Draft Site Selection Methodology
Ends on 9th November 2026 (22 days remaining)
2. Background information
2.1To enable the Councils to decide which sites should be allocated in the Plan, a site selection methodology is required. Before running the call for sites exercise, which we anticipate occurring in early 2027, we wish to seek your views on a draft site selection methodology we have developed.
2.2This draft methodology has been based upon:
- The adopted Nottinghamshire Minerals local Plan site selection methodology
- Guidance on site selection[1]
2.3How these have both shaped this draft methodology is detailed below.
Adopted Minerals Local Plan site selection methodology
2.4The approach used for the adopted Plan was based on five stages:
- Stage 1: Identifying the level of need for minerals over plan period
- Stage 2: Issuing a call for sites
- Stage 3: Testing the deliverability of sites
- Stage 4: Strategic assessments, consultees and technical studies of sites
- Stage 5: Ensuring a geographic spread of sites
- Stage 6: Overall assessment and decision.
Guidance on identifying, assessing and selecting sites
- Stage 1 – identifying sites
- Stage 2 – assessing sites
- Stage 3 - determining draft allocations
- Stage 4 - confirming draft allocations and recording your decisions
Draft site selection methodology for Nottinghamshire Minerals Local Plan
[1] Introduction to identifying, assessing and selecting sites guidance published by MHCLG on the 26th of March 2026
For instructions on how to use the system and make comments, please see our help guide.
Share on:
