Scoping Document

Ends on 9th November 2026 (22 days remaining)

2. Proposed layout of the new Nottinghamshire Minerals Local Plan

Introduction

2.1As outlined above, one of the key things we want to seek views on is what the new Nottinghamshire Minerals Local Plan should contain. We recognise that this will look different to the current adopted Plans due to the new National Planning Policy Framework (NPPF) (2026) which introduces new plan - making policies that set out what Plans should include, as well as national decision-making policies which are not to be duplicated by local plans.

2.2This chapter explains how the Councils have considered the new policies introduced by the NPPF and the current adopted Minerals Local Plan to inform what the new Plan should contain and a potential future layout.

Changes to National Planning Policy Framework

2.3Part of the wider changes to plan - making includes the Government introducing national decision-making policies, which all applications will be determined against. The Government published these policies alongside plan-making policies in the latest NPPF in August 2026. We have considered the plan-making and decision - making policies to identify what the new Plan should contain, which is outlined below.

Plan – making policies

2.4The plan - making policies within the NPPF outline what Local Plans should address and cover, with procedural policies provided in chapter 2 and topic policies covered in each chapter. Table 1 below highlights the key policies and their requirements for the new Minerals Plan.

Table 1: Key Plan-making policies and their requirements relating to what the minerals plan should contain.

NPPF Policy

Summary of policy requirements for Plans

PM2: Local Plans

  • Set out a positive vision which is supported by no more than 10 measurable outcomes
  • Set out a spatial strategy
  • Include policies for the minimum amount of development to be provided
  • Policies for land allocations and broad locations for growth
  • Include other policies that support the delivery of allocated sites
  • Plan for a minimum of 10 years from the year of adoption
  • Include other policies that address local issues

PM3: Minerals and Waste Plans

  • Set out specific proposals to facilitate a sufficient supply of minerals to meet need
  • Preparation should accord with PM2, apart from identifying contributions to affordable housing

PM6: General principles for plan-making

  • Only include policies that are necessary and relevant to the Plan being prepared, avoiding duplication of other parts of the development Plan
  • Only include policies which go beyond site specific requirements were justified
  • Must not duplicate or restate national decision-making policies within the NPPF or include policies which are inconsistent with them

S1: Positive plan-making

  • Meet the development need of the area
  • Provide development and improvement of the environment which promotes a sustainable pattern of growth and seeks to mitigate climate change and adapt to its effects.

M1: Planning for a sufficient supply of minerals

  • Identify provision needed in the Plan area
  • Allocate sites and/or identify preferred areas to maintain provision and landbanks for aggregates and industrial minerals
  • Plan for the three phases of oil and gas development
  • Develop policies that consider the contribution of secondary and recycled aggregates

M2: Safeguarding mineral resources and infrastructure through plan-making

  • Define mineral safeguarding and consultation areas
  • Safeguard existing, planned and potential sites for:
    • Bulk transport, handling and processing of minerals
    • Manufacturing of concrete and concrete products
    • The handling, processing and distribution of substitute, recycled and secondary aggregate material.

Question 1: Have we missed any other key plan - making policies within the NPPF that are relevant to the overall content of the new Minerals Plan? Comment

2.5From these national plan-making policies, we have identified a basic outline of what the Plan should contain:

  • A vision and measurable outcomes
  • A spatial strategy
  • Policies on future mineral need, including site allocations and site-specific policies
  • Mineral safeguarding policy
  • Local policies

2.6Further detail on what these chapters may contain to comply with the NPPF are detailed in the following chapters.

2.7Also, it should be noted that as per Policy PM2, we intend for the Plan to cover a 15 – year period, from 2029 to 2045, which is beyond the 10 – year minimum period. This is because we want to recognise that mineral developments are often longer-term developments which would benefit from a Plan that covers a 15 – year period. As per the regulations, the Plan will be updated every 5 years.

Decision - making policies

2.8Decision - making policies are also provided for both procedural and topic areas and together they form the national decision - making policies which all applications will be determined against.

2.9Clause 1(c) of Policy PM6: General Principles for plan - making in the NPPF is clear that local plans should not duplicate national decision - making policies. As stated in clause 1(b), only policies which extend beyond site allocations should be included where necessary and there is clear and justified reason for including them.

2.10To understand whether there are any local policies that need to be included, we have assessed the policies within the current adopted Minerals Local Plan policies to understand if these duplicate national decision - making policies or not. This assessment is detailed below.

Assessment of the adopted Minerals Local Plan

2.11Alongside consideration of the NPPF policies, we have also assessed the current adopted Nottinghamshire Minerals Local Plan to help inform the potential layout and content of the new Plan.

2.12We have assessed the Plan and its policies against:

  • Performance since the Plans adoption and how it has been applied to planning decisions
  • Changes in local context and policies since the Plans adoption
  • Changes to national policy since the Plans adoption, including the NPPF.

2.13Appendix 1: Assessment of adopted mineral policies against the NPPF, provides a summary of our assessment of the current policies against the NPPF. It notes which policies are now duplicating the national decision – making policies, thus are no longer needed, as well as identifying which elements of the adopted policies are still required. This assessment has helped identify the proposed layout of the Plan and what each chapter should potentially contain. In particular it has helped identify what local policies the Plan may need to contain.

Proposed layout of the Plan

2.14By considering the new NPPF and the assessment of the current policies within the Minerals Local Plan, we have identified the following potential layout for the new Minerals Plan:

  • Context of the Nottinghamshire Minerals Local Plan
  • Vision and measurable outcomes
  • Spatial strategy for minerals development
  • Future mineral need and provision, which includes
    • Policies identifying the amount of mineral needed
    • Policies identifying site allocations to meet the identified need
    • Policies for site specific allocations
  • Safeguarding mineral resources and infrastructure
  • Local policies on any relevant matters
  • Monitoring of the Plan

2.15What each of these sections could potentially contain is outlined in the following chapters and we want to hear from you about key matters and issues on these areas. We have asked specific questions on the content and issues within each chapter and welcome your views and feedback on these.

2.16Please note that the structure, content and spatial strategy are not set in stone at this point. We will consider your feedback from this consultation and any further guidance that is issued by the Government to determine the final plan content. You will be able to comment on the plan content, which will include a draft vision, spatial strategy and potentially draft policies at the next consultation stage.

Question 2: Do you agree with the general content and layout for the Plan? Please let us know if you think anything else needs including, providing an explanation as to why it should be. Comment

For instructions on how to use the system and make comments, please see our help guide.