Draft Nottinghamshire Minerals Local Plan
Representation ID: 31021
Received: 27/09/2018
Respondent: Aggergate Industries
Representation Summary:
There is a deficit of mineral production of 30,000-220,000tpa throughout the plan process based upon existing 10 average sales.
Additional sites are required during the plan period to ensure a steady supply of mineral
Full text:
There is a deficit of mineral production of 30,000-220,000tpa throughout the plan process based upon existing 10 average sales.
Additional sites are required during the plan period to ensure a steady supply of mineral