Availability of marine materials. Nottinghamshire is a landlocked county and some distance from any marine sourced aggregate landing facility. Consequently the material is not used in the County.
10.21 Major new sources of recycled or secondary material. For Nottinghamshire inert waste processing (considered suitable for recycled aggregate production) has now recovered to pre recession rates. However, whilst power station ash is capable of being substituted for primary aggregates the 3 coal fired power stations within the County are all planned to be closed by 2025. It would, therefore, be unwise to rely on any further increase in recycled output and in fact a reduction in availability of this material should be planned.
10.22 New environmental constraints. No new environmental constraints which could restrict aggregate extraction in the County have been identified. Locally the ban on extraction in the Peak District National Park has been accounted for by Derbyshire planning to increase production in the rest of the County by an amount equivalent to that to be lost through lack of production in the National Park.
10.23 It is apparent from the above information that there are a number of factors pointing to the need to modify the rolling 10 year average if a robust prediction of future need is to be made. The evidence is that the figure will need to be increased on the basis that during the MLP period more aggregate will have to be exported to South Yorkshire, a greater number of dwellings will be built, more jobs created and more infrastructure built. Of these elements it has been possible to quantify numerically only the impact of the increase in future exports to South Yorkshire and house building rates. House building is considered to represent the use of only 20 to 35% of the total supply of aggregate. However, house building is a key component in providing dwellings for new employees who will occupy newly constructed factories and commercial premises. House building also drives infrastructure provision including roads, such as those around Newark, schools, hospitals etc. lt is, therefore, proposed that the house building rates of the past 10 years be compared with aggregate use of the same period and then used to predict future aggregate requirement.
10.24 Taking the 1.85MTPA (10 year rolling average modified to take account of the Finningley Quarry production changes within the County) is comparable with an 10 year rolling average house building rate of per local authority (including Nottingham City) of 351 dwellings per annum. The future house building rate is 572 dwellings per annum. This is an increase of 63% and will require a similar increase in aggregate production going forward. This requires that the 10 year rolling average be increased by 63% (1.63 x 1.85) to 3.02MT.
10.25 In order to fully understand why Nottinghamshire has failed to increase its annual production of aggregate to that approaching its pre recession rates it is useful to look at the 10 year production rates for the counties making up the East Midlands AWP area. Table 3 shows figures taken from the LAAs for these counties. The East Midlands in 2016 had reached 70% of its pre recession production rate. Three counties were at around pre recession levels with two counties actually producing more. Lincolnshire is now producing 64 % of its pre recession level but Nottinghamshire is only at 40%. It is clear that lack of production in Nottinghamshire is holding back the East Midlands in reaching pre recession production levels. This assessment supports the need to increase the proposed landbank above that which would result from using the rolling 10 year landbank as the basis for future need prediction and this should be 3.02MTPA to give a required landbank for the plan period ( 2017 to 2036) of 57.38MT.
Question 11. What do you think of the draft site specific sand and gravel allocations?
11.1 The Draft MLP states that the site specific allocations are based on a consideration of five options which were narrowed down to two criteria on which the decision to allocate was based. Firstly, the need to have a geographical spread of sites across the County and secondly to prioritise locations with potential for transporting sand and gravel by river barge. BAL considers that this approach is appropriate.
11.2 The draft MLP is supported by A Draft site selection methodology and assessment document, July 2018, (Draft Site Selection Document)) and Draft Minerals Local Plan Sustainability Appraisal Interim Report, July 2018 (Draft SA). The Draft SA contains a detailed numerically based site assessment methodology and a numerical assessment of all the sites put forward. This is surprising because the draft MLP specifically excludes as one of the five options considered allocating sites based on their particular merits. The SA numerical assessment is then taken forward in the Draft Site Selection Document (Section 6) where the geographical spread of sites is stated as the main basis in determining which sites to allocate although this is not based on an objectively assessed need for each area. The ability of material to be transported by river barge is not given priority in the final site selection process.
11.3 BAL consider that it is necessary to maintain a geographical spread of quarries and permitted reserves across the County for two reasons. Firstly is the cost of transporting bulky materials relative to value that in respect of aggregates is low. This means that an appropriate geographic spread is important to ensure that the economy works effectively and additional costs are not unnecessarily incurred. It is also the case that for this reason proposed aggregate reserves should be matched geographically to where those reserves will be used. Secondly is the issue of environmental impact caused by HGV movements associated with aggregate transport.
11.4 Below Table 5 shows the current distribution of permitted reserves compared with spatial requirement for future house building. This is based on the information contained within the October 2017 LAA in respect of permitted reserves and Table 4 at Appendix 3 of this document.
The current distribution is not sustainable in terms of transportation of aggregate and the consequences for air quality and climate change. If extensions to quarries were to be preferred compared to opening up new sites this unsustainable distribution will continue. This is not in accordance with the NPPF guidance in respect of sustainable development.
11.5 In respect of the geographical distribution of aggregate production in the County Table 6 below shows the comparison between future house building in the three aggregate production areas identified by the County and the proposed geographical spread of aggregate production (permitted and proposed) in the draft MLP. There is a significant discrepancy between the two factors with 16% of the house building taking place in the Newark area whilst 46% of the aggregate reserves are planned to be here. In respect of Idle Valley (north Nottinghamshire) 18% of the house building for the County is planned to be here but 36% of the aggregate reserves are proposed in the draft MLP. Meanwhile in the south of the County where 56% of the house building is planned only 18% of the aggregate reserves are proposed in the MLP.
11.6 Taking into account the information in Table 6 it is surprising that the Shelford site (located in the South) was dismissed as a proposed allocation in the draft MLP solely on the basis that to allocate such a large site (6.5MT) in the south would skew the geographical distribution whilst factually Shelford should be allocated to maintain the correct geographical spread of allocated and permitted reserves in the County.
11.7 Even if the limited landbank proposed by the County is accepted (BAL object to the limited landbank, see above) in order to meet the objective set out under policy MP2 of having a geographical spread and meeting the requirement for the plan to be "justified" more aggregate should be allocated in the south and less in the north. This can be achieved within the limited landbank put forward by deleting Botany Bay and Mill Hill (or alternatively one of the proposed Newark sites) as new allocations and substituting Shelford. This has the added benefit of meeting the second MP2 site selection criteria which is "potential for transporting sand and gravel by river barge" and with which Shelford is the only site complying. Furthermore, the allocation of Shelford would lead to a better commercial balance of supply than is currently, and proposed to be, the case by introducing a new operator into the County. This will ensure that the plan is sound with respect to NPPF para 207 (g).
11.8 The correct geographical distribution of aggregate resources proposed in the draft MLP is important because of the impact of moving mineral within the County and bringing mineral in from surrounding counties if the distribution does not match planned development. The above analysis has used house building as a marker because the level of house building reflects where jobs are to be created and consequently commercial development, local infrastructure and major infrastructure. Much of the infrastructure identified above in relation to the landbank assessment will take place in the south of the County and includes East-Midlands airport expansion, HS2, works to the Nottingham railway line etc. The consequences of not sourcing mineral close to where it is needed are that more miles are travelled by HGVs transporting the mineral. This has a negative impact on air quality and in the long run climate change.
11.9 The air quality and climate consequences have been assessed with respect to HGV movements associated with the proposed Shelford Quarry and those at Newark in the attached (Appendix 4) RPS document. This gives an indication of the problems associated with having a poor geographical distribution of mineral resources in the County.
11.10 In respect of Shelford and the site assessment which has been undertaken BAL have been surprised that a site which was assessed as scoring well under the previous, now withdrawn MLP, has now scored somewhat poorly. Whilst this has not led to officers proposing not to allocate the site which as set out above was solely on the basis of geographical spread of sites the documents underpinning the scoring have been analyzed and series of reports prepared.
Previously the County scored the Shelford site as -6 during the operational phase and 0 in the post operational phase. In the current SA the site is scored -10 in the operational phase and -1 in the post operational phase. Although it should be noted that the summation of the actual SA scores results in a total +2 for the long term.
11.11 BAL has commissioned reports on the various areas of the assessment where it is considered that discrepancies have arisen. It should be noted that since the previous site assessment BAL have undertaken significant work with respect to the site with a view to submitting a planning application. This work was halted when the previous MLP in which Shelford was allocated was withdrawn. However, that work is recent and remains relevant. Some of it has been taken into account in the assessment, in particular that in respect of the historic environment. However, other work, in particular with regard to ecology and hydrology has not been taken into account. Reports in respect of Landscape, hydrology, ecology and transport are attached as appendices.
11.12 The completion of the surveys and other work at Shelford mean that the deliverability of the site can be assured. In the site assessment process the County have determined that Shelford is deliverable. This is an important factor in determining the soundness of the plan.
11.13 Below is a table showing a comparison of the scoring for the Shelford site in the current SA and that as assessed by BAL. Below the table is an explanation in respect of each topic.
Biodiversity. The operational phase score has been downgraded to reflect that the site will be worked wet so there will be no disturbance to the hydrology of the nearby locally designated wildlife sites.
Landscape. This aspect of the assessment has shown the most significant change in scoring for the site changing from -2 to -3 during the operational phase but most surprising changing from -1 to -3 in the long term. The BAL landscape assessment analysis has found that the approach adopted by the County does not allow for an area to be not typical of its character area nor the possibility that positive impacts are possible where a landscape is sensitive to change. In particular the County's landscape analysis fails to understand that the course of the Trent has changed at Shelford, the river now runs through a highly engineered channel and the flood defences along the river have allowed intensive agriculture with large scale arable fields predominating. The mineral extraction provides a significant opportunity to reintroduce the water meadows adjacent to the village and overall a water environment which reflects the historic landscape context. This is a positive aspect of the restoration which is not reflected in the -3 for the long term score.
Flooding. Whilst designing the final restoration scheme for the site initial flood modeling was carried out to see whether flood defences adjacent to the river (these are secondary to those adjacent to Shelford village) could be removed to allow the reconnection of the floodplain. Unfortunately only partial realignment of the flood defence is possible because the flood modeling has shown that under various scenarios the Shelford land and its defences acts to reduce the impact of flooding further downstream. This work has shown that the site can be worked without increasing risk of flooding and in fact during the operational stage there will be an opportunity to improve the defences adjacent to the village. The operational score has been increased to reflect the work carried out and the potential to reduce the risk of flooding during the operations phase.
Climate change. Shelford is the only site where river barging is proposed. This will produce a positive impact from one third of the material being transported in a way that has less impact on climate. The operational score has been amended accordingly.
Efficient use of land. Previously the site assessment viewed larger sites as being more efficient as lots of smaller sites require numerous processing and other plant. This is still the case and the score has been amended accordingly.
Energy efficiency. One third of the material at Shelford will be transported by barge which is a significantly more energy efficient than road transport. The score has been amended accordingly.
Air quality. One third of the material at Shelford will be transported by barge which will result in less pollution than if that volume of material came from a site where only road transport were to be able. The score has been amended accordingly.
Water Quality. It is proposed that there will be no dewatering when the site is worked and there will be no imported material brought into the site consequently the risk to water quality is low and the score has been amended to reflect this.
Human health and quality of life. During the operational phase of the site it will be possible to open up permissive paths and the potential to improve the Shelford village flood defences together with the creation of the water meadows. The operational score has, therefore, been amended.
12 Question 24. What do you think of the draft policy wording for DM3: Agricultural land and soil quality?
12.1 As stated above there is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
13.What do you think of the draft policy wording for DM5: Landscape character?
12.1 BAL objects to the wording of this policy the first part of which would prevent any mineral development coming forward. It need to include the words "....will not cause unacceptable harm to the character...." Rather than " ...........will not adversely impact on the character .........."

Attachments:

Comment

Draft Nottinghamshire Minerals Local Plan

Question 9: What do you think of the draft strategic policy for minerals safeguarding, consultation areas and associated minerals infrastructure?

Representation ID: 32408

Received: 26/09/2018

Respondent: Brett Aggregates Limited

Representation Summary:

BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.

Full text:

Brett Aggregates Ltd (BAL) is a wholly owned subsidiary of Robert and Sons Limited (Brett), the aggregates, building materials and civil engineering business, which was established over a century ago. It is the largest independent producer of sand and gravel in the UK. BAL manages all Brett's quarry, marine dredged and recycled aggregates together with coated roadstone operations.
1.2 Following withdrawal of the Submission Draft of the Minerals Local Plan (MLP) in 2017 Nottinghamshire County Council (the County) published an Issues an Options document in respect of a revised MLP together with a Call for Sites. The County is now consulting on a Draft MLP and seeking responses by the 28th September 2018.
1.3 BAL's interest in Nottinghamshire is in respect of aggregate bearing land adjacent to the River Trent at Shelford. This land represents a significant sand and gravel resource, the future development of which will ensure that Nottinghamshire, in particular the south of the County including the City of Nottingham, will be able to meet a steady and adequate supply of aggregates throughout the plan period whilst minimizing the amount of mineral miles travelled on the County's road network by Heavy Goods Vehicles (HGVs) delivering aggregate. It will also provide for the delivery of material using the River Trent and the existing wharf at Colwick to bring aggregate into the established industrial area of the City for use in the production of concrete. This approach accords with National Planning Policy Guidance (NPPF) in respect of providing a steady and adequate supply of mineral and sustainable development objectives.
The comments made in this submission relate only to the questions raised by the County in the Draft MLP document and do not alter BAL's submissions in respect of the withdrawn MLP. The format of this response is to address those questions which relate to BAL's area of interest. As the MLP preparation proceeds and further information becomes available other matters may arise on which BAL may wish to comment.
Question 1. What do you think to the draft vision and strategic objectives set out in the plan?
2.1 Nottinghamshire has a varied population distribution and it would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
2.2 It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand, see later comments.
2.3 Generally BAL agrees that the draft vision is appropriate. In particular the need to ensure that mineral development is concentrated in locations that offer the greatest level of accessibility to major markets and growth areas.
QUESTION 2. What do you think of the draft strategic policy?
3.1 Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.
QUESTION 3. What do you think to the draft strategic policy for minerals provision?
4.1 BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties. This is particularly the case in Nottinghamshire where there is strong demand in the south of the County and where the main sites of the previous MLP are worked out thus limiting the opportunity for extensions to just one small quarry (see below for further justification in respect of this issue).
4.2 BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.
Question 4. What do you think of the draft strategic policy for biodiversity led restoration?
5.1 BAL supports this policy.
Question 5. What do you think of the draft strategic policy for climate change?
6.1 BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.
Question 6. What do you think of the draft strategic policy for sustainable development?
7.1 BAL supports this policy.
Question 7. What do you think of the draft strategic policy for the built, historic and natural environment?
8.1 There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
Question 9. What do you think of the draft strategic policy for Mineral Safeguarding Consultation Areas and associated minerals infrastructure?
9.1 BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.
Question 10. What do you think of the draft policy approach towards aggregate provision?
10.1 We object to the draft approach being taken .National Policy in relation to planning for future aggregate demand is to be found in NPPF. For an MLP to be found sound1 it is necessary for it to be
* Positively prepared
* Justified
* Effective
* Consistent with national policy
10.2 The assessment of need on which the County bases its MLP is an essential component of this process as follows. For the plan to be positively prepared it must look forward on the basis that proposed development as set out in other plans and proposals will come forward and that need must be met through adequate allocation of resources in the MLP. This requirement must also be met for the MLP to be justified and effective.
10.3 The requirement for the MLP to be consistent with national policy in relation to assessing need and in particular the calculation of an adequate landbank requirement for an MLP can be found in the NPPF as follows2
* Preparing an annual Local Aggregates Assessment (LAA) based on a rolling average of 10 years sales data and other relevant local information.
Ensuring that large landbanks bound up in a very few sites do not stifle competition.
10.4 It is clear from the NPPF that the 10 year rolling average should be a starting point and that other local factors should be taken into account. National Planning Practice Guidance gives advice as to what local factors should be taken into account. The guidance is that relevant local information used should be that which seeks to look ahead rather than just relying on past sales. The guidance goes onto advise that such information may include levels of planned construction and house building in the local area but also " throughout the country" 3
10.5 The Planning Officers Society in conjunction with the Mineral Products Association have also produced useful practical guidance in assessing need and in particular what sort of local information should be used in considering the adequacy of the 10 year rolling average. These include4:-
* Geological resources being exhausted
* Trends and forecasts of population change including information in Local Plans on house building.
* Validated data on aggregate use in construction provided by the MPA.
* Planned major infrastructure projects including those within the County and 30 miles beyond as detailed in the National Infrastructure Plan 2016-2020. Also those projects included in Local Economic Partnerships Growth Deals and Strategic Economic Plans together with construction projects identified in District and Unitary Authority's infrastructure Development Plans. Planned highway improvement and maintenance works should also be considered.
* Local Regional and national economic forecasts from various sources.
* Information from the minerals industry on the availability of marine materials.
* Major new sources of recycled or secondary material becoming available.
* New environmental constraints being identified in aggregate producing areas or in proximity to them.
10.6 In looking at the appropriateness of the rolling 10 year average as the basis for calculating future demand it is essential that the veracity of the information is examined forensically. In particular are there any factors which have influenced the data such that it does not truly reflect the production of aggregate in the County to the extent that it cannot be relied upon to predict future need. In terms of the basis of a future MLP will it result in a plan which is not justified or effective in terms of whether the plan is sound.
10.7 Geological resources being exhausted and the issue of Finningly Quarry. Finningley Quarry is situated on the northern border of Nottinghamshire where is abuts Doncaster. It should be noted that the latest Nottinghamshire LAA (Oct 2017) advises that the annual production figures for the County have been affected by production at Finningley moving across the border into some of the years covered by the latest 10 years of production5. If this situation were to continue to operate in the future, that is production moving in and out of the County then its inclusion in the 10 year rolling average would be a sound basis for predicting future need. However, the Notts LAA advises6 that the reserves in both Doncaster and Rotherham (also referred to as South Yorkshire) are extremely limited and future supplies will be coming from Nottinghamshire, in particular the quarry at Sturton le Steeple which has permitted reserves.
10.8 This being the case it is necessary to look at the impact Finningley Quarry moving across the border has had on the last 10 years production in Nottinghamshire. This can be done by looking at the Doncaster and Rotherham LAA. Whilst individual quarry production is confidential the explanation below Table 1 makes it clear that production decreased in 2010 from 0.5MT to 0.16MT probably due to production at Finningley moving across the border into Nottinghamshire. Looking at Table 1 production from 2006 to 2015 was either 0.4/5MT or 0.14/5/6MT which indicates that at the higher levels production at Finningley was in Doncaster and at the lower levels it was in Nottinghamshire. Consequently from Table 1 we can deduce which years there would have been a shortfall in the Finningley contribution to the Nottinghamshire landbank and we can calculate the annual difference this will make by averaging the higher and lower figures and subtracting the lower from the higher. The difference is calculated as 0.3MT (0.45MT less 0.15MT).
10.9 The Nottinghamshire 10 year rolling average for sand and gravel is based on the years 2007 to 2016 whilst the Rotherham and Doncaster LAA is based on 2006 to 2015. However the Notts LAA does advise that in 2016 production in Finningley was across the border in Doncaster. This means it is possible to estimate the amount of the shortfall in the Nottinghamshire 2007 to 2016 production figures attributable to production at Finningley being in Doncaster. The calculation is based on the table below.
10.10 The 10 year rolling average if being used to predict future requirement in Nottinghamshire should now be calculated using 10 years annual production which includes the Finningley missing years as detailed above. That requires an addition 1.5MT to be added to the 17.04MT to give 18.54MT and results in a 10 year average annual sales of 1.85MT compared with the County's calculation of 1.70MT. The contribution of Finningley Quarry to the landbank is clearly a significant local factor which should be taken into account in using the 10 year rolling average as the basis for predicting future need.
10.11 Population Change and house building. The second local factor which needs to be taken into account in reviewing the 10 year rolling average is house building rates in the County and what is now planned. The County's latest LAA (October 2017, December 2016 data) sets out the planned house building rates for the individual planning authorities in the County. It is important to note that these are not maximum rates but are those which have been rigorously tested through the Local Plan processes including Strategic Housing Market Assessments and in some cases full Independent Examination procedures. It is also important to note that the Local Plans on which these house building rates are based were using pre 2014 Office of National Statistic (ONS) data. The 2014 when applied to the districts in Nottinghamshire will invariably lead to an increase in requirement. Consequently the impact of the planned house building rates should be considered as a minimum on which aggregate requirement should be based.
10.12 At Appendix 1 is a Table 2 which shows the house building rates for the local planning authority areas in Nottinghamshire over the 10 year period covering that being used by the County for the 10 year rolling average. The information contained within Table 2 has been taken from the Annual Monitoring Reports and other documents produced by the LPAs. The extracts from these documents can also be found at Appendix 1.
10.13 From Table 2 it can be seen that the average annual house building rate per LPA area over the past 10 years has been 351 units per annum. This figure is directly comparable with the average annual sand and gravel production rates calculated from the past 10 year's production. Table 2 uses the future house building rates deduced by the County in the October 2017 LAA7 to show that the average future rate will be 571 dwellings per annum. This is an increase of 220 dwellings per annum and represents a 63% increase. It is essential that this increase is taken as the minimum as it is based on solid evidence, it is not stated as a maximum so may be exceeded and is likely to be an underestimate based on the 2014 ONS data and the latest government advice that house building must increase. The population of Nottinghamshire including the County is expected to grow from 1.13 million in 2016 to 1.25 million in 2036. This growth will require at least the planned house building detailed on Table 2 which is based on the lower pre ONS 2014 estimates and it should be noted that as house building picks up following the recession the annual average rate per authority has already reached 468 dwellings per annum (2015/6) which is 81% of the planned annual requirement.
10.14 Validated data on aggregate use in construction is provided by the MPA. The October 2017 LAA references the use of aggregates in house building as being 20% of total production. Although it should be noted that at the recent examination into the Oxfordshire MLP 35% was used. It should be noted that house building requires significant support construction such as local roads, schools, village halls etc.
10.15 Planned major infrastructure projects. The October 2017 LAA notes that no further major infrastructure projects have been identified since the production of the previous LAA (January 2017). However, the January 2017 LAA was based on significantly higher rolling 10 year average taking into account partly pre recession construction levels and, therefore, capturing higher level of construction. With the move to the most recent 10 year rolling average this is no longer the case and the LAA needs to recognize that planned infrastructure for the future is significantly higher than accounted for by the 10 year rolling average which now almost solely covering a recession period when infrastructure projects were virtually non-existent. An adjustment to the 10 year average which determines the future landbank needs to be made in order for the MLP to be based on realistic future aggregate need.
10.16 Infrastructure identified in the National Infrastructure Delivery Plan 2016 to 2021 for the Nottinghamshire area is:-
* Midland Main Line. Further electrification to Nottingham.
* East Coast Mainline. Station, signaling and track works to facilitate longer new Super Express Trains.
* HS2.
It should be noted that the time period for this infrastructure plan is just 5 years and represents only 16% of the MLP plan period. Also included in the plan is reference to the Midlands Engine and the proposal for carrying out feasibility studies in respect of upgrades to the M1 and Smart motorway improvements together with improvements to the A46 Newark bypass and its intersection with the A1.
10.17 The Local Enterprise Partnership D2N2 (covering Nottingham and Derby and parts of both counties) has produced a programme which includes a target to create 50,000 jobs and to build 77,000 dwellings. The dwellings are included in Local Plans but D2N2 are intending to ensure that infrastructure delivery does not frustrate the building of the dwellings.
10.18 East Midlands airport which lies alongside the HS2 route is planning to increase from 4.3 to 10 million passengers and 300,000 to 700,000t of freight by 2040. The majority of this development will occur in the MLP plan period. A major freight terminal is also planned for the M1 j23a/24. Whilst this is in Leicestershire it lies within the 30 mile zone beyond the County boundary which the POS/MPA advice considers should be included in any future assessment for aggregate provision within a County.
10.19 Local regional and national economic forecast. The latest MPA forecasts (February 2019) suggest that aggregate demand will have increased by 19% by 2019 compared to 2015. Infrastructure growth is expected to be 56% from 2015 to 2019. In the longer term replenishment rates for sand and gravel show that for every 100 tonnes of material used planning permissions for replacement accounts for only 56 tonnes indicating that in the future shortages of supply will be apparent.
10.20 Availability of marine materials. Nottinghamshire is a landlocked county and some distance from any marine sourced aggregate landing facility. Consequently the material is not used in the County.
10.21 Major new sources of recycled or secondary material. For Nottinghamshire inert waste processing (considered suitable for recycled aggregate production) has now recovered to pre recession rates. However, whilst power station ash is capable of being substituted for primary aggregates the 3 coal fired power stations within the County are all planned to be closed by 2025. It would, therefore, be unwise to rely on any further increase in recycled output and in fact a reduction in availability of this material should be planned.
10.22 New environmental constraints. No new environmental constraints which could restrict aggregate extraction in the County have been identified. Locally the ban on extraction in the Peak District National Park has been accounted for by Derbyshire planning to increase production in the rest of the County by an amount equivalent to that to be lost through lack of production in the National Park.
10.23 It is apparent from the above information that there are a number of factors pointing to the need to modify the rolling 10 year average if a robust prediction of future need is to be made. The evidence is that the figure will need to be increased on the basis that during the MLP period more aggregate will have to be exported to South Yorkshire, a greater number of dwellings will be built, more jobs created and more infrastructure built. Of these elements it has been possible to quantify numerically only the impact of the increase in future exports to South Yorkshire and house building rates. House building is considered to represent the use of only 20 to 35% of the total supply of aggregate. However, house building is a key component in providing dwellings for new employees who will occupy newly constructed factories and commercial premises. House building also drives infrastructure provision including roads, such as those around Newark, schools, hospitals etc. lt is, therefore, proposed that the house building rates of the past 10 years be compared with aggregate use of the same period and then used to predict future aggregate requirement.
10.24 Taking the 1.85MTPA (10 year rolling average modified to take account of the Finningley Quarry production changes within the County) is comparable with an 10 year rolling average house building rate of per local authority (including Nottingham City) of 351 dwellings per annum. The future house building rate is 572 dwellings per annum. This is an increase of 63% and will require a similar increase in aggregate production going forward. This requires that the 10 year rolling average be increased by 63% (1.63 x 1.85) to 3.02MT.
10.25 In order to fully understand why Nottinghamshire has failed to increase its annual production of aggregate to that approaching its pre recession rates it is useful to look at the 10 year production rates for the counties making up the East Midlands AWP area. Table 3 shows figures taken from the LAAs for these counties. The East Midlands in 2016 had reached 70% of its pre recession production rate. Three counties were at around pre recession levels with two counties actually producing more. Lincolnshire is now producing 64 % of its pre recession level but Nottinghamshire is only at 40%. It is clear that lack of production in Nottinghamshire is holding back the East Midlands in reaching pre recession production levels. This assessment supports the need to increase the proposed landbank above that which would result from using the rolling 10 year landbank as the basis for future need prediction and this should be 3.02MTPA to give a required landbank for the plan period ( 2017 to 2036) of 57.38MT.
Question 11. What do you think of the draft site specific sand and gravel allocations?
11.1 The Draft MLP states that the site specific allocations are based on a consideration of five options which were narrowed down to two criteria on which the decision to allocate was based. Firstly, the need to have a geographical spread of sites across the County and secondly to prioritise locations with potential for transporting sand and gravel by river barge. BAL considers that this approach is appropriate.
11.2 The draft MLP is supported by A Draft site selection methodology and assessment document, July 2018, (Draft Site Selection Document)) and Draft Minerals Local Plan Sustainability Appraisal Interim Report, July 2018 (Draft SA). The Draft SA contains a detailed numerically based site assessment methodology and a numerical assessment of all the sites put forward. This is surprising because the draft MLP specifically excludes as one of the five options considered allocating sites based on their particular merits. The SA numerical assessment is then taken forward in the Draft Site Selection Document (Section 6) where the geographical spread of sites is stated as the main basis in determining which sites to allocate although this is not based on an objectively assessed need for each area. The ability of material to be transported by river barge is not given priority in the final site selection process.
11.3 BAL consider that it is necessary to maintain a geographical spread of quarries and permitted reserves across the County for two reasons. Firstly is the cost of transporting bulky materials relative to value that in respect of aggregates is low. This means that an appropriate geographic spread is important to ensure that the economy works effectively and additional costs are not unnecessarily incurred. It is also the case that for this reason proposed aggregate reserves should be matched geographically to where those reserves will be used. Secondly is the issue of environmental impact caused by HGV movements associated with aggregate transport.
11.4 Below Table 5 shows the current distribution of permitted reserves compared with spatial requirement for future house building. This is based on the information contained within the October 2017 LAA in respect of permitted reserves and Table 4 at Appendix 3 of this document.
The current distribution is not sustainable in terms of transportation of aggregate and the consequences for air quality and climate change. If extensions to quarries were to be preferred compared to opening up new sites this unsustainable distribution will continue. This is not in accordance with the NPPF guidance in respect of sustainable development.
11.5 In respect of the geographical distribution of aggregate production in the County Table 6 below shows the comparison between future house building in the three aggregate production areas identified by the County and the proposed geographical spread of aggregate production (permitted and proposed) in the draft MLP. There is a significant discrepancy between the two factors with 16% of the house building taking place in the Newark area whilst 46% of the aggregate reserves are planned to be here. In respect of Idle Valley (north Nottinghamshire) 18% of the house building for the County is planned to be here but 36% of the aggregate reserves are proposed in the draft MLP. Meanwhile in the south of the County where 56% of the house building is planned only 18% of the aggregate reserves are proposed in the MLP.
11.6 Taking into account the information in Table 6 it is surprising that the Shelford site (located in the South) was dismissed as a proposed allocation in the draft MLP solely on the basis that to allocate such a large site (6.5MT) in the south would skew the geographical distribution whilst factually Shelford should be allocated to maintain the correct geographical spread of allocated and permitted reserves in the County.
11.7 Even if the limited landbank proposed by the County is accepted (BAL object to the limited landbank, see above) in order to meet the objective set out under policy MP2 of having a geographical spread and meeting the requirement for the plan to be "justified" more aggregate should be allocated in the south and less in the north. This can be achieved within the limited landbank put forward by deleting Botany Bay and Mill Hill (or alternatively one of the proposed Newark sites) as new allocations and substituting Shelford. This has the added benefit of meeting the second MP2 site selection criteria which is "potential for transporting sand and gravel by river barge" and with which Shelford is the only site complying. Furthermore, the allocation of Shelford would lead to a better commercial balance of supply than is currently, and proposed to be, the case by introducing a new operator into the County. This will ensure that the plan is sound with respect to NPPF para 207 (g).
11.8 The correct geographical distribution of aggregate resources proposed in the draft MLP is important because of the impact of moving mineral within the County and bringing mineral in from surrounding counties if the distribution does not match planned development. The above analysis has used house building as a marker because the level of house building reflects where jobs are to be created and consequently commercial development, local infrastructure and major infrastructure. Much of the infrastructure identified above in relation to the landbank assessment will take place in the south of the County and includes East-Midlands airport expansion, HS2, works to the Nottingham railway line etc. The consequences of not sourcing mineral close to where it is needed are that more miles are travelled by HGVs transporting the mineral. This has a negative impact on air quality and in the long run climate change.
11.9 The air quality and climate consequences have been assessed with respect to HGV movements associated with the proposed Shelford Quarry and those at Newark in the attached (Appendix 4) RPS document. This gives an indication of the problems associated with having a poor geographical distribution of mineral resources in the County.
11.10 In respect of Shelford and the site assessment which has been undertaken BAL have been surprised that a site which was assessed as scoring well under the previous, now withdrawn MLP, has now scored somewhat poorly. Whilst this has not led to officers proposing not to allocate the site which as set out above was solely on the basis of geographical spread of sites the documents underpinning the scoring have been analyzed and series of reports prepared.
Previously the County scored the Shelford site as -6 during the operational phase and 0 in the post operational phase. In the current SA the site is scored -10 in the operational phase and -1 in the post operational phase. Although it should be noted that the summation of the actual SA scores results in a total +2 for the long term.
11.11 BAL has commissioned reports on the various areas of the assessment where it is considered that discrepancies have arisen. It should be noted that since the previous site assessment BAL have undertaken significant work with respect to the site with a view to submitting a planning application. This work was halted when the previous MLP in which Shelford was allocated was withdrawn. However, that work is recent and remains relevant. Some of it has been taken into account in the assessment, in particular that in respect of the historic environment. However, other work, in particular with regard to ecology and hydrology has not been taken into account. Reports in respect of Landscape, hydrology, ecology and transport are attached as appendices.
11.12 The completion of the surveys and other work at Shelford mean that the deliverability of the site can be assured. In the site assessment process the County have determined that Shelford is deliverable. This is an important factor in determining the soundness of the plan.
11.13 Below is a table showing a comparison of the scoring for the Shelford site in the current SA and that as assessed by BAL. Below the table is an explanation in respect of each topic.
Biodiversity. The operational phase score has been downgraded to reflect that the site will be worked wet so there will be no disturbance to the hydrology of the nearby locally designated wildlife sites.
Landscape. This aspect of the assessment has shown the most significant change in scoring for the site changing from -2 to -3 during the operational phase but most surprising changing from -1 to -3 in the long term. The BAL landscape assessment analysis has found that the approach adopted by the County does not allow for an area to be not typical of its character area nor the possibility that positive impacts are possible where a landscape is sensitive to change. In particular the County's landscape analysis fails to understand that the course of the Trent has changed at Shelford, the river now runs through a highly engineered channel and the flood defences along the river have allowed intensive agriculture with large scale arable fields predominating. The mineral extraction provides a significant opportunity to reintroduce the water meadows adjacent to the village and overall a water environment which reflects the historic landscape context. This is a positive aspect of the restoration which is not reflected in the -3 for the long term score.
Flooding. Whilst designing the final restoration scheme for the site initial flood modeling was carried out to see whether flood defences adjacent to the river (these are secondary to those adjacent to Shelford village) could be removed to allow the reconnection of the floodplain. Unfortunately only partial realignment of the flood defence is possible because the flood modeling has shown that under various scenarios the Shelford land and its defences acts to reduce the impact of flooding further downstream. This work has shown that the site can be worked without increasing risk of flooding and in fact during the operational stage there will be an opportunity to improve the defences adjacent to the village. The operational score has been increased to reflect the work carried out and the potential to reduce the risk of flooding during the operations phase.
Climate change. Shelford is the only site where river barging is proposed. This will produce a positive impact from one third of the material being transported in a way that has less impact on climate. The operational score has been amended accordingly.
Efficient use of land. Previously the site assessment viewed larger sites as being more efficient as lots of smaller sites require numerous processing and other plant. This is still the case and the score has been amended accordingly.
Energy efficiency. One third of the material at Shelford will be transported by barge which is a significantly more energy efficient than road transport. The score has been amended accordingly.
Air quality. One third of the material at Shelford will be transported by barge which will result in less pollution than if that volume of material came from a site where only road transport were to be able. The score has been amended accordingly.
Water Quality. It is proposed that there will be no dewatering when the site is worked and there will be no imported material brought into the site consequently the risk to water quality is low and the score has been amended to reflect this.
Human health and quality of life. During the operational phase of the site it will be possible to open up permissive paths and the potential to improve the Shelford village flood defences together with the creation of the water meadows. The operational score has, therefore, been amended.
12 Question 24. What do you think of the draft policy wording for DM3: Agricultural land and soil quality?
12.1 As stated above there is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
13.What do you think of the draft policy wording for DM5: Landscape character?
12.1 BAL objects to the wording of this policy the first part of which would prevent any mineral development coming forward. It need to include the words "....will not cause unacceptable harm to the character...." Rather than " ...........will not adversely impact on the character .........."

