Comment

Draft Nottinghamshire Minerals Local Plan

Representation ID: 30955

Received: 22/09/2018

Respondent: Greenfield Associates

Agent: Greenfield Associates

Representation Summary:

Policy SP5 makes no link between river barge/ rail transport and need for a wharf or rail siding that will be required to off-load and process material. The wharf/ siding then becomes a "shadow quarry" operation where HGV's will then transport the minerals to the point of use. Within Nottingham (the main market) there are no available river wharves or rail sidings suitable for these operations.
The principle of locating sites as close to market is the most sustainable transport solution at the present time for the period of the plan.

Full text:

Policy SP5 makes no link between river barge/ rail transport and need for a wharf or rail siding that will be required to off-load and process material. The wharf/ siding then becomes a "shadow quarry" operation where HGV's will then transport the minerals to the point of use. Within Nottingham (the main market) there are no available river wharves or rail sidings suitable for these operations.
The principle of locating sites as close to market is the most sustainable transport solution at the present time for the period of the plan.