Scoping Document

Ends on 9th November 2026 (22 days remaining)

Appendix 1: Assessment of adopted mineral policies against the NPPF (2026)

Nottinghamshire Minerals Local Plan (adopted March 2021)

Spatial Policies

Adopted Policy reference

Adopted Policy name

Addressed through NDMP?

If yes, which NDMP?

If no, where is this issue addressed in the new Plan?

Notes

SP1

Minerals Provision

No

Spatial strategy

No specific policy required but proposed to be set out in the spatial strategy on how Plan will meet mineral need.

SP2

Biodiversity – led restoration

Partly

N1

Spatial strategy

SP2 seeks for restoration to be biodiversity led. Whilst partly reflected in NDMP N1, this preference for biodiversity led restoration can be reflected in the spatial strategy.

SP3

Climate change

Yes

CC2 and CC3

No specific policy required for climate change, but climate change can be embedded into the spatial strategy and site selection methodology to address plan – making policy CC1.

SP4

Sustainable transport

No

Spatial strategy

Propose that the spatial strategy promotes the use of sustainable transport methods for transporting minerals and this used within the site selection methodology. This addresses TR1.

SP5

The built, historic and natural environment

Yes

F4 – F9, N2 - N6, HE4 - HE11

Site selection methodology

Impacts on the built, historic and natural environment are addressed through NDMPs. However, through the site selection methodology the Plan will seek to allocate sites which meet the Plan – making policies of the NPPF (F1, F2, N1, HE2 and HE3)

SP6

The Nottinghamshire green belt

Yes

GB6 – GB8

Green belt boundaries will be defined in Local Plans and so Plan – making policies GB1 – GB5 are not applicable to the minerals plan.

SP7

Minerals Safeguarding, Consultation Areas and Associated Minerals Infrastructure

Partly

M6

Safeguarding mineral resources and infrastructure chapter

NDMP M6 covers off certain aspects of Policy SP7 however plan – making policy M2 requires Plans to identify mineral resources and infrastructure to be safeguarded. This will be addressed in a separate chapter which will contain the relevant policies.

Mineral provision policies

Adopted Policy reference

Adopted Policy name

Addressed through NDMP?

If yes, which NDMP?

If no, where is this issue addressed in the new Plan?

Notes

MP1

Aggregate provision

No

Future mineral need and provision

Future aggregate demand will be outlined in policies for sand and gravel, Sherwood sandstone and crushed rock.

MP2

Sand and gravel

No

Meeting demand for sand and gravel

Meeting the identified need for sand and gravel will be addressed through site allocations in the future mineral need and provision chapter.

MP3

Sherwood sandstone

No

Meeting demand for Sherwood sandstone

Meeting the identified need for Sherwood sandstone will be addressed through site allocations in the future mineral need and provision chapter.

MP4

Crushed rock (limestone)

No

Meeting demand for crushed rock

Meeting the identified need for crushed rock will be addressed through site allocations in the future mineral need and provision chapter.

MP5

Secondary and recycled aggregates

Yes

M1 and M3

Clause 6 of Policy M1 requires substitute, recycled and secondary aggregates to be considered when determining supply. This will therefore be considered within each mineral policy in the future mineral need and provision chapter.

NDMP M3 also notes that importance should be given to processing secondary aggregates sites where this can help reduce the need for new extraction. This alongside the other NDMPs duplicated MP5 and so a policy is no longer required.

MP6

Brick clay

No

Establishing and meeting demand for brick clay

The need for brick clay over the Plan period and how this will be met will be addressed through policies in the brick clay section of the future mineral need and provision chapter.

MP7

Gypsum

No

Establishing and meeting demand for gypsum

The need for gypsum over the Plan period and how this will be met will be addressed through policies in the gypsum section of the future mineral need and provision chapter.

MP8

Silica sand

No

Establishing and meeting demand for silica sand

The need for silica sand over the Plan period and how this will be met will be addressed through policies in the silica sand section of the future mineral need and provision chapter.

MP9

Industrial dolomite

No

Establishing and meeting demand for industrial dolomite

The need for industrial dolomite over the Plan period and how this will be met will be addressed through policies in the industrial dolomite section of the future mineral need and provision chapter.

MP11

Building stone

No

Establishing and meeting demand for building stone

The need for building stone over the Plan period and how this will be met will be addressed through policies in the building stone section of the future mineral need and provision chapter.

MP11

Coal

Yes

M5

Plan – making policy M1 of the NPPF is clear Plans should not allocate new sites or extensions for coal extraction. NDMP Policy M5 will be the applicable policy is any application for coal comes forward.