Attachments:

Comment

Draft Nottinghamshire Minerals Local Plan

Question 10: What do you think of the draft policy approach regarding future aggregate provision?

Representation ID: 32409

Received: 26/09/2018

Respondent: Brett Aggregates Limited

Representation Summary:

We object to the draft approach being taken. National Policy in relation to planning for future aggregate demand is to be found in NPPF.
Annual sales over the plan period should stand at 3.02 million tonnes per annum.
For further information see the full representation.

Full text:

Brett Aggregates Ltd (BAL) is a wholly owned subsidiary of Robert and Sons Limited (Brett), the aggregates, building materials and civil engineering business, which was established over a century ago. It is the largest independent producer of sand and gravel in the UK. BAL manages all Brett's quarry, marine dredged and recycled aggregates together with coated roadstone operations.
1.2 Following withdrawal of the Submission Draft of the Minerals Local Plan (MLP) in 2017 Nottinghamshire County Council (the County) published an Issues an Options document in respect of a revised MLP together with a Call for Sites. The County is now consulting on a Draft MLP and seeking responses by the 28th September 2018.
1.3 BAL's interest in Nottinghamshire is in respect of aggregate bearing land adjacent to the River Trent at Shelford. This land represents a significant sand and gravel resource, the future development of which will ensure that Nottinghamshire, in particular the south of the County including the City of Nottingham, will be able to meet a steady and adequate supply of aggregates throughout the plan period whilst minimizing the amount of mineral miles travelled on the County's road network by Heavy Goods Vehicles (HGVs) delivering aggregate. It will also provide for the delivery of material using the River Trent and the existing wharf at Colwick to bring aggregate into the established industrial area of the City for use in the production of concrete. This approach accords with National Planning Policy Guidance (NPPF) in respect of providing a steady and adequate supply of mineral and sustainable development objectives.
The comments made in this submission relate only to the questions raised by the County in the Draft MLP document and do not alter BAL's submissions in respect of the withdrawn MLP. The format of this response is to address those questions which relate to BAL's area of interest. As the MLP preparation proceeds and further information becomes available other matters may arise on which BAL may wish to comment.
Question 1. What do you think to the draft vision and strategic objectives set out in the plan?
2.1 Nottinghamshire has a varied population distribution and it would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
2.2 It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand, see later comments.
2.3 Generally BAL agrees that the draft vision is appropriate. In particular the need to ensure that mineral development is concentrated in locations that offer the greatest level of accessibility to major markets and growth areas.
QUESTION 2. What do you think of the draft strategic policy?
3.1 Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.
QUESTION 3. What do you think to the draft strategic policy for minerals provision?
4.1 BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties. This is particularly the case in Nottinghamshire where there is strong demand in the south of the County and where the main sites of the previous MLP are worked out thus limiting the opportunity for extensions to just one small quarry (see below for further justification in respect of this issue).
4.2 BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.
Question 4. What do you think of the draft strategic policy for biodiversity led restoration?
5.1 BAL supports this policy.
Question 5. What do you think of the draft strategic policy for climate change?
6.1 BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.
Question 6. What do you think of the draft strategic policy for sustainable development?
7.1 BAL supports this policy.
Question 7. What do you think of the draft strategic policy for the built, historic and natural environment?
8.1 There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
Question 9. What do you think of the draft strategic policy for Mineral Safeguarding Consultation Areas and associated minerals infrastructure?
9.1 BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.
Question 10. What do you think of the draft policy approach towards aggregate provision?
10.1 We object to the draft approach being taken .National Policy in relation to planning for future aggregate demand is to be found in NPPF. For an MLP to be found sound1 it is necessary for it to be
* Positively prepared
* Justified
* Effective
* Consistent with national policy
10.2 The assessment of need on which the County bases its MLP is an essential component of this process as follows. For the plan to be positively prepared it must look forward on the basis that proposed development as set out in other plans and proposals will come forward and that need must be met through adequate allocation of resources in the MLP. This requirement must also be met for the MLP to be justified and effective.
10.3 The requirement for the MLP to be consistent with national policy in relation to assessing need and in particular the calculation of an adequate landbank requirement for an MLP can be found in the NPPF as follows2
* Preparing an annual Local Aggregates Assessment (LAA) based on a rolling average of 10 years sales data and other relevant local information.
Ensuring that large landbanks bound up in a very few sites do not stifle competition.
10.4 It is clear from the NPPF that the 10 year rolling average should be a starting point and that other local factors should be taken into account. National Planning Practice Guidance gives advice as to what local factors should be taken into account. The guidance is that relevant local information used should be that which seeks to look ahead rather than just relying on past sales. The guidance goes onto advise that such information may include levels of planned construction and house building in the local area but also " throughout the country" 3
10.5 The Planning Officers Society in conjunction with the Mineral Products Association have also produced useful practical guidance in assessing need and in particular what sort of local information should be used in considering the adequacy of the 10 year rolling average. These include4:-
* Geological resources being exhausted
* Trends and forecasts of population change including information in Local Plans on house building.
* Validated data on aggregate use in construction provided by the MPA.
* Planned major infrastructure projects including those within the County and 30 miles beyond as detailed in the National Infrastructure Plan 2016-2020. Also those projects included in Local Economic Partnerships Growth Deals and Strategic Economic Plans together with construction projects identified in District and Unitary Authority's infrastructure Development Plans. Planned highway improvement and maintenance works should also be considered.
* Local Regional and national economic forecasts from various sources.
* Information from the minerals industry on the availability of marine materials.
* Major new sources of recycled or secondary material becoming available.
* New environmental constraints being identified in aggregate producing areas or in proximity to them.
10.6 In looking at the appropriateness of the rolling 10 year average as the basis for calculating future demand it is essential that the veracity of the information is examined forensically. In particular are there any factors which have influenced the data such that it does not truly reflect the production of aggregate in the County to the extent that it cannot be relied upon to predict future need. In terms of the basis of a future MLP will it result in a plan which is not justified or effective in terms of whether the plan is sound.
10.7 Geological resources being exhausted and the issue of Finningly Quarry. Finningley Quarry is situated on the northern border of Nottinghamshire where is abuts Doncaster. It should be noted that the latest Nottinghamshire LAA (Oct 2017) advises that the annual production figures for the County have been affected by production at Finningley moving across the border into some of the years covered by the latest 10 years of production5. If this situation were to continue to operate in the future, that is production moving in and out of the County then its inclusion in the 10 year rolling average would be a sound basis for predicting future need. However, the Notts LAA advises6 that the reserves in both Doncaster and Rotherham (also referred to as South Yorkshire) are extremely limited and future supplies will be coming from Nottinghamshire, in particular the quarry at Sturton le Steeple which has permitted reserves.
10.8 This being the case it is necessary to look at the impact Finningley Quarry moving across the border has had on the last 10 years production in Nottinghamshire. This can be done by looking at the Doncaster and Rotherham LAA. Whilst individual quarry production is confidential the explanation below Table 1 makes it clear that production decreased in 2010 from 0.5MT to 0.16MT probably due to production at Finningley moving across the border into Nottinghamshire. Looking at Table 1 production from 2006 to 2015 was either 0.4/5MT or 0.14/5/6MT which indicates that at the higher levels production at Finningley was in Doncaster and at the lower levels it was in Nottinghamshire. Consequently from Table 1 we can deduce which years there would have been a shortfall in the Finningley contribution to the Nottinghamshire landbank and we can calculate the annual difference this will make by averaging the higher and lower figures and subtracting the lower from the higher. The difference is calculated as 0.3MT (0.45MT less 0.15MT).
10.9 The Nottinghamshire 10 year rolling average for sand and gravel is based on the years 2007 to 2016 whilst the Rotherham and Doncaster LAA is based on 2006 to 2015. However the Notts LAA does advise that in 2016 production in Finningley was across the border in Doncaster. This means it is possible to estimate the amount of the shortfall in the Nottinghamshire 2007 to 2016 production figures attributable to production at Finningley being in Doncaster. The calculation is based on the table below.
10.10 The 10 year rolling average if being used to predict future requirement in Nottinghamshire should now be calculated using 10 years annual production which includes the Finningley missing years as detailed above. That requires an addition 1.5MT to be added to the 17.04MT to give 18.54MT and results in a 10 year average annual sales of 1.85MT compared with the County's calculation of 1.70MT. The contribution of Finningley Quarry to the landbank is clearly a significant local factor which should be taken into account in using the 10 year rolling average as the basis for predicting future need.
10.11 Population Change and house building. The second local factor which needs to be taken into account in reviewing the 10 year rolling average is house building rates in the County and what is now planned. The County's latest LAA (October 2017, December 2016 data) sets out the planned house building rates for the individual planning authorities in the County. It is important to note that these are not maximum rates but are those which have been rigorously tested through the Local Plan processes including Strategic Housing Market Assessments and in some cases full Independent Examination procedures. It is also important to note that the Local Plans on which these house building rates are based were using pre 2014 Office of National Statistic (ONS) data. The 2014 when applied to the districts in Nottinghamshire will invariably lead to an increase in requirement. Consequently the impact of the planned house building rates should be considered as a minimum on which aggregate requirement should be based.
10.12 At Appendix 1 is a Table 2 which shows the house building rates for the local planning authority areas in Nottinghamshire over the 10 year period covering that being used by the County for the 10 year rolling average. The information contained within Table 2 has been taken from the Annual Monitoring Reports and other documents produced by the LPAs. The extracts from these documents can also be found at Appendix 1.
10.13 From Table 2 it can be seen that the average annual house building rate per LPA area over the past 10 years has been 351 units per annum. This figure is directly comparable with the average annual sand and gravel production rates calculated from the past 10 year's production. Table 2 uses the future house building rates deduced by the County in the October 2017 LAA7 to show that the average future rate will be 571 dwellings per annum. This is an increase of 220 dwellings per annum and represents a 63% increase. It is essential that this increase is taken as the minimum as it is based on solid evidence, it is not stated as a maximum so may be exceeded and is likely to be an underestimate based on the 2014 ONS data and the latest government advice that house building must increase. The population of Nottinghamshire including the County is expected to grow from 1.13 million in 2016 to 1.25 million in 2036. This growth will require at least the planned house building detailed on Table 2 which is based on the lower pre ONS 2014 estimates and it should be noted that as house building picks up following the recession the annual average rate per authority has already reached 468 dwellings per annum (2015/6) which is 81% of the planned annual requirement.
10.14 Validated data on aggregate use in construction is provided by the MPA. The October 2017 LAA references the use of aggregates in house building as being 20% of total production. Although it should be noted that at the recent examination into the Oxfordshire MLP 35% was used. It should be noted that house building requires significant support construction such as local roads, schools, village halls etc.
10.15 Planned major infrastructure projects. The October 2017 LAA notes that no further major infrastructure projects have been identified since the production of the previous LAA (January 2017). However, the January 2017 LAA was based on significantly higher rolling 10 year average taking into account partly pre recession construction levels and, therefore, capturing higher level of construction. With the move to the most recent 10 year rolling average this is no longer the case and the LAA needs to recognize that planned infrastructure for the future is significantly higher than accounted for by the 10 year rolling average which now almost solely covering a recession period when infrastructure projects were virtually non-existent. An adjustment to the 10 year average which determines the future landbank needs to be made in order for the MLP to be based on realistic future aggregate need.
10.16 Infrastructure identified in the National Infrastructure Delivery Plan 2016 to 2021 for the Nottinghamshire area is:-
* Midland Main Line. Further electrification to Nottingham.
* East Coast Mainline. Station, signaling and track works to facilitate longer new Super Express Trains.
* HS2.
It should be noted that the time period for this infrastructure plan is just 5 years and represents only 16% of the MLP plan period. Also included in the plan is reference to the Midlands Engine and the proposal for carrying out feasibility studies in respect of upgrades to the M1 and Smart motorway improvements together with improvements to the A46 Newark bypass and its intersection with the A1.
10.17 The Local Enterprise Partnership D2N2 (covering Nottingham and Derby and parts of both counties) has produced a programme which includes a target to create 50,000 jobs and to build 77,000 dwellings. The dwellings are included in Local Plans but D2N2 are intending to ensure that infrastructure delivery does not frustrate the building of the dwellings.
10.18 East Midlands airport which lies alongside the HS2 route is planning to increase from 4.3 to 10 million passengers and 300,000 to 700,000t of freight by 2040. The majority of this development will occur in the MLP plan period. A major freight terminal is also planned for the M1 j23a/24. Whilst this is in Leicestershire it lies within the 30 mile zone beyond the County boundary which the POS/MPA advice considers should be included in any future assessment for aggregate provision within a County.
