Skip to main content
Login
|
Register
Home
Minerals and Waste Local Plan Consultations
Pre- Submission Draft Waste Local Plan
Contents
Pre- Submission Draft Waste Local Plan
Ended on the 11th October 2023
Search representations
Search representations
Contents
Preface
1. Introduction
The new Waste Local Plan
Contact us
Alternative formats
2. Scope of the New Nottinghamshire and Nottingham Waste Local Plan
3. Context for Waste Planning
The Circular Economy
The Waste Hierarchy
National Policy
Local Policy
4. Overview of the Plan Area
Plan 1 – Plan Area
5. Waste Management in the Plan Area
Waste produced within the Plan Area
Forecasting future waste arisings in the Plan area
Existing Capacity within Plan Area
Future waste management methods
Assessing the need for additional waste management capacity
6. Our Vision and Strategic Objectives
Vision
Strategic Objectives
7. Strategic Policies
SP1- Waste prevention and re-use
SP1 – Waste prevention and re-use
SP2- Future Waste Management Provision
SP2 - Future Waste Management Provision
SP3- Broad Locations for Waste Treatment Facilities
SP3 – Broad Locations for Waste Treatment Facilities
SP4- Managing Residual Waste
SP4 – Managing Residual Waste
SP5- Climate Change
SP5 – Climate Change
SP6- Sustainable movement of Waste
SP6 – Sustainable movement of waste
SP7- Green Belt
SP7 - Green Belt
SP8- Safeguarding Waste Management Sites
SP8 – Safeguarding Waste Management Sites
8. Development Management Policies
DM1- General Site Criteria
DM2- Health, Wellbeing and Amenity
DM2 – Health, Wellbeing and Amenity
DM3- Design of Waste Management Facilities
DM3 – Design of Waste Management Facilities
DM4- Landscape Protection
DM4 – Landscape Protection
DM5- Protecting and Enhancing Biodiversity and Geodiversity
DM5 – Protecting and Enhancing Biodiversity and geodiversity
DM6- Historic Environment
DM6 – Historic Environment
DM7- Flood Risk and Water Resources
DM7 - Flood Risk and Water Resources
DM8- Public Access
DM8 – Public Access
DM9- Planning Obligations
DM9 - Planning Obligations
DM10- Cumulative Impacts of Development
DM10 - The Cumulative Impact of Development
DM11- Airfield Safeguarding
DM11 - Airfield Safeguarding
Plan 2 – Airfield Safeguarding Areas
DM12- Highway Safety and Vehicle Movements/ Routeing
DM12 - Highway Safety and Vehicle Movements/Routeing
9. Monitoring and Implementation
Implementation
Monitoring
Appendix 1- Monitoring and Implementation Framework for Nottinghamshire and Nottingham Waste Local Plan
10. Useful Information
11. Glossary
Next Page >>
Contents
Preface
1. Introduction
2. Scope of the New Nottinghamshire and Nottingham Waste Local Plan
3. Context for Waste Planning
4. Overview of the Plan Area
5. Waste Management in the Plan Area
6. Our Vision and Strategic Objectives
7. Strategic Policies
8. Development Management Policies
9. Monitoring and Implementation
10. Useful Information
11. Glossary
Next Page >>
For instructions on how to use the system and make comments, please see our
help guide
.
back to top
back to top
Powered by
Site map
|
Accessibility
|
Privacy
|
Cookies