MP12

Oil and gas

No

Oil and gas

Plan – making policy M1 of the NPPF requires Plans to distinguish between and plan for the three phases of development within licenced areas. Sites can also be allocated providing they are within a licenced area.

Development Management Policies

Adopted Policy reference

Adopted Policy name

Addressed through NDMP?

If yes, which NDMP?

If no, where is this issue addressed in the new Plan?

Notes

DM1

Protecting Local Amenity

Yes

M4, P3, P6

DM2

Water Resources & Flood Risk

Partly

F4 – F9

Spatial strategy

Whilst NDMPs F4 – F9 cover most of Policy DM2, it does not recognise that minerals can provide flood alleviation and storage. This benefit is proposed to be addressed through the spatial strategy. Plan – making policies F1 and F2 will be addressed through the site selection process.

DM3

Agricultural Land & Soils

Partly

N2 and P1

Local policies

The NDMPs do not recognise that mineral development is phased and temporary, meaning impacts on soils and agricultural land can be mitigated in different ways. A local policy will therefore be included which addresses this.

DM4

Biodiversity & Geodiversity

Partly

N6

Local policies

Policy DM4 is largely duplicated NDMP N6 and so no longer is required, the NDMP would not protect the Sherwood Forest ppSPA as it is not designated. A local policy is therefore proposed to address this local issue.

DM5

Landscape Character

No

Local policies

NDMP N4 focuses on protected landscapes only and does not address local character and distinctiveness of the local landscape. A local policy is therefore proposed to address this issue.

DM6

Historic Environment

Partly

HE4 – HE11

Local policies

Policy DM6 now largely duplicated NDMPs HE4 to HE11. However, clause 6 of Policy DM6 protects a local archaeological resource area that would not be protected under the NDMP’s. It is therefore proposed this is addressed through a local policy.

DM7

Public Access

Yes

TR8

DM8

Cumulative Impact

Yes

M4

DM9

Highways Safety & Routeing

Partly

TR6

Local policies

NDMP TR6 largely addresses the issues covered in policy DM9, however it does not address mineral specific issues such as vehicle routeing or measures to prevent mud on the highway. These issues will therefore be covered by a local policy.

DM10

Airfield Safeguarding

Yes

M4

The policies map will need to show the location of airfields in Nottinghamshire and their safeguarding area to ensure aviation safety.

DM11

Planning Obligations

DM6

DM12

Restoration, After-use, Aftercare

Partly

M4

Local policies

NDMP M4 covers the main thrust of Policy DM12, to ensure restoration is to a high standard and delivered at the earliest opportunity, it does not cover the nuances of Policy DM12. These issues are therefore to be covered under a local policy which will connect to the spatial strategy.

DM13

Incidental Mineral Extraction

No

Local policies

Policy on incidental mineral extraction to be included in local policies chapter.

DM14

Irrigation Lagoons

No

Local policies

Policy on irrigation lagoons to be included in local policies chapter.

DM15

Borrow Pits

No

Local policies

Policy on borrow pits to be included in local policies chapter.

DM16

Associated Industrial Development

Partly

Local policies

Whilst any associated development would be subject to NDMPs, none require it to be linked to the life of the mineral site as Policy DM16 does. A policy covering this is therefore proposed in the local policies chapter.

DM17

Mineral Exploration

No

Local policies

Policy on mineral exploration to be included in local policies chapter.

Nottingham City Land and Planning Policies Development Plan Document, Local Plan Part 2 (adopted January 2020)

Adopted Policy reference

Adopted Policy name

Addressed through NDMP?

If yes, which NDMP?

If no, where is this issue addressed in the new Plan?

Notes

MI1

Minerals Safeguarding

Partly

M6

Safeguarding mineral resources and infrastructure chapter

NDMP M6 covers off certain aspects of Policy MI1 however plan – making policy M2 requires Plans to identify mineral resources and infrastructure to be safeguarded. This will be addressed in a separate chapter which will contain the relevant policies.

MI2

Restoration, after-use and after-care

Partly

M4

Local policies

NDMP M4 covers the main thrust of Policy MI2, to ensure restoration is to a high standard and delivered at the earliest opportunity, it does not cover the nuances of Policy MI2. These issues are therefore to be covered under a local policy which will connect to the spatial strategy.

MI3

Hydrocarbons

No

Oil and gas

Plan – making policy M1 of the NPPF requires Plans to distinguish between and plan for the three phases of development within licenced areas. Sites can also be allocated providing they are within a licenced area.