10.19 Local regional and national economic forecast. The latest MPA forecasts (February 2019) suggest that aggregate demand will have increased by 19% by 2019 compared to 2015. Infrastructure growth is expected to be 56% from 2015 to 2019. In the longer term replenishment rates for sand and gravel show that for every 100 tonnes of material used planning permissions for replacement accounts for only 56 tonnes indicating that in the future shortages of supply will be apparent.
10.20 Availability of marine materials. Nottinghamshire is a landlocked county and some distance from any marine sourced aggregate landing facility. Consequently the material is not used in the County.
10.21 Major new sources of recycled or secondary material. For Nottinghamshire inert waste processing (considered suitable for recycled aggregate production) has now recovered to pre recession rates. However, whilst power station ash is capable of being substituted for primary aggregates the 3 coal fired power stations within the County are all planned to be closed by 2025. It would, therefore, be unwise to rely on any further increase in recycled output and in fact a reduction in availability of this material should be planned.
10.22 New environmental constraints. No new environmental constraints which could restrict aggregate extraction in the County have been identified. Locally the ban on extraction in the Peak District National Park has been accounted for by Derbyshire planning to increase production in the rest of the County by an amount equivalent to that to be lost through lack of production in the National Park.
10.23 It is apparent from the above information that there are a number of factors pointing to the need to modify the rolling 10 year average if a robust prediction of future need is to be made. The evidence is that the figure will need to be increased on the basis that during the MLP period more aggregate will have to be exported to South Yorkshire, a greater number of dwellings will be built, more jobs created and more infrastructure built. Of these elements it has been possible to quantify numerically only the impact of the increase in future exports to South Yorkshire and house building rates. House building is considered to represent the use of only 20 to 35% of the total supply of aggregate. However, house building is a key component in providing dwellings for new employees who will occupy newly constructed factories and commercial premises. House building also drives infrastructure provision including roads, such as those around Newark, schools, hospitals etc. lt is, therefore, proposed that the house building rates of the past 10 years be compared with aggregate use of the same period and then used to predict future aggregate requirement.
10.24 Taking the 1.85MTPA (10 year rolling average modified to take account of the Finningley Quarry production changes within the County) is comparable with an 10 year rolling average house building rate of per local authority (including Nottingham City) of 351 dwellings per annum. The future house building rate is 572 dwellings per annum. This is an increase of 63% and will require a similar increase in aggregate production going forward. This requires that the 10 year rolling average be increased by 63% (1.63 x 1.85) to 3.02MT.
10.25 In order to fully understand why Nottinghamshire has failed to increase its annual production of aggregate to that approaching its pre recession rates it is useful to look at the 10 year production rates for the counties making up the East Midlands AWP area. Table 3 shows figures taken from the LAAs for these counties. The East Midlands in 2016 had reached 70% of its pre recession production rate. Three counties were at around pre recession levels with two counties actually producing more. Lincolnshire is now producing 64 % of its pre recession level but Nottinghamshire is only at 40%. It is clear that lack of production in Nottinghamshire is holding back the East Midlands in reaching pre recession production levels. This assessment supports the need to increase the proposed landbank above that which would result from using the rolling 10 year landbank as the basis for future need prediction and this should be 3.02MTPA to give a required landbank for the plan period ( 2017 to 2036) of 57.38MT.
Question 11. What do you think of the draft site specific sand and gravel allocations?
11.1 The Draft MLP states that the site specific allocations are based on a consideration of five options which were narrowed down to two criteria on which the decision to allocate was based. Firstly, the need to have a geographical spread of sites across the County and secondly to prioritise locations with potential for transporting sand and gravel by river barge. BAL considers that this approach is appropriate.
11.2 The draft MLP is supported by A Draft site selection methodology and assessment document, July 2018, (Draft Site Selection Document)) and Draft Minerals Local Plan Sustainability Appraisal Interim Report, July 2018 (Draft SA). The Draft SA contains a detailed numerically based site assessment methodology and a numerical assessment of all the sites put forward. This is surprising because the draft MLP specifically excludes as one of the five options considered allocating sites based on their particular merits. The SA numerical assessment is then taken forward in the Draft Site Selection Document (Section 6) where the geographical spread of sites is stated as the main basis in determining which sites to allocate although this is not based on an objectively assessed need for each area. The ability of material to be transported by river barge is not given priority in the final site selection process.
11.3 BAL consider that it is necessary to maintain a geographical spread of quarries and permitted reserves across the County for two reasons. Firstly is the cost of transporting bulky materials relative to value that in respect of aggregates is low. This means that an appropriate geographic spread is important to ensure that the economy works effectively and additional costs are not unnecessarily incurred. It is also the case that for this reason proposed aggregate reserves should be matched geographically to where those reserves will be used. Secondly is the issue of environmental impact caused by HGV movements associated with aggregate transport.
11.4 Below Table 5 shows the current distribution of permitted reserves compared with spatial requirement for future house building. This is based on the information contained within the October 2017 LAA in respect of permitted reserves and Table 4 at Appendix 3 of this document.
The current distribution is not sustainable in terms of transportation of aggregate and the consequences for air quality and climate change. If extensions to quarries were to be preferred compared to opening up new sites this unsustainable distribution will continue. This is not in accordance with the NPPF guidance in respect of sustainable development.
11.5 In respect of the geographical distribution of aggregate production in the County Table 6 below shows the comparison between future house building in the three aggregate production areas identified by the County and the proposed geographical spread of aggregate production (permitted and proposed) in the draft MLP. There is a significant discrepancy between the two factors with 16% of the house building taking place in the Newark area whilst 46% of the aggregate reserves are planned to be here. In respect of Idle Valley (north Nottinghamshire) 18% of the house building for the County is planned to be here but 36% of the aggregate reserves are proposed in the draft MLP. Meanwhile in the south of the County where 56% of the house building is planned only 18% of the aggregate reserves are proposed in the MLP.
11.6 Taking into account the information in Table 6 it is surprising that the Shelford site (located in the South) was dismissed as a proposed allocation in the draft MLP solely on the basis that to allocate such a large site (6.5MT) in the south would skew the geographical distribution whilst factually Shelford should be allocated to maintain the correct geographical spread of allocated and permitted reserves in the County.
11.7 Even if the limited landbank proposed by the County is accepted (BAL object to the limited landbank, see above) in order to meet the objective set out under policy MP2 of having a geographical spread and meeting the requirement for the plan to be "justified" more aggregate should be allocated in the south and less in the north. This can be achieved within the limited landbank put forward by deleting Botany Bay and Mill Hill (or alternatively one of the proposed Newark sites) as new allocations and substituting Shelford. This has the added benefit of meeting the second MP2 site selection criteria which is "potential for transporting sand and gravel by river barge" and with which Shelford is the only site complying. Furthermore, the allocation of Shelford would lead to a better commercial balance of supply than is currently, and proposed to be, the case by introducing a new operator into the County. This will ensure that the plan is sound with respect to NPPF para 207 (g).
11.8 The correct geographical distribution of aggregate resources proposed in the draft MLP is important because of the impact of moving mineral within the County and bringing mineral in from surrounding counties if the distribution does not match planned development. The above analysis has used house building as a marker because the level of house building reflects where jobs are to be created and consequently commercial development, local infrastructure and major infrastructure. Much of the infrastructure identified above in relation to the landbank assessment will take place in the south of the County and includes East-Midlands airport expansion, HS2, works to the Nottingham railway line etc. The consequences of not sourcing mineral close to where it is needed are that more miles are travelled by HGVs transporting the mineral. This has a negative impact on air quality and in the long run climate change.
11.9 The air quality and climate consequences have been assessed with respect to HGV movements associated with the proposed Shelford Quarry and those at Newark in the attached (Appendix 4) RPS document. This gives an indication of the problems associated with having a poor geographical distribution of mineral resources in the County.
11.10 In respect of Shelford and the site assessment which has been undertaken BAL have been surprised that a site which was assessed as scoring well under the previous, now withdrawn MLP, has now scored somewhat poorly. Whilst this has not led to officers proposing not to allocate the site which as set out above was solely on the basis of geographical spread of sites the documents underpinning the scoring have been analyzed and series of reports prepared.
Previously the County scored the Shelford site as -6 during the operational phase and 0 in the post operational phase. In the current SA the site is scored -10 in the operational phase and -1 in the post operational phase. Although it should be noted that the summation of the actual SA scores results in a total +2 for the long term.
11.11 BAL has commissioned reports on the various areas of the assessment where it is considered that discrepancies have arisen. It should be noted that since the previous site assessment BAL have undertaken significant work with respect to the site with a view to submitting a planning application. This work was halted when the previous MLP in which Shelford was allocated was withdrawn. However, that work is recent and remains relevant. Some of it has been taken into account in the assessment, in particular that in respect of the historic environment. However, other work, in particular with regard to ecology and hydrology has not been taken into account. Reports in respect of Landscape, hydrology, ecology and transport are attached as appendices.
11.12 The completion of the surveys and other work at Shelford mean that the deliverability of the site can be assured. In the site assessment process the County have determined that Shelford is deliverable. This is an important factor in determining the soundness of the plan.
11.13 Below is a table showing a comparison of the scoring for the Shelford site in the current SA and that as assessed by BAL. Below the table is an explanation in respect of each topic.
Biodiversity. The operational phase score has been downgraded to reflect that the site will be worked wet so there will be no disturbance to the hydrology of the nearby locally designated wildlife sites.
Landscape. This aspect of the assessment has shown the most significant change in scoring for the site changing from -2 to -3 during the operational phase but most surprising changing from -1 to -3 in the long term. The BAL landscape assessment analysis has found that the approach adopted by the County does not allow for an area to be not typical of its character area nor the possibility that positive impacts are possible where a landscape is sensitive to change. In particular the County's landscape analysis fails to understand that the course of the Trent has changed at Shelford, the river now runs through a highly engineered channel and the flood defences along the river have allowed intensive agriculture with large scale arable fields predominating. The mineral extraction provides a significant opportunity to reintroduce the water meadows adjacent to the village and overall a water environment which reflects the historic landscape context. This is a positive aspect of the restoration which is not reflected in the -3 for the long term score.
Flooding. Whilst designing the final restoration scheme for the site initial flood modeling was carried out to see whether flood defences adjacent to the river (these are secondary to those adjacent to Shelford village) could be removed to allow the reconnection of the floodplain. Unfortunately only partial realignment of the flood defence is possible because the flood modeling has shown that under various scenarios the Shelford land and its defences acts to reduce the impact of flooding further downstream. This work has shown that the site can be worked without increasing risk of flooding and in fact during the operational stage there will be an opportunity to improve the defences adjacent to the village. The operational score has been increased to reflect the work carried out and the potential to reduce the risk of flooding during the operations phase.
Climate change. Shelford is the only site where river barging is proposed. This will produce a positive impact from one third of the material being transported in a way that has less impact on climate. The operational score has been amended accordingly.
Efficient use of land. Previously the site assessment viewed larger sites as being more efficient as lots of smaller sites require numerous processing and other plant. This is still the case and the score has been amended accordingly.
Energy efficiency. One third of the material at Shelford will be transported by barge which is a significantly more energy efficient than road transport. The score has been amended accordingly.
Air quality. One third of the material at Shelford will be transported by barge which will result in less pollution than if that volume of material came from a site where only road transport were to be able. The score has been amended accordingly.
Water Quality. It is proposed that there will be no dewatering when the site is worked and there will be no imported material brought into the site consequently the risk to water quality is low and the score has been amended to reflect this.
Human health and quality of life. During the operational phase of the site it will be possible to open up permissive paths and the potential to improve the Shelford village flood defences together with the creation of the water meadows. The operational score has, therefore, been amended.
12 Question 24. What do you think of the draft policy wording for DM3: Agricultural land and soil quality?
12.1 As stated above there is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
13.What do you think of the draft policy wording for DM5: Landscape character?
12.1 BAL objects to the wording of this policy the first part of which would prevent any mineral development coming forward. It need to include the words "....will not cause unacceptable harm to the character...." Rather than " ...........will not adversely impact on the character .........."

