Nottinghamshire Minerals Local Plan Publication Version

Ended on the 11 October 2019

(1) Appendix 1: Delivery Schedules

Sand and gravel and Sherwood Sandstone delivery schedules

The delivery schedules set out the expected life of existing permitted quarries over the plan period and how the site allocations (extensions to existing permitted quarries and/or new green field quarries) will maintain output over the plan period.

Given the nature of extraction and the influence of future economic conditions, the figures set out in the schedules should only be used as an indicative illustration.

For a number of quarries two figures are stated. The forecasted figure relates to information supplied by the mineral operators through the call for sites process or the wider public consultation process. The permitted figures relate to the maximum output figures as stated in the relevant planning permission for the quarry.

Due to reasons of confidentiality, detailed annual sales data cannot be used on a site by site basis

Key to the following tables:

  • Existing sites are highlighted in light grey
  • Extensions to existing sites are highlighted in dark grey
  • New quarries are highlighted in black

Sand and gravel delivery schedule

Site (site code)

Output

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

2036

Idle Valley

Newington South (MP2a)

Forecasted

150

Finningley (MP2b)

Forecasted

0

Permitted

160

Sturton Le Steeple (MP2c)

Forecasted

50

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

Permitted

500

500

500

500

500

500

500

500

500

500

500

500

500

500

500

Bawtry Road (MP2d)

Permitted

40

40

40

40

40

40

40

40

Bawtry Road West (MP2k)

Forecasted

30

30

30

30

30

30

Scrooby South (MP2j)

Forecasted

40

40

40

40

40

Permitted

72

72

72

72

72

Scrooby North (MP2m)

Forecasted

40

40

40

40

40

40

40

40

40

40

40

40

40

40

Scrooby Thompson Land (MP2l)

Forecasted

40

20

Newark

Cromwell (MP2e)

Forecasted

200

200

200

200

200

200

200

200

200

100

Permitted

200

200

200

200

200

200

200

200

200

200

Besthorpe (MP2f)

Forecasted

150

150

200

Permitted

120

120

120

120

120

Besthorpe East (MP2o)

Forecasted

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

Girton (MP2g)

Forecasted

0

50

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

Permitted

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

Langford Lowfields (MP2h)

Permitted

450

450

450

450

450

450

450

450

450

250

Langford Lowfields North (MP2n)

Forecasted

200

450

450

450

450

450

450

450

450

450

Nottingham

Mill Hill near Barton in Fabis (MP2p)

Forecasted

280

280

280

280

280

280

280

280

280

280

280

280

East Leake (MP2i)

Permitted

180

180

180

180

180

180

180

180

180

Sherwood Sandstone delivery schedule

Site

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

2036

Calverton/ Burnstump (MP3a)

30

30

30

30

30**

30

30

30

30

30

30

30

30

30

30

30

30

30

30

Bestwood 2 (MP3b)

140

140

140

140

140

140

140

140

140

140

140

140

140*

Bestwood 2 North (MP3d)

140

140

140

140

140

140

Scrooby Top (MP3c)

120

120

120

120

120

Scrooby Top North (MP3e)

120

120

120

120

120

120

120

120

120

120

120

120

120

120


For instructions on how to use the system and make comments, please see our help guide.
back to top back to top