Attachments:

Comment

Draft Nottinghamshire Minerals Local Plan

Question 11: What do you think of the draft site specific sand and gravel allocations?

Representation ID: 32410

Received: 26/09/2018

Respondent: Brett Aggregates Limited

Representation Summary:

A geographical spread of sites across the county is supported. Based on the evidence provided it is argued that the shelford proposal if allocated would maintain the geographical spread of permitted reserves across the county.
See full representation for full details.

Full text:

Brett Aggregates Ltd (BAL) is a wholly owned subsidiary of Robert and Sons Limited (Brett), the aggregates, building materials and civil engineering business, which was established over a century ago. It is the largest independent producer of sand and gravel in the UK. BAL manages all Brett's quarry, marine dredged and recycled aggregates together with coated roadstone operations.
1.2 Following withdrawal of the Submission Draft of the Minerals Local Plan (MLP) in 2017 Nottinghamshire County Council (the County) published an Issues an Options document in respect of a revised MLP together with a Call for Sites. The County is now consulting on a Draft MLP and seeking responses by the 28th September 2018.
1.3 BAL's interest in Nottinghamshire is in respect of aggregate bearing land adjacent to the River Trent at Shelford. This land represents a significant sand and gravel resource, the future development of which will ensure that Nottinghamshire, in particular the south of the County including the City of Nottingham, will be able to meet a steady and adequate supply of aggregates throughout the plan period whilst minimizing the amount of mineral miles travelled on the County's road network by Heavy Goods Vehicles (HGVs) delivering aggregate. It will also provide for the delivery of material using the River Trent and the existing wharf at Colwick to bring aggregate into the established industrial area of the City for use in the production of concrete. This approach accords with National Planning Policy Guidance (NPPF) in respect of providing a steady and adequate supply of mineral and sustainable development objectives.
The comments made in this submission relate only to the questions raised by the County in the Draft MLP document and do not alter BAL's submissions in respect of the withdrawn MLP. The format of this response is to address those questions which relate to BAL's area of interest. As the MLP preparation proceeds and further information becomes available other matters may arise on which BAL may wish to comment.
Question 1. What do you think to the draft vision and strategic objectives set out in the plan?
2.1 Nottinghamshire has a varied population distribution and it would be helpful to show on Plan 1 the relative sizes of the principal towns and Nottingham City in terms of population size. This would be helpful in understanding where demand for aggregate is likely to arise.
2.2 It would also be useful to show where the boundaries of adjoining Mineral Planning Authorities intersect with the boundary for Nottinghamshire. This information would be helpful in understanding the spatial inter relationship with the neighbouring counties as there is significant interaction between them in respect of mineral production and demand, see later comments.
2.3 Generally BAL agrees that the draft vision is appropriate. In particular the need to ensure that mineral development is concentrated in locations that offer the greatest level of accessibility to major markets and growth areas.
QUESTION 2. What do you think of the draft strategic policy?
3.1 Generally BAL agrees with the strategic issues, in particular securing a spatial pattern of mineral development that efficiently delivers resources to markets within and outside Nottinghamshire.
QUESTION 3. What do you think to the draft strategic policy for minerals provision?
4.1 BAL object to this policy firstly on the basis that priority should not be given to the extension of existing sites where this would lead to a skewed geographical distribution of mineral production resulting in aggregate having to be transported longer distances and/or imported from surrounding counties. This is particularly the case in Nottinghamshire where there is strong demand in the south of the County and where the main sites of the previous MLP are worked out thus limiting the opportunity for extensions to just one small quarry (see below for further justification in respect of this issue).
4.2 BAL also object to the policy not including reference to giving priority to sites where non road transport, particularly the use of the River Trent, is proposed. This is particularly important as the ability to barge material is given priority in other policies and site selection.
Question 4. What do you think of the draft strategic policy for biodiversity led restoration?
5.1 BAL supports this policy.
Question 5. What do you think of the draft strategic policy for climate change?
6.1 BAL supports this policy but would wish to see the inclusion of non road transport methods in the criteria which will assist in delivering the policy.
Question 6. What do you think of the draft strategic policy for sustainable development?
7.1 BAL supports this policy.
Question 7. What do you think of the draft strategic policy for the built, historic and natural environment?
8.1 There is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
Question 9. What do you think of the draft strategic policy for Mineral Safeguarding Consultation Areas and associated minerals infrastructure?
9.1 BAL supports the policy, in particular the safeguarding of Colwick Wharf although its location and designation could be made clearer on Plan 4.
Question 10. What do you think of the draft policy approach towards aggregate provision?
10.1 We object to the draft approach being taken .National Policy in relation to planning for future aggregate demand is to be found in NPPF. For an MLP to be found sound1 it is necessary for it to be
* Positively prepared
* Justified
* Effective
* Consistent with national policy
10.2 The assessment of need on which the County bases its MLP is an essential component of this process as follows. For the plan to be positively prepared it must look forward on the basis that proposed development as set out in other plans and proposals will come forward and that need must be met through adequate allocation of resources in the MLP. This requirement must also be met for the MLP to be justified and effective.
10.3 The requirement for the MLP to be consistent with national policy in relation to assessing need and in particular the calculation of an adequate landbank requirement for an MLP can be found in the NPPF as follows2
* Preparing an annual Local Aggregates Assessment (LAA) based on a rolling average of 10 years sales data and other relevant local information.
Ensuring that large landbanks bound up in a very few sites do not stifle competition.
10.4 It is clear from the NPPF that the 10 year rolling average should be a starting point and that other local factors should be taken into account. National Planning Practice Guidance gives advice as to what local factors should be taken into account. The guidance is that relevant local information used should be that which seeks to look ahead rather than just relying on past sales. The guidance goes onto advise that such information may include levels of planned construction and house building in the local area but also " throughout the country" 3
10.5 The Planning Officers Society in conjunction with the Mineral Products Association have also produced useful practical guidance in assessing need and in particular what sort of local information should be used in considering the adequacy of the 10 year rolling average. These include4:-
* Geological resources being exhausted
* Trends and forecasts of population change including information in Local Plans on house building.
* Validated data on aggregate use in construction provided by the MPA.
* Planned major infrastructure projects including those within the County and 30 miles beyond as detailed in the National Infrastructure Plan 2016-2020. Also those projects included in Local Economic Partnerships Growth Deals and Strategic Economic Plans together with construction projects identified in District and Unitary Authority's infrastructure Development Plans. Planned highway improvement and maintenance works should also be considered.
* Local Regional and national economic forecasts from various sources.
* Information from the minerals industry on the availability of marine materials.
* Major new sources of recycled or secondary material becoming available.
* New environmental constraints being identified in aggregate producing areas or in proximity to them.
10.6 In looking at the appropriateness of the rolling 10 year average as the basis for calculating future demand it is essential that the veracity of the information is examined forensically. In particular are there any factors which have influenced the data such that it does not truly reflect the production of aggregate in the County to the extent that it cannot be relied upon to predict future need. In terms of the basis of a future MLP will it result in a plan which is not justified or effective in terms of whether the plan is sound.
10.7 Geological resources being exhausted and the issue of Finningly Quarry. Finningley Quarry is situated on the northern border of Nottinghamshire where is abuts Doncaster. It should be noted that the latest Nottinghamshire LAA (Oct 2017) advises that the annual production figures for the County have been affected by production at Finningley moving across the border into some of the years covered by the latest 10 years of production5. If this situation were to continue to operate in the future, that is production moving in and out of the County then its inclusion in the 10 year rolling average would be a sound basis for predicting future need. However, the Notts LAA advises6 that the reserves in both Doncaster and Rotherham (also referred to as South Yorkshire) are extremely limited and future supplies will be coming from Nottinghamshire, in particular the quarry at Sturton le Steeple which has permitted reserves.
10.8 This being the case it is necessary to look at the impact Finningley Quarry moving across the border has had on the last 10 years production in Nottinghamshire. This can be done by looking at the Doncaster and Rotherham LAA. Whilst individual quarry production is confidential the explanation below Table 1 makes it clear that production decreased in 2010 from 0.5MT to 0.16MT probably due to production at Finningley moving across the border into Nottinghamshire. Looking at Table 1 production from 2006 to 2015 was either 0.4/5MT or 0.14/5/6MT which indicates that at the higher levels production at Finningley was in Doncaster and at the lower levels it was in Nottinghamshire. Consequently from Table 1 we can deduce which years there would have been a shortfall in the Finningley contribution to the Nottinghamshire landbank and we can calculate the annual difference this will make by averaging the higher and lower figures and subtracting the lower from the higher. The difference is calculated as 0.3MT (0.45MT less 0.15MT).
10.9 The Nottinghamshire 10 year rolling average for sand and gravel is based on the years 2007 to 2016 whilst the Rotherham and Doncaster LAA is based on 2006 to 2015. However the Notts LAA does advise that in 2016 production in Finningley was across the border in Doncaster. This means it is possible to estimate the amount of the shortfall in the Nottinghamshire 2007 to 2016 production figures attributable to production at Finningley being in Doncaster. The calculation is based on the table below.
10.10 The 10 year rolling average if being used to predict future requirement in Nottinghamshire should now be calculated using 10 years annual production which includes the Finningley missing years as detailed above. That requires an addition 1.5MT to be added to the 17.04MT to give 18.54MT and results in a 10 year average annual sales of 1.85MT compared with the County's calculation of 1.70MT. The contribution of Finningley Quarry to the landbank is clearly a significant local factor which should be taken into account in using the 10 year rolling average as the basis for predicting future need.
10.11 Population Change and house building. The second local factor which needs to be taken into account in reviewing the 10 year rolling average is house building rates in the County and what is now planned. The County's latest LAA (October 2017, December 2016 data) sets out the planned house building rates for the individual planning authorities in the County. It is important to note that these are not maximum rates but are those which have been rigorously tested through the Local Plan processes including Strategic Housing Market Assessments and in some cases full Independent Examination procedures. It is also important to note that the Local Plans on which these house building rates are based were using pre 2014 Office of National Statistic (ONS) data. The 2014 when applied to the districts in Nottinghamshire will invariably lead to an increase in requirement. Consequently the impact of the planned house building rates should be considered as a minimum on which aggregate requirement should be based.
10.12 At Appendix 1 is a Table 2 which shows the house building rates for the local planning authority areas in Nottinghamshire over the 10 year period covering that being used by the County for the 10 year rolling average. The information contained within Table 2 has been taken from the Annual Monitoring Reports and other documents produced by the LPAs. The extracts from these documents can also be found at Appendix 1.
10.13 From Table 2 it can be seen that the average annual house building rate per LPA area over the past 10 years has been 351 units per annum. This figure is directly comparable with the average annual sand and gravel production rates calculated from the past 10 year's production. Table 2 uses the future house building rates deduced by the County in the October 2017 LAA7 to show that the average future rate will be 571 dwellings per annum. This is an increase of 220 dwellings per annum and represents a 63% increase. It is essential that this increase is taken as the minimum as it is based on solid evidence, it is not stated as a maximum so may be exceeded and is likely to be an underestimate based on the 2014 ONS data and the latest government advice that house building must increase. The population of Nottinghamshire including the County is expected to grow from 1.13 million in 2016 to 1.25 million in 2036. This growth will require at least the planned house building detailed on Table 2 which is based on the lower pre ONS 2014 estimates and it should be noted that as house building picks up following the recession the annual average rate per authority has already reached 468 dwellings per annum (2015/6) which is 81% of the planned annual requirement.
10.14 Validated data on aggregate use in construction is provided by the MPA. The October 2017 LAA references the use of aggregates in house building as being 20% of total production. Although it should be noted that at the recent examination into the Oxfordshire MLP 35% was used. It should be noted that house building requires significant support construction such as local roads, schools, village halls etc.
10.15 Planned major infrastructure projects. The October 2017 LAA notes that no further major infrastructure projects have been identified since the production of the previous LAA (January 2017). However, the January 2017 LAA was based on significantly higher rolling 10 year average taking into account partly pre recession construction levels and, therefore, capturing higher level of construction. With the move to the most recent 10 year rolling average this is no longer the case and the LAA needs to recognize that planned infrastructure for the future is significantly higher than accounted for by the 10 year rolling average which now almost solely covering a recession period when infrastructure projects were virtually non-existent. An adjustment to the 10 year average which determines the future landbank needs to be made in order for the MLP to be based on realistic future aggregate need.
10.16 Infrastructure identified in the National Infrastructure Delivery Plan 2016 to 2021 for the Nottinghamshire area is:-
* Midland Main Line. Further electrification to Nottingham.
* East Coast Mainline. Station, signaling and track works to facilitate longer new Super Express Trains.
* HS2.
It should be noted that the time period for this infrastructure plan is just 5 years and represents only 16% of the MLP plan period. Also included in the plan is reference to the Midlands Engine and the proposal for carrying out feasibility studies in respect of upgrades to the M1 and Smart motorway improvements together with improvements to the A46 Newark bypass and its intersection with the A1.
10.17 The Local Enterprise Partnership D2N2 (covering Nottingham and Derby and parts of both counties) has produced a programme which includes a target to create 50,000 jobs and to build 77,000 dwellings. The dwellings are included in Local Plans but D2N2 are intending to ensure that infrastructure delivery does not frustrate the building of the dwellings.
10.18 East Midlands airport which lies alongside the HS2 route is planning to increase from 4.3 to 10 million passengers and 300,000 to 700,000t of freight by 2040. The majority of this development will occur in the MLP plan period. A major freight terminal is also planned for the M1 j23a/24. Whilst this is in Leicestershire it lies within the 30 mile zone beyond the County boundary which the POS/MPA advice considers should be included in any future assessment for aggregate provision within a County.
10.19 Local regional and national economic forecast. The latest MPA forecasts (February 2019) suggest that aggregate demand will have increased by 19% by 2019 compared to 2015. Infrastructure growth is expected to be 56% from 2015 to 2019. In the longer term replenishment rates for sand and gravel show that for every 100 tonnes of material used planning permissions for replacement accounts for only 56 tonnes indicating that in the future shortages of supply will be apparent.
10.20 Availability of marine materials. Nottinghamshire is a landlocked county and some distance from any marine sourced aggregate landing facility. Consequently the material is not used in the County.
10.21 Major new sources of recycled or secondary material. For Nottinghamshire inert waste processing (considered suitable for recycled aggregate production) has now recovered to pre recession rates. However, whilst power station ash is capable of being substituted for primary aggregates the 3 coal fired power stations within the County are all planned to be closed by 2025. It would, therefore, be unwise to rely on any further increase in recycled output and in fact a reduction in availability of this material should be planned.
10.22 New environmental constraints. No new environmental constraints which could restrict aggregate extraction in the County have been identified. Locally the ban on extraction in the Peak District National Park has been accounted for by Derbyshire planning to increase production in the rest of the County by an amount equivalent to that to be lost through lack of production in the National Park.
10.23 It is apparent from the above information that there are a number of factors pointing to the need to modify the rolling 10 year average if a robust prediction of future need is to be made. The evidence is that the figure will need to be increased on the basis that during the MLP period more aggregate will have to be exported to South Yorkshire, a greater number of dwellings will be built, more jobs created and more infrastructure built. Of these elements it has been possible to quantify numerically only the impact of the increase in future exports to South Yorkshire and house building rates. House building is considered to represent the use of only 20 to 35% of the total supply of aggregate. However, house building is a key component in providing dwellings for new employees who will occupy newly constructed factories and commercial premises. House building also drives infrastructure provision including roads, such as those around Newark, schools, hospitals etc. lt is, therefore, proposed that the house building rates of the past 10 years be compared with aggregate use of the same period and then used to predict future aggregate requirement.
10.24 Taking the 1.85MTPA (10 year rolling average modified to take account of the Finningley Quarry production changes within the County) is comparable with an 10 year rolling average house building rate of per local authority (including Nottingham City) of 351 dwellings per annum. The future house building rate is 572 dwellings per annum. This is an increase of 63% and will require a similar increase in aggregate production going forward. This requires that the 10 year rolling average be increased by 63% (1.63 x 1.85) to 3.02MT.
10.25 In order to fully understand why Nottinghamshire has failed to increase its annual production of aggregate to that approaching its pre recession rates it is useful to look at the 10 year production rates for the counties making up the East Midlands AWP area. Table 3 shows figures taken from the LAAs for these counties. The East Midlands in 2016 had reached 70% of its pre recession production rate. Three counties were at around pre recession levels with two counties actually producing more. Lincolnshire is now producing 64 % of its pre recession level but Nottinghamshire is only at 40%. It is clear that lack of production in Nottinghamshire is holding back the East Midlands in reaching pre recession production levels. This assessment supports the need to increase the proposed landbank above that which would result from using the rolling 10 year landbank as the basis for future need prediction and this should be 3.02MTPA to give a required landbank for the plan period ( 2017 to 2036) of 57.38MT.
Question 11. What do you think of the draft site specific sand and gravel allocations?
11.1 The Draft MLP states that the site specific allocations are based on a consideration of five options which were narrowed down to two criteria on which the decision to allocate was based. Firstly, the need to have a geographical spread of sites across the County and secondly to prioritise locations with potential for transporting sand and gravel by river barge. BAL considers that this approach is appropriate.
11.2 The draft MLP is supported by A Draft site selection methodology and assessment document, July 2018, (Draft Site Selection Document)) and Draft Minerals Local Plan Sustainability Appraisal Interim Report, July 2018 (Draft SA). The Draft SA contains a detailed numerically based site assessment methodology and a numerical assessment of all the sites put forward. This is surprising because the draft MLP specifically excludes as one of the five options considered allocating sites based on their particular merits. The SA numerical assessment is then taken forward in the Draft Site Selection Document (Section 6) where the geographical spread of sites is stated as the main basis in determining which sites to allocate although this is not based on an objectively assessed need for each area. The ability of material to be transported by river barge is not given priority in the final site selection process.
11.3 BAL consider that it is necessary to maintain a geographical spread of quarries and permitted reserves across the County for two reasons. Firstly is the cost of transporting bulky materials relative to value that in respect of aggregates is low. This means that an appropriate geographic spread is important to ensure that the economy works effectively and additional costs are not unnecessarily incurred. It is also the case that for this reason proposed aggregate reserves should be matched geographically to where those reserves will be used. Secondly is the issue of environmental impact caused by HGV movements associated with aggregate transport.
11.4 Below Table 5 shows the current distribution of permitted reserves compared with spatial requirement for future house building. This is based on the information contained within the October 2017 LAA in respect of permitted reserves and Table 4 at Appendix 3 of this document.
The current distribution is not sustainable in terms of transportation of aggregate and the consequences for air quality and climate change. If extensions to quarries were to be preferred compared to opening up new sites this unsustainable distribution will continue. This is not in accordance with the NPPF guidance in respect of sustainable development.
11.5 In respect of the geographical distribution of aggregate production in the County Table 6 below shows the comparison between future house building in the three aggregate production areas identified by the County and the proposed geographical spread of aggregate production (permitted and proposed) in the draft MLP. There is a significant discrepancy between the two factors with 16% of the house building taking place in the Newark area whilst 46% of the aggregate reserves are planned to be here. In respect of Idle Valley (north Nottinghamshire) 18% of the house building for the County is planned to be here but 36% of the aggregate reserves are proposed in the draft MLP. Meanwhile in the south of the County where 56% of the house building is planned only 18% of the aggregate reserves are proposed in the MLP.
11.6 Taking into account the information in Table 6 it is surprising that the Shelford site (located in the South) was dismissed as a proposed allocation in the draft MLP solely on the basis that to allocate such a large site (6.5MT) in the south would skew the geographical distribution whilst factually Shelford should be allocated to maintain the correct geographical spread of allocated and permitted reserves in the County.
11.7 Even if the limited landbank proposed by the County is accepted (BAL object to the limited landbank, see above) in order to meet the objective set out under policy MP2 of having a geographical spread and meeting the requirement for the plan to be "justified" more aggregate should be allocated in the south and less in the north. This can be achieved within the limited landbank put forward by deleting Botany Bay and Mill Hill (or alternatively one of the proposed Newark sites) as new allocations and substituting Shelford. This has the added benefit of meeting the second MP2 site selection criteria which is "potential for transporting sand and gravel by river barge" and with which Shelford is the only site complying. Furthermore, the allocation of Shelford would lead to a better commercial balance of supply than is currently, and proposed to be, the case by introducing a new operator into the County. This will ensure that the plan is sound with respect to NPPF para 207 (g).
11.8 The correct geographical distribution of aggregate resources proposed in the draft MLP is important because of the impact of moving mineral within the County and bringing mineral in from surrounding counties if the distribution does not match planned development. The above analysis has used house building as a marker because the level of house building reflects where jobs are to be created and consequently commercial development, local infrastructure and major infrastructure. Much of the infrastructure identified above in relation to the landbank assessment will take place in the south of the County and includes East-Midlands airport expansion, HS2, works to the Nottingham railway line etc. The consequences of not sourcing mineral close to where it is needed are that more miles are travelled by HGVs transporting the mineral. This has a negative impact on air quality and in the long run climate change.
11.9 The air quality and climate consequences have been assessed with respect to HGV movements associated with the proposed Shelford Quarry and those at Newark in the attached (Appendix 4) RPS document. This gives an indication of the problems associated with having a poor geographical distribution of mineral resources in the County.
11.10 In respect of Shelford and the site assessment which has been undertaken BAL have been surprised that a site which was assessed as scoring well under the previous, now withdrawn MLP, has now scored somewhat poorly. Whilst this has not led to officers proposing not to allocate the site which as set out above was solely on the basis of geographical spread of sites the documents underpinning the scoring have been analyzed and series of reports prepared.
Previously the County scored the Shelford site as -6 during the operational phase and 0 in the post operational phase. In the current SA the site is scored -10 in the operational phase and -1 in the post operational phase. Although it should be noted that the summation of the actual SA scores results in a total +2 for the long term.
11.11 BAL has commissioned reports on the various areas of the assessment where it is considered that discrepancies have arisen. It should be noted that since the previous site assessment BAL have undertaken significant work with respect to the site with a view to submitting a planning application. This work was halted when the previous MLP in which Shelford was allocated was withdrawn. However, that work is recent and remains relevant. Some of it has been taken into account in the assessment, in particular that in respect of the historic environment. However, other work, in particular with regard to ecology and hydrology has not been taken into account. Reports in respect of Landscape, hydrology, ecology and transport are attached as appendices.
11.12 The completion of the surveys and other work at Shelford mean that the deliverability of the site can be assured. In the site assessment process the County have determined that Shelford is deliverable. This is an important factor in determining the soundness of the plan.
11.13 Below is a table showing a comparison of the scoring for the Shelford site in the current SA and that as assessed by BAL. Below the table is an explanation in respect of each topic.
Biodiversity. The operational phase score has been downgraded to reflect that the site will be worked wet so there will be no disturbance to the hydrology of the nearby locally designated wildlife sites.
Landscape. This aspect of the assessment has shown the most significant change in scoring for the site changing from -2 to -3 during the operational phase but most surprising changing from -1 to -3 in the long term. The BAL landscape assessment analysis has found that the approach adopted by the County does not allow for an area to be not typical of its character area nor the possibility that positive impacts are possible where a landscape is sensitive to change. In particular the County's landscape analysis fails to understand that the course of the Trent has changed at Shelford, the river now runs through a highly engineered channel and the flood defences along the river have allowed intensive agriculture with large scale arable fields predominating. The mineral extraction provides a significant opportunity to reintroduce the water meadows adjacent to the village and overall a water environment which reflects the historic landscape context. This is a positive aspect of the restoration which is not reflected in the -3 for the long term score.
Flooding. Whilst designing the final restoration scheme for the site initial flood modeling was carried out to see whether flood defences adjacent to the river (these are secondary to those adjacent to Shelford village) could be removed to allow the reconnection of the floodplain. Unfortunately only partial realignment of the flood defence is possible because the flood modeling has shown that under various scenarios the Shelford land and its defences acts to reduce the impact of flooding further downstream. This work has shown that the site can be worked without increasing risk of flooding and in fact during the operational stage there will be an opportunity to improve the defences adjacent to the village. The operational score has been increased to reflect the work carried out and the potential to reduce the risk of flooding during the operations phase.
Climate change. Shelford is the only site where river barging is proposed. This will produce a positive impact from one third of the material being transported in a way that has less impact on climate. The operational score has been amended accordingly.
Efficient use of land. Previously the site assessment viewed larger sites as being more efficient as lots of smaller sites require numerous processing and other plant. This is still the case and the score has been amended accordingly.
Energy efficiency. One third of the material at Shelford will be transported by barge which is a significantly more energy efficient than road transport. The score has been amended accordingly.
Air quality. One third of the material at Shelford will be transported by barge which will result in less pollution than if that volume of material came from a site where only road transport were to be able. The score has been amended accordingly.
Water Quality. It is proposed that there will be no dewatering when the site is worked and there will be no imported material brought into the site consequently the risk to water quality is low and the score has been amended to reflect this.
Human health and quality of life. During the operational phase of the site it will be possible to open up permissive paths and the potential to improve the Shelford village flood defences together with the creation of the water meadows. The operational score has, therefore, been amended.
12 Question 24. What do you think of the draft policy wording for DM3: Agricultural land and soil quality?
12.1 As stated above there is a tension between the policy in respect of the effect on Best and Most Versatile Land (BMVL) and the biodiversity led restoration proposals which underpin the Plan. This is highlighted at para. 3.60 where reference is made to the ability to safeguard best and most versatile "soils" rather than land. It would be appropriate if this distinction were also to be made in the policy wording in order to avoid the conflict between the wetland restoration proposals and the preservation of BMVL.
13.What do you think of the draft policy wording for DM5: Landscape character?
12.1 BAL objects to the wording of this policy the first part of which would prevent any mineral development coming forward. It need to include the words "....will not cause unacceptable harm to the character...." Rather than " ...........will not adversely impact on the character .........."